General Info

Business Logo

City of Piqua

201 W Water St Purchasing Department, Piqua, OH 45356-2235
(937) 778-3176

The City of Piqua Development Department is responsible for overseeing the planning, design, construction, inspection, and administration of public works improvement projects as well as the review and inspection of private development projects.

The Development Department’s goal is to act on behalf of the citizens of Piqua by overseeing all of the public works improvement projects to ensure the high level of quality service that the citizens of Piqua have come to expect from the City’s infrastructure and public facilities.

Standard Documents

Name * Description
Bid Form Acknowledgement.pdf (15.6 KB)
Bidder Required to Acknowledge
Bid Bond Form (Rev 2020).pdf (111 KB)
Bid Guaranty Bond Form
Electronic bidding information Rev March 2022.pdf (61.7 KB)
Online Bidding Instructions
Business Tax Registration Form 48.pdf (379 KB)
Income-Tax-Questionnaire RITA FORM 48
W9 Blank FORM 2024.pdf (138 KB)
New Vendor form to be completed and uploaded
C700 General Conditions 2018. FINAL.pdf (635 KB)
SAMPLE to be included in the contract
C800-Supplementary-Conditions-2018 PIQUA 04.05.2023. pdf.pdf (418 KB)
SAMPLE to be included in the contract
7 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
2020 STREET RESURFACING PROGRAM
CITY OF PIQUA - 20-01 STREET RESURFACING PROGRAM. ENGINEER’S ESTIMATE: $670,000. In general, the Work consists of the planing of asphalt, adjustment of manholes and water valves, and the placement of an asphalt surface course and pavement markings on various streets throughout the city.
03/03/2020 03:00 PM UTC
2019 STREET RESURFACING PROGRAM
CITY OF PIQUA - 19-01 STREET RESURFACING PROGRAM. In general, the Work consists of the planing of asphalt, adjustment of manholes and water valves, and the placement of an asphalt surface course and pavement markings on various streets throughout the city.
02/05/2019 03:00 PM UTC
2019 SIDEWALK ADA COMPLIANCE PROGRAM
CITY OF PIQUA - 19-02 SIDEWALK ADA COMPLIANCE PROGRAM. In general, the Work consists of the replacement of catch basins and the installation of concrete curbing, sidewalk, and truncated dome pavers at radii and other miscellaneous locations along the streets to be resurfaced.
02/05/2019 03:00 PM UTC
18-13 MUNICIPAL GOVERNMENT COMPLEX LOBBY MODIFICATIONS
CITY OF PIQUA - 18-13 MUNICIPAL GOVERNMENT COMPLEX LOBBY MODIFICATIONS PUBLIC WORKS BUILDING RENOVATION. ENGINEER’S ESTIMATE $59,000. In general, the work consists of modifying the Utility Business Office and the Income Tax department customer service areas.
01/24/2019 03:00 PM UTC
18-11 ADA RAMP INSTALLATION PROJECT
CITY OF PIQUA - 18-11 ADA RAMP INSTALLATION PROJECT. ENGINEER’S ESTIMATE: $60,000. In general, the Work consists of the installation of concrete curbing, sidewalk, and truncated dome pavers at radii and other miscellaneous locations along the recently resurfaced streets.
09/18/2018 02:00 PM UTC
18-09 WAYFINDING PROGRAM CITYWIDE PHASE
CITY OF PIQUA - 18-09 WAYFINDING PROGRAM – CITYWIDE PHASE. ENGINEER’S ESTIMATE: $745,360. In general, the Work consists of the fabrication and installation of wayfinding and facility signs, and the excavation, pavement demolition and restoration work incidental to each sign installation.
09/18/2018 02:00 PM UTC
18-10 COMMERCIAL STREET UTILITIES PROJECT
CITY OF PIQUA - COMMERCIAL STREET UTILITIES PROJECT. ENGINEER’S ESTIMATE: Base Bid: $260,114.47 and Alternative Bid: $336,204.26 In general, the Work consists of replacing and moving storm, water, and sanitary lines along Commercial Street and cross streets south of Miami Street. Manholes and catch basins will also be replaced.
08/15/2018 02:00 PM UTC
15-06 WASTEWATER PUMP STATION REHABILITATION PROJECT
CITY OF PIQUA - WASTEWATER PUMP STATION REHABILITATION PROJECT. ENGINEER’S ESTIMATE $1,690,000 The Project consists of improvements to eight existing wastewater pump stations. One or more of the following primary tasks will be performed at each Pump Station: demolition of existing pump station; construction of a new submersible pump station and appurtenances; installation of a new manual transfer switch; installation of new 8-inch sanitary sewer and manholes, restoration of pavement, curb and gutter, and turf areas.
08/15/2018 02:00 PM UTC
2018 SIDEWALK ADA COMPLIANCE PROGRAM PHASE II
CITY OF PIQUA - 18-06 SIDEWALK ADA COMPLIANCE PROGRAM – PHASE II. In general, the Work consists of the replacement of catch basins and the installation of concrete curbing, sidewalk, and truncated dome pavers at radii and other miscellaneous locations along the streets to be resurfaced.
05/09/2018 02:00 PM UTC
HEALTH & SANITATION FACILITY
CITY OF PIQUA - 17-09 HEALTH & SANITATION FACILITY. In general, the Work consists of the construction of a new 15,000 sf Health & Sanitation Facility located at 156 Robert M. Davis Parkway, Piqua, OH 45356.
05/09/2018 02:00 PM UTC
31 - 40 of 73 Solicitations
1 2 4 6 7 8