General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 75-1-2024
The general work requested is: CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS AND CRACKS, GRAVEL FILLING, CRUSH GRAVEL BASE, CONCRETE REMOVALS, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, TOPSOILING AND SODDING, ETC.; Located at: ST211230105 – In North 23rd Street Humboldt from West Ruby Avenue to West Cornell Street
09/26/2024 03:30 PM UTC
OFFICIAL NOTICE 89-1-2024
SANITARY AND STORM SEWER MAIN RELAY & SANITARY AND STORM SEWER MAIN LINING S. 24th St. - W. Euclid Ave. to W. Ohio Ave. S. 26th St. - W. Oklahoma Ave. to W. Ohio Ave. S. 28th St. - W. Oklahoma Ave. to W. Euclid Ave. S. 29th St. - W. Oklahoma Ave. to 120' South of W. Euclid Ave. W. Euclid Ave. - S. 27th St. to S. 31st St.
09/27/2024 03:30 PM UTC
OFFICIAL NOTICE 98-1-2024
2nd and Plankinton Parking Structure Renovation 2nd and Plankinton parking structure renovation - at east passenger elevator install new water diversion, Alt 1 (expand office, renovate bathroom and demo existing lobby and build new lobby).
10/01/2024 03:30 PM UTC
OFFICIAL NOTICE 106-1-2024
Milwaukee Police Department – Police Administration Building Service, ATS, & Paralleling Gear Upgrades
10/09/2024 03:30 PM UTC
4 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 91-2-2019
DOWNSPOUT DISCONNECTION AREA 2 - NORTHEAST
07/18/2019 03:30 PM UTC
OFFICIAL NOTICE 91-3-2019
DOWNSPOUT DISCONNECTION AREA 3 - CENTRAL
07/18/2019 03:30 PM UTC
OFFICIAL NOTICE 91-4-2019
DOWNSPOUT DISCONNECTION AREA 4 - SOUTH
07/18/2019 03:30 PM UTC
OFFICIAL NOTICE 92-1-2019
Milwaukee Forestry Nursery HVAC System Replacement 8423 South 51st Street Franklin, WI 53132
07/17/2019 03:30 PM UTC
OFFICIAL NOTICE 84-1-2019
WATER MAIN RELAYS at the following locations: S. 15th St.(WT410180600), W. Halsey St. to W. Holmes St.(11 working days); S. 13th St.(WT410180602), W. Holmes Av. to W. Abbott Av.(47 working days); W. Henry Av.(WT410180668), S. 18th St. to S. 20th St.(16 working days); S. 87th St.(WT410190687), W. Morgan Av. to W. Tripoli Av.(60 working days); S. 86th St.(WT410190688), W. Morgan Av. to 275’ S/O W. Wilbur Av.(45 working days); S. 85th St.(WT410190689), W. Morgan Av. to W. Wilbur Av.(37 working days). (Note: Contractor to furnish and install approximately 8,124 lin. Ft. of 12”, 8”, 6”, and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/12/2019 03:30 PM UTC
OFFICAL NOTICE 78-1-2019
BIOSWALES IN: WEST BROWN DEER ROAD FROM NORTH 95TH STREET TO NORTH 214TH STREET PLAN SHEET: 250-043 TO 250-48, 198-5-122, ATTACHEMENT 1 PLAN DATE: 6/14/2019 PROJECT ID: SM499160123
07/08/2019 03:30 PM UTC
OFFICIAL NOTICE 44-1-2019
CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, ETC.; Located at: ST216190108 – ADA Ramps for 2016 High Impact Paving Projects at Various City Wide Locations
07/03/2019 03:30 PM UTC
OFFICIAL NOTICE 80-1-2019
WATER MAIN RELAYS at the following locations: S. 70th St.(WT410190621), W. Arthur Av. to W. Kinnickinnic River Pkwy.(77 working days); S. 71st St.(WT410190622), W. Arthur Av. to W. Dakota St.(64 working days); S. 69th St.(WT410190623), W. Arthur Av. to W. Cleveland Av.(30 working days); W. Harrison Av.(WT410190625), S. 67th St. to S. 71st St.(35 working days); S. 67th St.(WT410190626), 150’ N/O W. Finger Pl. to W. Harrison Av.(14 working days). (Note: Contractor to furnish and install approximately 9,084 lin. Ft. of 12”, 8”, and 6” ductile iron pipe and perform approximately 2 Lead Service Replacements installing approximately 67 lin. Ft. of copper water service, Private Side Only. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/03/2019 03:30 PM UTC
OFFICIAL NOTICE 76-1-2019
Century City Roof Drainage Repairs - Building 36, Century City Business Park
07/02/2019 03:30 PM UTC
OFFICIAL NOTICE 70-1-2019
CONSTRUCTION OF 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, 7 INCH HIGH EARLY STRENGTH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, MANHOLE/INLET REPAIR, AND SODDING & TOPSOIL, CONCRETE WALK AND/OR DRIVEWAY REMOVAL, CURB AND/OR CURB AND GUTTER REMOVAL, ETC.; Located at: ST230190159 - Area 3 - 2019 Sidewalk Replacements Area Bounded By: S. 20th St., W. Oklahoma Ave., S. 27th St. to W. Ohio Ave.
06/27/2019 03:30 PM UTC
551 - 560 of 1386 Solicitations
1 2 52 53 54 56 58 59 60 138 139