General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 51-1-2021
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: Central Forestry District: Area approximately bounded by W. Capitol Dr. and W I-94.
06/09/2021 03:30 PM UTC
OFFICIAL NOTICE 35-1-2021
Traffic Safety Improvements
06/03/2021 03:30 PM UTC
OFFICIAL NOTICE 50-1-2021
PERMANENT PAVEMENT RESTORATION & REPLACEMENT AT STORM INLETS, CATCH BASINS, MANHOLES, AND OTHER LOCATIONS IN: Various Locations Within The City Of Milwaukee
06/02/2021 03:30 PM UTC
OFFICIAL NOTICE 44-1-2021
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, 6” & 7” CONCRETE DRIVEWAYS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING/MILLING, TRAFFIC SIGNALS AND LIGHTING INSTALLATION, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC, ETC.; Located at: ST211180192 – In North 37th Street. – West Marion Street to West Congress Street. ST211190131 – In North Parkway Avenue – West Glendale Avenue to North 18th Street
06/01/2021 03:30 PM UTC
OFFICIAL NOTICE 16-1-2021
SANITARY SEWER MAIN RELAY & SANITARY SEWER LINING IN: W. Morgan Ave. – S. 15th Pl. to S. 17th St. W. Morgan Ave. – S. 86th St. to S. 91st St.
05/28/2021 03:30 PM UTC
OFFICIAL NOTICE 16-2-2021
COMBINED SEWER MAIN RELAY & COMBINED SEWER LINING & MANHOLE REPAIR AND LINING in: N. 37th Pl. - W. McKinley Ave. to W. Vliet St. N. 37th St. - W. McKinley Ave. to W. Vliet St. N. 38th St. - W. McKinley Ave. to W. Vliet St. N. 39th St. - W. McKinley Ave. to W. Vliet St. N. 40th St. - W. McKinley Ave. to W. Vliet St. W. McKinley Ave. - N. 36th St. to N. 40th St.
05/28/2021 03:30 PM UTC
OFFICIAL NOTICE 49-1-2021
DOCKWALL REPAIRS
05/19/2021 03:30 PM UTC
OFFICIAL NOTICE 45-1-2021
CONSTRUCTION OF 5” CONCRETE WALK, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 7” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, VARIABLE THICKNESS CONCRETE BASE, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , CONCRETE AND OTHER REMOVALS, ETC.; Located at: ST230210163 – Area Wide Walk Replacement - Area Bounded By: South 20th Street, West Ohio Street, South 27th Street, to West Morgan Avenue
05/18/2021 03:30 PM UTC
OFFICIAL NOTICE 48-1-2021
PROJECT DESCRIPTIONWATER MAIN RELAYS, at the following locations: N. 80th St. (WT410210600), W. Marion St. to W. Congress St. (16 working days); W. Lynmar Tr. (WT410210601), W. Marion St. to N. 80th St. (12 working days); N. 80th St. (WT410210602), W. Hope Ave. to W. Lynmar Tr. (13 working days); W. Hope Ave. (WT4102021605), N. 78th St. to N. 81st St. (28 working days); W. Carmen Ave. (WT410210657), N. 55th Pl. to N. 60th St. (37 working days); W. Thurston Ave. (WT410210658), 75' E/O N 55th Pl. to N. 58th St. (37 working days); N. 55th Pl. (WT410210659), W. Thurston Ave. to W. Carmen Ave. (19 working days); N. 56th St. (WT410210660), W. Thurston Ave. to W. Carmen Ave. (20 working days); . (Note: Contractor to furnish and install approximately 6148 lin. ft. of 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/12/2021 03:30 PM UTC
OFFICIAL NOTICE 22-1-2021
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING/MILLING, TRAFFIC SIGNALS AND LIGHTING INSTALLATION, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC, ETC.; Located at: TD0948001 – West Becher Street. – South 1St Street to The Kinnickinnic River. East Becher Street - South Kinnickinnic Avenue to South 1st Street
04/30/2021 03:30 PM UTC
531 - 540 of 1553 Solicitations
1 2 50 51 52 54 56 57 58 155 156