General Info

Business Logo

City of Piqua

201 W Water St Purchasing Department, Piqua, OH 45356-2235
(937) 778-3176

The City of Piqua Development Department is responsible for overseeing the planning, design, construction, inspection, and administration of public works improvement projects as well as the review and inspection of private development projects.

The Development Department’s goal is to act on behalf of the citizens of Piqua by overseeing all of the public works improvement projects to ensure the high level of quality service that the citizens of Piqua have come to expect from the City’s infrastructure and public facilities.

Standard Documents

Name * Description
Bid Form Acknowledgement.pdf (15.6 KB)
Bidder Required to Acknowledge
Bid Bond Form (Rev 2020).pdf (111 KB)
Bid Guaranty Bond Form
Electronic bidding information Rev March 2022.pdf (61.7 KB)
Online Bidding Instructions
Business Tax Registration Form 48.pdf (379 KB)
Income-Tax-Questionnaire RITA FORM 48
W9 Blank FORM 2024.pdf (138 KB)
New Vendor form to be completed and uploaded
C700 General Conditions 2018. FINAL.pdf (635 KB)
SAMPLE to be included in the contract
C800-Supplementary-Conditions-2018 PIQUA 04.05.2023. pdf.pdf (418 KB)
SAMPLE to be included in the contract
7 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
14-06 PIQUA AIRPORT-HARTZELL FIELD CRACK SEAL AND REMARKING
CITY OF PIQUA, OHIO - 14-06 Piqua Airport-Hartzell Field Crack Seal and Remarking. In general, the Work consists of crack sealing and remarking of runway 8-26, including the runway holding position markings. PRE-BID MEETING (NON-MANDATORY) April 20, 2015 @ 10:00 A.M. Piqua-Hartzell Field Airport 5465 West State Route 185 Piqua, Ohio 45356 Bid opening date changed to Thursday, May 7 at 2:00 p.m.
05/07/2015 06:00 PM UTC
14-09 WESTERN INTERCEPTOR TO ECHO LAKE
CITY OF PIQUA, OHIO - 14-09 Western Ditch of Echo Lake, Storm Sewer Improvements. In general, the Work consists of the installation of approximately 331 LF of 24” and 30” storm sewer pipe, manholes, headwall, rock channel protection and other miscellaneous appurtenances. Work also includes the restoration of the Western Ditch of Echo Lake including tree and debris removal, excavation and embankment, seeding and mulching, rock check dams and rock channel protection.
04/30/2015 02:00 PM UTC
15-02 SIDEWALK ADA COMPLIANCE PROGRAM
CITY OF PIQUA - 15-02 SIDEWALK ADA COMPLIANCE PROGRAM. In general, the Work consists of the replacement of catch basins and the installation of concrete curbing, sidewalk, and truncated dome pavers at radii and other miscellaneous locations along the streets to be resurfaced.
03/30/2015 02:00 PM UTC
15-01 STREET RESURFACING PROGRAM
CITY OF PIQUA - STREET RESURFACING PROGRAM In general, the Work consists of the planing of asphalt, adjustment of manholes and water valves, and the placement of an asphalt surface course and pavement markings on various streets throughout the city.
03/30/2015 02:00 PM UTC
14-08 Hemm Road and Ridge Street Water Main Extension
CITY OF PIQUA - HEMM ROAD AND RIDGE STREET WATER MAIN EXTENSION. In general, the Work consists of the installation of approximately 2100 LF of 16” ductile iron water main, 500 LF of 8” ductile iron water main, along with valves, hydrants, water services, and other miscellaneous appurtances. Work also includes the restoration of excavated areas including concrete, asphalt pavement, and turf.
07/17/2014 02:00 PM UTC
14-01 Street Resurfacing Program
CITY OF PIQUA, OHIO - 14-01 Street Resurfacing Program. In general, the Work consists of the planing of asphalt, adjustment of manholes and water valves, and the placement of an asphalt surface course and pavement markings on various streets throughout the city.
07/01/2014 02:00 PM UTC
14-02 Sidewalk ADA Compliance Program
Project Number: 14-02 Sidewalk ADA Compliance Program - In general, the Work consists of the replacement of catch basins and the installation of concrete curbing, sidewalk, and truncated dome pavers at radii and other miscellaneous locations along the streets to be resurfaced. Final completion date September 30, 2014
06/03/2014 02:00 PM UTC
CITY OF PIQUA - CR 25A Pavement Marking Project 13-17
CITY OF PIQUA - CR 25A Pavement Marking Project 13-17. In general, the Work consists of the removal of existing pavement markings and the installation of new pavement markings. The City requires that this project be thoroughly coordinated and completed within 24 hours of the completion of the pavement marking portion of the MIA-CR25A-14.87, PID 95643 project in the City of Piqua.
04/25/2014 02:00 PM UTC
13-02 CR 25-A Resurfacing
CITY OF PIQUA - STREET RESURFACING PROJECT. MIA-CR 25A-14.87, PID 95643. In general, the Work consists of the planing of asphalt, adjustment of manholes and water valves, catch basin repairs/replacements, placement of an asphalt surface course and pavement markings, and the installation of ADA compliant handicap ramps at all of the intersections within the paving limits.
04/22/2014 02:00 PM UTC
13-12 FISHER, ELLERMAN, GRANT, & DOWNING
CITY OF PIQUA - FISHER, ELLERMAN, GRANT, & DOWNING WATER DISTRIBUTION IMPROVEMENTS. In general, the Work consists of the installation of approximately 1400 LF of 8” ductile iron pipe, misc. appurtances, and 22 1” water services.
08/26/2013 02:00 PM UTC
61 - 70 of 73 Solicitations
1 2 3 4 5 7