General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 75-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9 CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SPEED HUMPS, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: ST211220262 – In N. 39th St./N. Sercombe Rd. – W. Hope Ave. to W. Marion St.
01/06/2026 04:30 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 11-1-2021
CONSTRUCTION AND INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, STREET LIGHTING POLES, CONDUIT AND CABLE INSTALLATION, ELECTRICAL APPURTENANCE REMOVALS, 5” CONCRETE WALK REMOVAL AND REPLACEMENT, ETC.; Located at: TD05688016 – Historic Third Ward Pole and Fixture Installation in: East Chicago Street, North Milwaukee Street, & East Corcoran Street
01/13/2021 04:30 PM UTC
OFFICIAL NOTICE 10-1-2021
2021 Sanitary Bypass Pump & Sanitary Lift Station Inspection and Bypass Pump Wet Testing
01/05/2021 04:30 PM UTC
OFFICIAL NOTICE 103-1-2020
WATER MAIN RELAYS, at the following locations: W. Concordia Ave. (WT410200620), N. 89th St. to N. 98th St. (88 working days); N. 96th St. (WT410200622), N. Colonial Dr. to 240' N/O W. Auer Ave. (28 working days); N. Colonial Dr. (WT410200623), W. Auer Ave. to W. Concordia Ave. (25 working days); W. Auer Ave. (WT410200624), N. 89th St. to N. 97th St. (82 working days); E. Linnwood Ave. (WT410200642), N. Downer Ave. to N. Lake Dr. (46 working days); W. Hampton Ave. (S/S) (WT410200644), N. 84th St. to N. 90th St. (62 working days); (Note: Contractor to furnish and install approximately 11,528 lin. ft. of 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/04/2021 04:30 PM UTC
OFFICIAL NOTICE 96-1-2020
BIOSWALES IN N. Sherman Blvd. – W. Custer Ave. to W. Florist Ave.
12/30/2020 04:30 PM UTC
OFFICIAL NOTICE 108-1-2020
2020 SANITARY BYPASS PUMP REHABILITATION IN: VARIOUS LOACATIONS
12/23/2020 04:30 PM UTC
OFFICIAL NOTICE 98-1-2020
City Of Milwaukee DPW -City Wide Single Space Parking Meter Collection
12/22/2020 04:30 PM UTC
OFFICIAL NOTICE 105-1-2020
75 LEAD SERVICE LINE REPLACEMENTS - WINTER at various locations within the City of Milwaukee.
12/09/2020 04:30 PM UTC
OFFICIAL NOTICE 104-1-2020
UNIT HEATER REPLACEMENT CENTURY CITY BUSINESS PARK, BLDG 36
11/23/2020 04:30 PM UTC
OFFICIAL NOTICE 89-1-2020
CONSTRUCTION OF 7” CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS CRUSHED STONE BASE, CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211190137 – In North 23rd Street from West Wright Street to West Center Street
11/19/2020 04:30 PM UTC
OFFICIAL NOTICE 99-1-2020
ZEIDLER MUNICIPAL BUILDING, 2ND FLOOR, HEALTH LAB HVAC UPGRADES
10/30/2020 03:30 PM UTC
551 - 560 of 1523 Solicitations
1 2 52 53 54 56 58 59 60 152 153