General Info

Business Logo

City of Delaware, Ohio

1 S. Sandusky St., Delaware, OH 43015
(740) 203-1811

Please see Notice to Bidders for each solicitation to find contact information specific to a project.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
05-21
Side Load Refuse Truck - REBID
02/12/2021 04:00 PM UTC
17-20
Side Load Refuse Truck
01/15/2021 04:00 PM UTC
16-20 Sanitary Sewer Improvements, Grouting & CIPP Lining
Sanitary sewer improvements for West William St and Hayes Colony area. The scope of work includes the lining of existing sanitary sewer main with Cure in place pipe (CIPP) and mainline joint grouting. Sewer pipe preparation including light cleaning, cementitious grouting, trimming of protruding service laterals, and such other preparatory work as specified within the supplemental speciation of the contract. Also, lateral reinstatement, manhole rehabilitation, sewer videotaping and inspection, bypass pumping; and such other work as necessary to meet all contract requirements. The project has an expected duration of about 60 days
12/22/2020 04:00 PM UTC
14-20 Stratford Road Bridge Repair
The Project consists of the repair of the forward abutment on the Stratford Road Pedestrian Bridge over the Olentangy River. New slab and backwall for the forward abutment. Minimal approach work and epoxy injection on the existing concrete deck.
11/17/2020 04:00 PM UTC
17-20 Chemicals for the Water and Wastewater Treatment Plants
The purchase of Chemicals for the Water and Wastewater Treatment Plants. All chemicals delivered Free on Board (F.O.B.) and unloaded at the Delaware Water Treatment Facility (3080 U.S. Route 23 North) or the Upper Olentangy Water Reclamation Center (225 Cherry St. Delaware, Ohio 43015).
11/10/2020 04:00 PM UTC
13-20 Riverby Estates Sanitary Sewer Extension
Extension of City of Delaware gravity sanitary sewer approximately 1,000 l.f. along Pollock Road from an existing sanitary manhole to an existing sewer manhole on Riverby Lane, to intercept the existing collection system of the Riverby Estates subdivision's private sewer collection system.
10/29/2020 03:00 PM UTC
(15-20) Second Ward Community Initiative Community Center Roof Project
The base bid for the Second Ward Community Initiative Community Center Roof Project will consist of metal roof replacement, gutter and downspout replacement, batt insulation removal, and metal roof re-coating. The Project will be substantially complete within sixty (60) days.
10/23/2020 03:00 PM UTC
12-20 2021 City of Delaware Custodial Services
The City of Delaware will be receiving bids until September 16, 2020 at 11:00 a.m. local time, for the 2021 City of Delaware Custodial Services Contract. Bids are to be submitted only at www.bidexpress.com. Hard copies will not be accepted. This project consists of cleaning public facilities at four locations within the City from January 1, 2021 –December 31, 2021. The agreement may be extended for a total of two (2) additional one (1) year periods following the first year, upon written agreement of both the City and Vendor. A non-mandatory pre-bid conference for the Project will be held on Wednesday, September 9, 2020 at 10:00 a.m. through the Webex online platform. For convenience, registered plan holders will receive an email invitation to the meeting which will include the Webex teleconference information. If you do not have an account with Bid Express and you would like to review projects, information or submit a bid, you will need to sign up for an account. Go to www.bidexpress.com in order to sign up.
09/16/2020 03:00 PM UTC
11-20 City of Delaware Trail Project
The City of Delaware is receiving bids until August 28, 2020, at 9:00 a.m. local time, for the neighborhood park gravel trail contract. Bids are to be submitted only at www.bidexpress.com. Hard copies will not be accepted. A pre-bid meeting will not be held. Bids will be opened at 440 East William Street, Delaware, Ohio 43015 in the Public Works & Parks Conference Room If you do not have an account with Bid Express and you would like to review projects, information or submit a bid, you will need to sign up for an account. Go to www.bidexpress.com in order to sign up.
08/28/2020 01:00 PM UTC
10-20 Locust Curve Multi-Use Path, Phase 1
Construction of Phase 1 of a new multi-use path along the north side of SR 37 (W. Central Ave.) between Houk Rd. and Lexington Blvd. Project length is approximately 0.48 miles. The Contract Times will be 60 days to Substantial Completion as indicated in the Agreement.
07/09/2020 02:00 PM UTC
71 - 80 of 127 Solicitations
1 2 3 4 5 6 8 10 11 12 13