City of Sidney
Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142
The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.
Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142
The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
25-11 Tilberry Run Drainage Ditch Improvements
25-11 Tilberry Run Drainage Ditch Improvements
The project consists of the regrading of ditch bank, the addition of gabion walls and erosion control measures.
State of Ohio Prevailing Wage Rates apply.
Estimate: $267,339
| 05/01/2025 06:30 PM UTC |
Number | Deadline |
---|---|
22-01
22-01
2022 CURB & GUTTER REPLACEMENT
The project consists of the removal & replacement of curb & gutter and curb ramps with truncated domes and also includes the reconnection of drain tiles and site restoration.
Construction Estimate: $475,637
| 02/03/2022 04:30 PM UTC |
21-16
21-16
Linden/Forest Storm Sewer Improvements
The project includes the replacement of storm sewer outlet at the east end of Forest Street from the last existing storm manhole to where the storm sewer outlets within the CSX Railroad right-of-way.
Construction Estimate is $47,434
| 12/16/2021 09:00 PM UTC |
21-15
21-15
SHE-SR 47-13.97
SR 47 SAFETY IMPROVEMENTS IV (4TH TO I-75)
PID 112179
DBE GOAL 6%:
The 0.58 mile long project on SR 47 (Michigan St.) from the SB Interstate 75 ramp east to Fourth Ave. will consist of the following improvements: enhanced crosswalk visibility and signing; addition of countdown pedestrian signals; continuation of a 10 foot wide shared use path from Fourth Ave. to the SB Interstate ramp; removal of 3 drives on the south side of SR 47 near Fifth Avenue; construction of a concrete median at Fifth Ave. to prevent left turns exiting Fifth Avenue; reconstruction of a commercial drive approach on the south side of the Sixth Ave. intersection and installation of a mast arm traffic signal with backing plates at the same intersection; widen the south side of SR 47 at Sixth Ave and add a U-turn lane for WB traffic to return east; Removal and replacement of existing guardrail from Fifth Ave. to Fourth Ave. with concrete median; reconstruct pavement on south lanes of SR 47 at Fourth Ave. and install a concrete left turn lane; mill and resurface SR 47 along the entire length of the project and upgrade signs and pavement markings.
Construction Estimate with Base Bid and either Alternate 1 or Alternate 2 is $2,320,999.
| 12/16/2021 04:30 PM UTC |
21-14
21-14
Fourth Avenue Sanitary Sewer & Storm Improvements
The project includes the replacement of 430’ of 8” sanitary sewer and 2 manholes within Fourth Avenue. Installation of 135’ of 48” x 76” elliptical pipe and junction structure along with associated pipe removals, earthwork, concrete and asphalt repairs, and maintenance of traffic is also included.
Construction Estimate is $250,981
| 12/07/2021 04:30 PM UTC |
21-01CDD
OHIO BUILDING SIDEWALK REPAIR & BASEMENT INFILL
A non-mandatory Pre-Bid Meeting will be held at 10:00 a.m. on Monday, October 4, 2021 onsite at the Ohio Building, 113 N. Ohio Avenue, Sidney, Ohio.
The project includes the removal and replacement of sidewalk, construction of CMU wall, and backfill of basement area.
Estimate of Probable Cost $91,700
| 10/07/2021 03:30 PM UTC |
21-13
21-13 Campbell Road Water Main Replacement
OPWC# CM04Y
The project consists of the replacement of existing 10" water main, service branch connections, fire hydrants, and associated road repairs on Campbell Road from Hall Avenue west to Fourth Avenue.
Construction Estimate: $380,630
| 08/19/2021 03:30 PM UTC |
21-12
21-12 Airport Runway Drainage Repairs
The project includes removal & replacement of existing asphalt & aggregate base, removal & replacement of failed pipes & structures, site restoration including seeding and airfield pavement markings.
Engineer's Estimate: $117,025
| 08/05/2021 03:30 PM UTC |
21-11
21-11 Tawawa Park Shelter House Parking Lot & Access Road
The project consists of excavation, storm sewer installation, dry well installation, paving, pavement markings, and seeding & mulching for a new parking lot and an access roadway within Tawawa Park.
Engineer's Estimate is $48,822
| 07/29/2021 03:30 PM UTC |
Q21-10
REQUEST FOR QUOTES Q21-10
CAMPBELL ROAD SCHOOL PEDESTRIAN CROSSWALK
The project includes construction of a Remote Rapid Flashing Beacon (RRFB) pedestrian crossing including pavement markings and handicap accessible ramps
Construction Estimate: $19,302.50
Completion Date: July 23, 2021
| 04/08/2021 07:00 PM UTC |
21-08
21-08
SHE-SR 47-15.36
COURT & WEST TRAFFIC SIGNAL PID 113753
DBE GOAL 6%:
The project includes the installation of a new mast arm traffic signal at the Court Street & West Avenue intersection including pavement markings and curb ramp replacement.
| 04/08/2021 03:30 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.