City of Sidney
Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142
The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.
Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142
The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
25-11 Tilberry Run Drainage Ditch Improvements
25-11 Tilberry Run Drainage Ditch Improvements
The project consists of the regrading of ditch bank, the addition of gabion walls and erosion control measures.
State of Ohio Prevailing Wage Rates apply.
Estimate: $267,339
| 05/01/2025 06:30 PM UTC |
Number | Deadline |
---|---|
25-08 Buckeye Avenue Sanitary Sewer Replacement
25-08 Buckeye Avenue Sanitary Sewer Replacement
The project includes replacement of gravity sanitary sewer along Buckeye Avenue.
State of Ohio Prevailing Wage Rates apply.
Estimate: $271,975
| 02/06/2025 04:30 PM UTC |
25-04 Stewart Subdivision Water & Sewer Replacement
25-04 Stewart Subdivision Water & Sewer Replacement
The project consists of the reconstruction of Cheryl Ave., Stewart Dr., & Daniel Pl. including replacement of storm sewer, sanitary sewer waterline, sidewalk, and curb ramps from Vandemark Rd. to Vandemark Rd. Sanitary sewer will also be replaced along Vandemark Rd. from Campbell Rd. to Cheryl Ave.
State of Ohio Prevailing Wage Rates apply.
Estimate: $2,114,226
| 01/30/2025 04:30 PM UTC |
25-02 Fire Station 2 Construction
25-02 Fire Station 2 Construction
The project consists of general, fire protection, plumbing, HVAC, electrical ,and technology work for construction of new fire station and related site work.
A Mandatory Pre-Bid Meeting will be held at 8:30 a.m. on Friday, December 20, 2024 in the Council Chambers located on the second floor of the Municipal Building, 201 W. Poplar Street, Sidney, Ohio.
State of Ohio Prevailing Wage Rates for Building Construction apply.
Estimate: $5,700,000
| 01/29/2025 07:30 PM UTC |
24-14 Pike Street Sanitary Sewer Replacement
24-14 Pike Street Sanitary Sewer Replacement
The project consists of the replacement of approximately 745 l.f. of 8” sanitary sewer along Pike Street between St. Marys Avenue and N. Ohio Avenue including replacement of active sanitary laterals from sanitary sewer main to right-of-way line within the project limits.
State of Ohio prevailing wage rates apply.
Engineer's Estimate: $341,631
| 10/03/2024 03:30 PM UTC |
24-13 McKinley / Spruce Alley Storm Sewer Improvements
24-13 McKinley / Spruce Alley Storm Sewer Improvements
The project consists of the replacement of existing 8” clay sanitary sewer with 8” SDR-35 sanitary sewer including sanitary laterals and replacement of existing 18” clay storm sewer with new 18” reinforced concrete storm pipe including storm manholes and catch basin along the alley connecting McKinley Avenue to Spruce Street and resurfacing the alley from McKinley Avenue to Spruce Street.
State of Ohio Prevailing Wage Rates apply.
Estimate: $193,960
| 08/01/2024 06:30 PM UTC |
24-12 Mulberry Place Improvements
24-12 Mulberry Place Improvements
The project consists of the reconstruction of Mulberry Place between Chestnut Avenue & S. Walnut Avenue including new pavement, curb & gutter, water main, storm sewer, sanitary main and services/laterals in addition to the extension of storm sewer through the alley south of Mulberry Place to Cherry Street including reconstruction of the alley.
State of Ohio Prevailing Wage Rates apply.
Estimate: $544,269
| 08/01/2024 03:30 PM UTC |
24-11 Linden Ave Water Main Replacement
24-11 Linden Avenue Water Main Replacement
(Michigan Street to Park Street) OPWC #CM01AB
The project consists of replacing the existing water main on Linden Avenue & Forest Street between Michigan Street & Park Street with an 8” PVC water main, tying in at both ends of the street. The existing water services will be extended or reconnected to the new main.
Engineer's Estimate: $553,020
Addendum # 1 Engineer's Estimate $564,820
| 06/27/2024 03:30 PM UTC |
24-10 Robert O. New Park Improvements
24-10 Robert O. New Park Improvements
The project consists of a new 6' walking path along the outer edge of the Robert O. New Park.
Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price.
A Disadvantaged Business Enterprise (DBE) participation goal has not been established for this project; however, DBEs are encouraged to review the project and consider submitting a bid.
Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only.
Engineer's Estimate: $109,463
| 06/06/2024 03:30 PM UTC |
24-08
24-08 WWTP Raw Water Pump #4 Replacement
The project consists of the replacement of existing raw water pump #4 with a new water pump per specifications contained within the online Bidding Documents.
A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Friday, April 5, 2024.
The project requires the use of State of Ohio prevailing wage rates.
Estimate of Probable Cost: $70,000
| 04/11/2024 07:00 PM UTC |
24-07
24-07 WWTP Screen Building Make-Up Air Unit Replacements
The project consists of the replacement of existing Reznor Make-Up Air (MUA) Units 2 & 3 with new 460 volt gas-fired MUA units to include: disconnecting & removing the existing units and furnishing & installing new units.
A pre-bid meeting is NOT scheduled. Site visits may be coordinated by contacting WWTP Superintendent, Barry Zerkle at 937.498.8721 or BZerkle@SidneyOH.com prior to 1:00 p.m. on Friday, April 5, 2024.
The project requires the use of State of Ohio prevailing wage rates.
Estimate of Probable Cost: $86,250
| 04/11/2024 06:30 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.