General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 88-1-2026
PROJECT NO. 1: COMBINED SEWER MAIN RELAY Located at: W. Keefe Ave. – N. 13th St. to N. 17th St.
10/19/2026 03:30 PM UTC
OFFICIAL NOTICE 84-1-2026
This project consists of dismantling the processing equipment from the tip floor and processing floor within a fire damaged building. The building and equipment have fire damage throughout. Any hazardous material will need to be removed and disposed of according to state and federal regulations. All furniture must be removed and disposed of and the entire space swept free of debris.
10/30/2026 03:30 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 56-1-2018
FLOATING ISLANDS IN: Hartung Park Wet Detention Pond – East of Menomonee River Parkway and south of West Keefe Avenue
05/30/2018 03:30 PM UTC
OFFICIAL NOTICE 77-1-2018
POLICE DISTRICT STATIONS ADA REMODELING 2ND DISTRICT, 245 W LINCOLN AVENUE 4TH DISTRICT, 6929 W SILVER SPRING DRIVE, 6TH DISTRICT, 3006 S 27TH STREET 7TH DISTRICT, 3626 W FOND DU LAC AVENUE MILWAUKEE, WI
05/25/2018 03:30 PM UTC
OFFICIAL NOTICE 61-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, 7” CONCRETE DRIVEWAY, 5” CONCRETE WALK, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE DRIVEWAYS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.
05/24/2018 03:30 PM UTC
OFFICIAL NOTICE 78-1-2018
WATER MAIN RELAYS at the following locations: W. Crossfield Av. (WT410180654), W. Douglas Av. to W. Bender Av. (17 working days); W. Winfield Av. (WT410180655), W. Bender Av. to 190 Ft. E/O N. 89th St. (17 working days); W. Bender Av. (WT410180656), N. Joyce Av. to N. 91st St. (34 working days); W. Monrovia Av. (WT410180657), W. Crossfield Av. to W. Bender Av. (35 working days); N. 89th St. (WT410180658), W. Lynx Av. to W. Monrovia Av. (13 working days); W. Douglas Av. (WT410180659), N. Joyce Av. to N. 89th St. (30 working days); W. Lynx Av. (WT410180660), N. 84th St. to N. 89th St. (45 working days); N. Joyce Av. (WT410180661), W. Lynx Av. to W. Mill Rd. (36 working days); N. 86th Ct. (WT410180662), N. Joyce Av. to 320 Ft. NE/O N. Joyce Av. (11 working days); W. Kaul Av. (WT410180663), N. 84th St. to N. 87th St. (28 working days); N. 87th St. (WT410180664), W. Kaul Av. to W. Douglas Av. (13 working days). (Note: Contractor to furnish and install approximately 13,199 lin. ft. of ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/23/2018 03:30 PM UTC
OFFICIAL NOTICE 005-1-2018
SANITARY AND COMBINED SEWER MAIN RELAY, COMBINED SEWER MAIN LINING AND MANHOLE REPAIR AND LINING in: Located at: N. 33rd St. – 220’ +/- South of W. Clybourn St. to W. Clybourn St. N. 41st St. – W. Hampton Ave. to W. Stark St. E. Bradford Ave. – N. Frederick Ave. to N. Maryland Ave. E. Wisconsin Ave. – N. Broadway to N. Water St.
05/22/2018 03:30 PM UTC
OFFICIAL NOTICE 41-1-2018
LINCOLN GARAGE REROOFING 3921 W LINCOLN AVENUE MILWAUKEE, WISCONSIN
05/21/2018 03:30 PM UTC
OFFICIAL NOTICE 66-1-2018
POLICE ADMINISTRATION BUILDING 3RD FLOOR RENOVATIONS 749 WEST STATE STREET MILWAUKEE WI 53233
05/17/2018 03:30 PM UTC
OFFICIAL NOTICE 76-1-2018
Poured-In-Place Resilient Rubber Surface Installation Various MKE Parks Locations Milwaukee WI
05/14/2018 03:30 PM UTC
OFFICIAL NOTICE 65-1-2018
WATER MAIN RELAY at the following location: W. Vliet St. (WT410180007), N. 12th St. to N. 27th St. (120 working days). (Note: Contractor to furnish and install approximately 7,548 lin. ft. of 16", 12", 8", 6", 4" and 3" ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
05/07/2018 03:30 PM UTC
OFFICIAL NOTICE 62-1-2018
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, INSTALLATION OF PERMEABLE PAVERS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE WALKS AND/OR CONCRETE DRIVEWAYS, VARIABLE THICKNESS CRUSHED STONE DRIVEWAYS, CRACKING AND SEATING CONCRETE PAVEMENT, CONCRETE AND OTHER REMOVALS, SEWER WORK, ETC.
05/03/2018 03:30 PM UTC
931 - 940 of 1611 Solicitations