General Info

Business Logo

City of Piqua

201 W Water St Purchasing Department, Piqua, OH 45356-2235
(937) 778-3176

The City of Piqua Development Department is responsible for overseeing the planning, design, construction, inspection, and administration of public works improvement projects as well as the review and inspection of private development projects.

The Development Department’s goal is to act on behalf of the citizens of Piqua by overseeing all of the public works improvement projects to ensure the high level of quality service that the citizens of Piqua have come to expect from the City’s infrastructure and public facilities.

Standard Documents

Name * Description
Bid Form Acknowledgement.pdf (15.6 KB)
Bidder Required to Acknowledge
Bid Bond Form (Rev 2020).pdf (111 KB)
Bid Guaranty Bond Form
Electronic bidding information Rev March 2022.pdf (61.7 KB)
Online Bidding Instructions
Business Tax Registration Form 48.pdf (379 KB)
Income-Tax-Questionnaire RITA FORM 48
W9 Blank FORM 2024.pdf (138 KB)
New Vendor form to be completed and uploaded
C700 General Conditions 2018. FINAL.pdf (635 KB)
SAMPLE to be included in the contract
C800-Supplementary-Conditions-2018 PIQUA 04.05.2023. pdf.pdf (418 KB)
SAMPLE to be included in the contract
7 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
2018 STREET RESURFACING PHASE II
CITY OF PIQUA - 18-05 STREET RESURFACING PROGRAM - PHASE II. In general, the Work consists of the planing of asphalt, adjustment of manholes and water valves, and the placement of an asphalt surface course and pavement markings on various streets throughout the city.
05/03/2018 02:00 PM UTC
2018 SIDEWALK ADA COMPLIANCE PROGRAM
CITY OF PIQUA - 18-02 SIDEWALK ADA COMPLIANCE PROGRAM. In general, the Work consists of the replacement of catch basins and the installation of concrete curbing, sidewalk, and truncated dome pavers at radii and other miscellaneous locations along the streets to be resurfaced.
02/21/2018 03:00 PM UTC
2018 STREET RESURFACING PROGRAM
CITY OF PIQUA - 18-01 STREET RESURFACING PROGRAM. In general, the Work consists of the planing of asphalt, adjustment of manholes and water valves, and the placement of an asphalt surface course and pavement markings on various streets throughout the city.
02/21/2018 03:00 PM UTC
17-08 PUBLIC WORKS BUILDING RENOVATION
CITY OF PIQUA - 17-08 PUBLIC WORKS BUILDING RENOVATION. ENGINEER’S ESTIMATE $245,000. In general, the Work consists of removal and replacement of the existing west exterior wall of the Public Works Building located at 859 South Main Street, Piqua, OH 45356.
10/24/2017 02:00 PM UTC
2017 CATCH BASIN REPLACEMENT PROGRAM
CITY OF PIQUA - 2017 CATCH BASIN REPLACEMENT PROGRAM - In general, the Work consists of the replacing 24 catch basins in the public right of way. The basins are of different size and material, but will all be replaced according to the City’s of Piqua’s desired catch basin specifications. Curb and sidewalk damaged during catch basin replacement shall also be replaced.
09/06/2017 02:00 PM UTC
17-03 WAYFINDING PROGRAM
CITY OF PIQUA - 17-03 WAYFINDING PROGRAM. ENGINEER’S ESTIMATE $89,000. In general, the Work consists of the fabrication and installation of wayfinding and facility signs, and the excavation, pavement demolition and restoration work incidental to each sign installation.
07/19/2017 02:00 PM UTC
COVINGTON AVENUE RESURFACING PROJECT MIA-36-8.92, PID 103080
CITY OF PIQUA - COVINGTON AVENUE RESURFACING PROJECT MIA-36-8.92, PID 103080. ENGINEER’S ESTIMATE $543,069 - This project has a DBE Goal of 6%. - In general, the Work consists of the planing of asphalt, adjustment of water valves and manholes, placement of an asphalt surface course and pavement markings, and the installation of ADA compliant handicap ramps at various intersections within the paving limits.
05/31/2017 02:00 PM UTC
PIQUA AIRPORT HARTZELL FIELD PAPI INSTALLATION
CITY OF PIQUA - Piqua Airport - Hartzell Field PAPI Installation. In general, the work consists of the Installation of two PAPI visual guidance slope indicator systems; one for Runway 8 and one for Runway 26 at the Piqua Airport – Hartzell Field.
05/24/2017 02:00 PM UTC
17-01 STREET RESURFACING PROGRAM.
CITY OF PIQUA - 17-01 STREET RESURFACING PROGRAM. In general, the Work consists of the planing of asphalt, adjustment of manholes and water valves, and the placement of an asphalt surface course and pavement markings on various streets throughout the city.
04/20/2017 02:00 PM UTC
17-02 SIDEWALK ADA COMPLIANCE PROGRAM.
CITY OF PIQUA - 17-02 SIDEWALK ADA COMPLIANCE PROGRAM. In general, the Work consists of the replacement of catch basins and the installation of concrete curbing, sidewalk, and truncated dome pavers at radii and other miscellaneous locations along the streets to be resurfaced.
04/04/2017 02:00 PM UTC
41 - 50 of 73 Solicitations
1 2 3 5 7 8