General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 7-1-2026
PROJECT NO. 1: COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING. S. 12th St. – W. Manitoba St. to W. Oklahoma Ave. W. Manitoba St. – S. 6th St. to S. 12th St.
09/10/2026 03:30 PM UTC
OFFICIAL NOTICE 7-2-2026
PROJECT NO.2: COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING E. Erie St. – 150’+/- NW. of N. Broadway to N. Broadway E. Menomonee St. – N. Broadway to N. Jefferson St.
09/10/2026 03:30 PM UTC
OFFICIAL NOTICE 81-1-2026
Northwest Garage & DPW Field Headquarters – Air Handling Unit Replacement The project involves two different project sites. At the DPW Field Headquarters an existing rooftop unit will be removed and replaced with a new rooftop unit. At the Northwest Garage an existing air handling unit, energy recovery unit, and associated VAV boxes will be removed and replaced with a new rooftop unit, new VAV boxes, and new energy recovery unit. Both locations include controls improvements. There is mechanical, structural, and controls scope (NIC).
09/17/2026 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 114-1-2018
WATER MAIN RELAYS at the following locations: N. 84th St. (E/S) (WT410180605), W. Hope Av. to W. Marion St. (19 working days); N. 77th St./ W. Potomac Av. (WT410180667), W. Fiebrantz Av. to N. 80th St. (57 working days); W. Hope Av. (WT410180672), N. 60th St. to N. 61st St. (14 working days); N. 61st St. (WT410180673), W. Fiebrantz Av. to W. Congress St. (59 working days); N. 74th St. (WT410180690), W. Marion St. to W. Congress St. (18 working days); W. Marion St. (WT410180691), N. 73rd St. to N. 74th St. (8 working days). (Note: Contractor to furnish and install approximately 6,143 lin. ft. of 16”, 12”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
08/08/2018 03:30 PM UTC
OFFICIAL NOTICE 67-1-2018
WP-324: NE & NW COAGULATION BASIN FLOCCULATOR UPGRADES LOCATED AT LINNWOOD WATER TREATMENT PLANT, 3000 NORTH LINCOLN MEMORIAL DRIVE, MILWAUKEE, WI 53211
08/03/2018 03:30 PM UTC
OFFICIAL NOTICE 79-1-2018
CONSTRUCTION OF 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST21100102 - S. 3rd St. - W. Maple St. to W. Lapham Blvd.
08/02/2018 03:30 PM UTC
OFFICIAL NOTICE 115-1-2018
78 LEAD SERVICE LINE REPLACEMENTS at childcare facilities within the City of Milwaukee.
08/02/2018 03:30 PM UTC
OFFICIAL NOTICE 93-1-2018
GREEN STREET BIOSWALES IN: West Good Hope Road from 595’ +/- West of North 51st Street to 50’ +/- East of North 90th Boulevard.
08/01/2018 03:30 PM UTC
OFFICIAL NOTICE 7-1-2018
COMBINED AND STORM SEWER MAIN RELAY AND COMBINED SEWER MAIN LINING: Located at: S. 25th St. – W. Becher St. to W. Grant St. S. 29th St. – W. Grant St. to W. Lincoln Ave. S. 30th St. – W. Grant St. to W. Lincoln Ave. W. Grant St. – S. 25th St. to S. 30th St. W. Harrison Ave. – S. 27th St. to S. 28th St. W. Lincoln Ave. – S. 28th St. to S. 31st St.
07/31/2018 03:30 PM UTC
OFFICIAL NOTICE 107-1-2018
INSTALLATION OF LED TRAFFIC SIGNAL MODULES 12 - INCH
07/30/2018 03:30 PM UTC
OFFICIAL NOTICE 97-1-2018
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211150108 – S. 19th St. - W. Edgerton Ave. to 100’ n/o W. Halsey Ave. ST211150107 – S. 16th St. – W. Edgerton Ave. to 300’ n/o W. Holmes Ave.
07/26/2018 03:30 PM UTC
OFFICIAL NOTICE 82-1-2018
Sealed bids will be opened on WEDNESDAY, JULY 25, 2018 at 10:30 A.M. for PAVING WORK, in the following locations: CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, 8” CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, WATER WORK, ETC.; Located at: ST211070132 – S. 91st St. - 300'+/- s/o W. Adler St. to W. Adler St. ST211180114 – W. Verona Ct. - S. 77th St. to S. 70th St. ST211180115 – S. 28th St. - W. National Ave. to W. Pierce St. ST211180106 – S. 54th ST. - W. Midland Dr. to W. Forest Home Ave.
07/25/2018 03:30 PM UTC
OFFICIAL NOTICE 106-1-2018
50 LEAD SERVICE LINE REPLACEMENTS at various locations within the City of Milwaukee.
07/24/2018 03:30 PM UTC
891 - 900 of 1606 Solicitations
1 2 86 87 88 90 92 93 94 160 161