General Info

Business Logo

City of Piqua

201 W Water St Purchasing Department, Piqua, OH 45356-2235
(937) 778-3176

The City of Piqua Development Department is responsible for overseeing the planning, design, construction, inspection, and administration of public works improvement projects as well as the review and inspection of private development projects.

The Development Department’s goal is to act on behalf of the citizens of Piqua by overseeing all of the public works improvement projects to ensure the high level of quality service that the citizens of Piqua have come to expect from the City’s infrastructure and public facilities.

Standard Documents

Name * Description
Bid Form Acknowledgement.pdf (15.6 KB)
Bidder Required to Acknowledge
Bid Bond Form (Rev 2020).pdf (111 KB)
Bid Guaranty Bond Form
Electronic bidding information Rev March 2022.pdf (61.7 KB)
Online Bidding Instructions
Business Tax Registration Form 48.pdf (379 KB)
Income-Tax-Questionnaire RITA FORM 48
W9 Blank FORM 2024.pdf (138 KB)
New Vendor form to be completed and uploaded
C700 General Conditions 2018. FINAL.pdf (635 KB)
SAMPLE to be included in the contract
C800-Supplementary-Conditions-2018 PIQUA 04.05.2023. pdf.pdf (418 KB)
SAMPLE to be included in the contract
7 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
13-06 NEW CENTRAL WATER TOWER
CITY OF PIQUA - NEW CENTRAL WATER TOWER In general, the Work consists of the construction of a 1,000,000 gallon elevated water tower, foundations, and access driveway, completion of demolition of two multi-legged steel elevated water towers, and performance of associated surface restoration.
07/25/2016 06:00 PM UTC
DRAKE ROAD WATER LINE EXTENSION
CITY OF PIQUA - DRAKE ROAD WATER LINE EXTENSION In general, the Work consists of the installation of approximately 5,300 linear feet of 12 inch water line and appurtenances by both open-cut and trenchless construction techniques and associated surface restoration.
07/11/2016 03:00 PM UTC
16-05 CSX RAILROAD BRIDGE OVER E. ASH STREET
CITY OF PIQUA - CSX RAILROAD BRIDGE OVER E. ASH STREET. In general, the Work consists of the surface preparation of the existing structural steel and the field painting of the structural steel along with the associated maintenance of traffic on U.S. Route 36.
06/30/2016 02:00 PM UTC
16-07 CEDARBROOK WATER LINE REPLACEMENT PROJECT
CITY OF PIQUA - 16-07 CEDARBROOK WATER LINE REPLACEMENT PROJECT. In general, the Work consists of the installation of approximately 850 LF of 8” ductile iron water main along with valves, hydrants, water services, and other miscellaneous appurtances. Work also includes the restoration of excavated areas including concrete, asphalt pavement, and turf.
05/26/2016 01:00 PM UTC
Spiker Road Resurfacing Project
CITY OF PIQUA - 16-10 Spiker Road Resurfacing Project. In general, the Work consists of the resurfacing of approximately 1 mile of roadway on Spiker Road between US Route 36 and Piqua Clayton Road, pavement repairs, the installation of berm, and the installation of pavement markings.
05/24/2016 02:00 PM UTC
16-01 STREET RESURFACING PROGRAM
CITY OF PIQUA - 16-01 STREET RESURFACING PROGRAM. In general, the Work consists of the planing of asphalt, adjustment of manholes and water valves, and the placement of an asphalt surface course and pavement markings on various streets throughout the city.
04/13/2016 02:00 PM UTC
16-02 SIDEWALK ADA COMPLIANCE PROGRAM
CITY OF PIQUA - 16-02 SIDEWALK ADA COMPLIANCE PROGRAM. In general, the Work consists of the installation of concrete curbing, sidewalk, and truncated dome pavers at radii and other miscellaneous locations along the streets to be resurfaced.
03/16/2016 02:00 PM UTC
15-05 GARBRY ROAD WATER MAIN EXTENSION
CITY OF PIQUA - 15-05 GARBRY ROAD WATER MAIN EXTENSION. In general, the Work consists of the installation of approximately 2500 LF of 16” ductile iron water main, along with valves, hydrants, and other miscellaneous fixtures. Work also includes the restoration of excavated areas including, asphalt pavement, and turf.
06/23/2015 02:00 PM UTC
CITY OF PIQUA 13-05
CITY OF PIQUA 13-05 D07-SRTS MIA PIQUA INFRASTRUCTURE PID 93747 In general, the Work consists of the installation of ADA compliant handicap ramps, new sidewalks, a bike path, traffic signal improvements, intersection improvements, and other pedestrian infrastructure.
06/23/2015 02:00 PM UTC
15-03 Garnsey Street Sidewalk Replacement
CITY OF PIQUA, OHIO - 15-03 Garnsey Street Sidewalk Replacement. In general, the Work consists of the replacement of portions of sidewalk and drive approaches for the 300 and 400 blocks of Garnsey Street.
06/16/2015 02:00 PM UTC
51 - 60 of 73 Solicitations
1 2 3 4 6 8