General Info

Business Logo

City of Delaware, Ohio

1 S. Sandusky St., Delaware, OH 43015
(740) 203-1811

Please see Notice to Bidders for each solicitation to find contact information specific to a project.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
21-21 Point Project Fiber Optic Cable Conduit
Fiber optic cable conduit installation along US 36/SR 37 under Norfolk Southern Railroad Bridge. Conduit/duct bank is being placed for future fiber optic cable installation. This contract only installs the conduit, not fiber optic cable. The Owner intends to issue a Notice to Proceed on or before February 21, 2022. The required date for Substantial Completion is April 7, 2022.
01/13/2022 04:00 PM UTC
RFQ for 2022-2024 Engineering & Surveying Services
Request for Qualifications for engineering and surveying services during 2022-2024 period. The purpose of the RFQ is to prequalify multiple firms for consideration to provide services for several categories of projects as well as specific planned projects. During the three-year period of 2022-2024, only those firms who are prequalified as part of this process will be considered for providing services, unless the City elects to publish a separate RFQ or RFP for a major project (such as for an ODOT local-let project).
12/22/2021 09:00 PM UTC
14-21 WWTP MAINTENANCE BUILDING ADDITION
The construction of a new maintenance facility that will be approximately 36’ X 40’ in dimensions. The facility will be located and constructed on City property, immediately adjacent and connected to the former pretreatment building (now retrofitted operations building). The project has an expected duration of about 6 months (We will work with the contractor in terms of start and finish dates, the project will however need to be completed by the end of 2022).
11/04/2021 03:00 PM UTC
20-21 Chemicals for the Water and Wastewater Treatment Plants
The purchase of Chemicals for the Water and Wastewater Treatment Plants. All chemicals delivered Free on Board (F.O.B.) and unloaded at the Delaware Water Treatment Facility (3080 U.S. Route 23 North) or the Upper Olentangy Water Reclamation Center (225 Cherry St. Delaware, Ohio 43015).
11/01/2021 03:00 PM UTC
19-21 Bernard Avenue Phase 2 Drainage Improvements
Construction of approximately 1,807 L.F. of Storm sewer (ranging from 42”-12” in diameter) and 334 L.F. of Sanitary sewer (8” diameter). The project starts at an alley right off Sandusky St then crosses Franklin St and Washington St before proceeding to end at the junction of Liberty St and Bernard Avenue.
10/14/2021 03:00 PM UTC
18-21 US 23 Pavement Repairs
The Work for this project consists of 6-inch depth pavement repairs on US 23 within the City of Delaware between Olentangy Avenue and North Sandusky Street. The date for Substantial Completion is November 20, 2021. A Notice to Proceed is expected to be issued on approximately October 25, 2021.
09/30/2021 03:00 PM UTC
15-21 PENNSYLVANIA AVENUE WATER MAIN REPLACEMENT
Replacement of approximately 3,205 L.F. of City of Delaware water main along Pennsylvania Avenue. The water main will be 8” and will start at Euclid Avenue and end at North Sandusky street.
09/30/2021 03:00 PM UTC
17-21 2021 Sidewalk Maintenance Program
The Base Bid project includes the removal and replacement of existing concrete sidewalks, curb ramps, and curbs at various locations on E. Heffner St., N. Union St., Cottswold Dr., and Somerset Rd. The Base Bid contract time will be 45 days to Substantial Completion. An Add Alternate includes on-call sidewalk and curb repair services for the remainder of calendar year 2021.
09/28/2021 03:00 PM UTC
12-21 WESLEYAN WOODS SEWER REHABILITAION
Sanitary sewer improvements for Wesleyan Woods Sewer area. The scope of work includes the lining of existing sanitary sewer main with Cure in place pipe (CIPP). Sewer pipe preparation including light cleaning, cementitious grouting, trimming of protruding service laterals, and such other preparatory work as specified within the supplemental speciation of the contract. Also, lateral reinstatement, manhole rehabilitation, sewer videotaping and inspection, bypass pumping; and such other work as necessary to meet all contract requirements. The project has an expected duration of about 60 days.
08/03/2021 03:00 PM UTC
11-21 DEL-US36-7.87, PID 105799 Citywide Signals Upgrade Project - City of Delaware
Signal System Upgrade covering signalized intersections along Sandusky Street from Belle Avenue to Central Avenue (SR-37), William Street (US-36) from US-23 to Lehner Woods Boulevard, Central Avenue (SR-37) from US-23 to Warrensburg Road and London Road within the City of Delaware. All Bidders shall submit a DBE Utilization Plan at the time of bid setting forth specific information demonstrating how the Bidder will achieve the DBE goal. By submitting a DBE Utilization Plan, the Bidder is affirming that they will be using the DBE firms identified in the Utilization Plan to meet the DBE contract goal. The DBE Utilization Plan shall be submitted online at https://odot.formstack.com/forms/dbe_copy . See LPA DBE Process document in the attachment list for more details and instructions.
07/23/2021 03:00 PM UTC
51 - 60 of 127 Solicitations
1 2 3 4 6 8 9 10 11 12 13