General Info

Business Logo

City of Delaware, Ohio

1 S. Sandusky St., Delaware, OH 43015
(740) 203-1811

Please see Notice to Bidders for each solicitation to find contact information specific to a project.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
03-19 Split Body Curb Side Recycling Vehicle
Split Body Curb Side Recycling Vehicle (20 Yard)
02/08/2019 03:00 PM UTC
08-18 DEL-23-6.45 US 23 and Glenn Parkway Signal Project
Install a Signal at the Intersection of US 23 and Glenn Parkway.
10/26/2018 03:00 PM UTC
09-18
Chemicals for the Water and Waste Water Treatment Plants
10/25/2018 03:00 PM UTC
04-18 DEL-US23-11.43 to 12.68 Micro-surfacing US 23 (Rebid)
This project consists of pavement repairs and micro-surfacing a total of 1.25 miles of US23 within the City of Delaware from SLM 11.43 to 12.68 All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at https://odot.formstack.com/forms/dbe.
07/03/2018 03:00 PM UTC
Side Load Refuse Vehicle
Side Load Refuse Vehicle (20 Yard)
06/26/2018 02:00 PM UTC
03-18 2018 Pavement Maintenance Program
The 2018 local resurfacing program will consist of reconstruction of Cambridge Road beginning at Lexington Boulevard to 140' north of Bridgeport Way. The alternate bid will consist of a fiber cape seal being applied to Blymer Street. - City of Delaware
06/22/2018 03:00 PM UTC
06-18 2018 Pavement Maintenance Program (OPWC)
The 2018 OPWC resurfacing program will consist of the resurfacing of Winter Street from Franklin Street to Central Avenue, resurfacing of Heffner Street from Euclid Avenue to Sandusky Street and Bridge Maintenance on the Winter Street Bridge over the Olentangy River. - City of Delaware
06/22/2018 02:00 PM UTC
04-18 DEL-US23-11.43 to 12.68 Micro-surfacing US 23
This project consists of pavement repairs and micro-surfacing a total of 1.25 miles of US23 within the City of Delaware from SLM 11.43 to 12.68
05/31/2018 03:00 PM UTC
07-18
Rear Loading Refuse Collection Truck Body Estimated Cost $65,000
05/21/2018 02:00 PM UTC
05-18
Asphalt, Concrete and Stone Materials Contract
05/04/2018 03:00 PM UTC
101 - 110 of 127 Solicitations
1 2 5 6 7 8 9 11 13