General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 29-1-2026
SOUTH 16TH STREET BRIDGE OVER KINNICKINNIC RIVER REPAIRS.
02/24/2026 04:30 PM UTC
OFFICIAL NOTICE 30-1-2026
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE CITY-OWNED LOT AREA 4. MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: NORTH AVENUE, NORTH 20TH ST, CAPITOL DRIVE, AND NORTH 13TH ST.
02/25/2026 04:30 PM UTC
OFFICIAL NOTICE 30-2-2026
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE CITY-OWNED LOT AREA 10. MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: INTERSTATE 94 AND SOUTH CITY LIMIT
02/25/2026 04:30 PM UTC
OFFICIAL NOTICE 2-1-2026
PROJECT NO. 1: SANITARY, STORM, AND COMBINED SEWER MAIN RELAY N. 6th St. – 250’ ± S. of W. Vienna Ave. to W. Vienna Ave. N. 23rd St. – 140’ N. of W. McKinley Ave. to 240’ N. of W. McKinley Ave. N. 39th St. – W. Fairmount Ave. to W. Lancaster Ave. N. 53rd St. – W. Center St. to W. Hadley St. W. McKinley Ave. – N. 23rd St. to N. 24th St.
02/26/2026 04:30 PM UTC
OFFICIAL NOTICE 26-1-2026
200 LEAD SERVICE LINE REPLACEMENTS
02/27/2026 04:30 PM UTC
OFFICIAL NOTICE 26-2-2026
200 LEAD SERVICE LINE REPLACEMENTS
02/27/2026 04:30 PM UTC
OFFICIAL NOTICE 33-6-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 6: North Forestry District: Area approximately bounded by W Hampton Av. to North City limits
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-5-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 5: North Forestry District: Area approximately bounded by W Center St. to W Hampton Av.
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-4-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 4: Central Forestry District: Area approximately bounded by W Congress St. to W Center St. & N Sherman Blvd. to Lake Michigan
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-3-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: Central Forestry District: Area approximately bounded by W Center St. to W I-94
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-2-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: South Forestry District: Area approximately bounded by W I-94 to W Oklahoma Av.
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-1-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: South Forestry District: Area approximately bounded by W Oklahoma Av. to South City Limits
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 25-3-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 3: Area 3 - West City limits to east city limits, and approximately Villard Ave south to Capitol Dr.
03/06/2026 04:30 PM UTC
OFFICIAL NOTICE 25-2-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 2: Area 2 - Approximately west City Limits to the east City limits, and Mill Rd south to Villard Ave.
03/06/2026 04:30 PM UTC
OFFICIAL NOTICE 25-1-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 1: Approximately west City Limits to the east City limits, and County Line Rd south to Mill Rd.
03/06/2026 04:30 PM UTC
15 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 70-1-2017
WATER MAIN RELAYS at the following locations: N. 80Th St. (WT41017069), W. Congress St. to W. Ruby Ave. (11 working days); W. Potomac Ave. (WT410170610), W. Ruby Ave. to W. Courtland Ave. (42 working days); S. Herman St. (WT410170652), E. Doty Pl. to S Whitnall Ave. (12 working days); E. Waterford Ave. (WT410170654), S. Lenox St. to S. Herman St. (15 working days); N. 84Th St (WT410170675), W. Courtland Ave to W. Hampton Ave (30 working days); W. Ruby Ave. (WT410170677), N. 82nd. to N. 83Rd St (12 working days); (Note: Contractor to furnish and install approximately 4,767 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
07/05/2017 03:30 PM UTC
OFFICIAL NOTICE 75-1-2017
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, INSTALLATION OF PERMEABLE PAVERS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST212060105 – Alley BB- W. Chambers St., W. Locust St., N. 76th St., & N.77th St. (Permeable Alley Pavement) ST212010143 – Alley BB- W. Auer Av., W. Concordia Ave., N. 87th St., & N. 88th St. (Permeable Alley Pavement) ST212080102 – Alley BB- W. Keefe Ave., W. Medford Ave., W. Roosevelt Dr., N. 45th St. & W. Scranton Pl. (Permeable Alley Pavement) ST212160113 – Alley BB- Auer Av., W. Burleigh St., N. 54th St., & N. 55th St. (Nth/Sth Leg) (Permeable Alley Pavement) ST212160102 – Alley between W. Capitol Dr., W. Melvina St., N. 64th St. & N. 65th St. (Concrete Alley Pavement)
07/05/2017 03:30 PM UTC
OFFICIAL NOTICE 84-1-2017
THE INSTALLATION OF CUC MANHOLES, ENCASED NONMETALLIC CONDUIT, CONSTRUCTION OF TEMPORARY 3” CONCRETE, 5” CONCRETE WALK, CONCRETE REMOVALS, ETC.; Located at: TD04884042 - W. Juneau Ave. - N. Old World Third St. to N. 4th St.; N. 4th St – W. Highland Ave. to W. Juneau Ave.; N. 5th St. - W. Juneau Ave. to Parking Structure
07/03/2017 03:30 PM UTC
OFFICIAL NOTICE 40-1-2017
PERFORM COMPLETE TEAR-OFF OF METER SHOP ROOF AT 3929 W. CAMERON AVENUE. PROVIDE BUILT-UP ROOF, FASCIA AND MISCELLANEOUS ITEMS
06/29/2017 03:30 PM UTC
OFFICIAL NOTICE 69-1-2017
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, INSTALLATION OF PERMEABLE PAVERS, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST212160116 – Alley BB- W. Burnham St., Rogers St., S. 12th St., & S. 13th St. (Concrete Alley Pavement) ST212140104 – Alley BB- W. Greenfield Ave., S. Layton Blvd., W. Scott St., & S. 28th St. (Permeable Alley Pavement) ST212160110 – Alley BB- W. Main St., S. 61st St., S. 62nd St., & Lands North (Permeable Alley Pavement) ST212060106 – Alley between W. Cleveland Ave., W. Montana St., S. 49th St., & S. 50th St. (Permeable Alley Pavement)
06/27/2017 03:30 PM UTC
OFFICIAL NOTICE 85-1-2017
LEAD SERVICE LINE REPLACEMENT, at 20 locations, by qualified City of Milwaukee licensed and bonded contractors (40 working days). Locations will be at various sites throughout the City of Milwaukee.
06/22/2017 03:30 PM UTC
OFFICIAL NOTICE 27-1-2017
SANITARY AND COMBINED SEWER MAIN RELAY & SANITARY, COMBINED, AND STORM SEWER MAIN LINING, & MANHOLE REPAIR AND LINING IN: S. Chase Ave. – 70’+/- S. of S. 5th Place to S. 6th St., N. Green Bay Ave. – N. 13th St. to W. Congress St., W. Juneau Ave. – 160’+/- W. of N 46th St to 255’+/- W. of N. 46th St.
06/21/2017 03:30 PM UTC
OFFICIAL NOTICE 27-2-2017
COMBINED SEWER MAIN RELAY, & COMBINED SEWER MAIN LINING, & MANHOLE REPAIR AND LINING in: Alley W. of N. Milwaukee St. – E. Michigan St. to 120’+/- N. of E. Michigan St.; N. Jackson St. – 180’+/- S. of E. St. Paul Av. to E. St. Paul Av.; N. James Lovell St. – 215’+/- S. of W. State St. to W. State St.; W. Wells St. – N. 6th St. to N. 8th St.
06/21/2017 03:30 PM UTC
OFFICIAL NOTICE 74-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 9” CONCRETE PAVEMENT, 8” CONCRETE BASE, VARIABLE THICKNESS CONCRETE BASE, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, 7” HIGH EARLY STRENGHT CONCRETE, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: ST21160108 - N. Maryland Ave. - N. Prospect Ave. to E. Newberry Blvd.
06/20/2017 03:30 PM UTC
OFFICIAL NOTICE 79-1-2017
CONSTRUCTION OF 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELDS, AND CONCRETE WALKS, DRIVEWAYS, AND CONCRETE CURB AND GUTTER REMOVALS, ETC.; Located at: (ST230170154) Scatter Sites Sidewalk Replacements – 2017 At Various Locations City Wide
06/15/2017 03:30 PM UTC
961 - 970 of 1532 Solicitations
1 2 93 94 95 97 99 100 101 153 154