General Info

Business Logo

City of Sidney

Engineering Department 201 W. Poplar Street, Sidney, OH 45365
(937) 498-8142

The City of Sidney is a full-service community located along the Great Miami River in Shelby County, Ohio.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-11 Tilberry Run Drainage Ditch Improvements
25-11 Tilberry Run Drainage Ditch Improvements The project consists of the regrading of ditch bank, the addition of gabion walls and erosion control measures. State of Ohio Prevailing Wage Rates apply. Estimate: $267,339
05/01/2025 06:30 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
23-10 Airport Construct Parallel Taxiway
23-10 Airport Construct Parallel Taxiway **ADDENDUM #1 ISSUED 6-20-23** **ADDENDUM #2 ISSUED 6-27-23** The project includes excavation, precast drainage structures, placement of aggregate and asphalt, pavement markings, and airfield lighting. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Labor Standards Provisions and Davis-Bacon Act. The Contractor is required to comply with all wage and labor provisions and to pay minimum wages in accordance with the prevailing wage determination established by the US Department of Labor. DBE Goal 4% Engineer's Estimate: $3,828,280
06/29/2023 03:00 PM UTC
23-09 Mason Road Lift Station Repairs
23-09 Mason Road Lift Station Repairs The project includes the furnishing of all labor, materials, transportation, tools, supplies, equipment, appurtenances, mobilization/demobilization, and bonding necessary to repair the Mason Road lift station per project specifications. A pre-bid meeting is NOT scheduled. Site visits are recommended and may be coordinated by contacting Utilities Director, William Blakely at 937.498.8152 or WBlakely@SidneyOH.com prior to 2:00 p.m. on Thursday, June 8, 2023. Work is to be performed during a major industrial plant shutdown and is under a strict timeframe. The work will need to begin on Thursday, July 6, 2023 with completion by Friday, July 7, 2023. An extension may be permitted into Saturday, July 8, 2023 if necessary but under no circumstances can the project extend beyond 12:00 noon on Sunday, July 9, 2023. State of Ohio prevailing wages are required. Estimate: $62,000
06/14/2023 03:30 PM UTC
23-08 Alpine Court Reconstruction
23-08 Alpine Court Reconstruction The project consists of the reconstruction of roadway on Alpine Court between the existing curb including pavement & pavement markings. The existing curbs are to remain in place. Engineer's Estimate: $285,370
05/11/2023 07:00 PM UTC
23-07 Pt. Jefferson Road Storm Outlet
23-07 Pt. Jefferson Road Storm Outlet The project consists of erosion repairs of storm water outfall. Engineer's Estimate: $227,390
05/11/2023 03:30 PM UTC
23-06
23-06 Sidney City Airport Apron B, D, & F Rehabilitation The project includes asphalt milling, placement of sand slurry seal and asphalt and pavement markings. Engineer's Estimate: $295,100 ADDENDUM NO. 1 Engineer's Estimate $329,075
05/01/2023 03:30 PM UTC
CDD23-01
Former Wagner Manufacturing Site Building Demolition, Asbestos Abatement, and Site Clearing ADDENDUM #1 ISSUED MARCH 17, 2023 ADDENDUM #2 ISSUED MARCH 23, 2023 ADDENDUM #3 ISSUED MARCH 24, 2023 ADDENDUM #4 ISSUED APRIL 6, 2023 ****An additional site visit will be held March 31, 2023 at 10:00 a.m. EST. This additional site visit is optional and is only for those who attended the mandatory Pre-Bid meeting on March 22, 2023. Those wishing to participate should meet at the site.***** A MANDATORY PRE-BID CONFERENCE will be held for prospective bidders on March 22, 2023, at 10:00 a.m. (EST) at Council Chambers, City Hall, 201 West Poplar Street, Sidney, Ohio 45365. The project includes the furnishing of all material; equipment; and labor necessary in the demolition, removal, including asbestos-containing materials (ACM) abatement, and disposal of the existing building on the former Wagner Manufacturing site. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price. A Disadvantaged Business Enterprise (DBE) participation goal has not been established for this project; however, DBEs are encouraged to review the project and consider submitting a bid. Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only. Engineer's Estimate: $3,440,525
04/12/2023 07:00 PM UTC
23-05
23-05 2023 Sidewalk Program The project will consist of the removal and replacement of 4" and 6" concrete sidewalk and drive approaches, replacement of curb, and seeding & mulching. Construction Estimate: $144,960
03/16/2023 03:30 PM UTC
23-04
Echo Drive Extension The project includes the construction for the extension of Echo Drive to connect with Folkerth Avenue including sanitary sewer & storm sewer. Attention of Bidders is called to all of the requirements contained in the electronic Bid documents, particularly to the Federal Requirements, Federal Labor Standards Provisions and Davis-Bacon Wages, various insurance requirements, various equal opportunity provisions, and requirement for a payment bond and performance bond for 100% of the Contract price. A Disadvantaged Business Enterprise (DBE) participation goal has not been established for this project; however, DBEs are encouraged to review the project and consider submitting a bid. Current Federal regulation (23 CFR 635.410) requires all Bidders for Federal or Federal-Aid contracts to submit Bids based upon using only domestic steel and iron products only. Engineer's Estimate: $458,104
02/23/2023 04:30 PM UTC
23-03
23-03 2023 STREET RESURFACING The project includes planning of asphalt, placement of asphalt surface course, asphalt concrete surface course, thermoplastic paint markings, and traffic loop. Construction Estimate: $862,982.60
02/16/2023 04:30 PM UTC
23-01
23-01 2023 CURB & GUTTER REPLACEMENT The project consists of the removal & replacement of curb & gutter and curb ramps with truncated domes and also includes the reconnection of drain tiles and site restoration. Construction Estimate: $372,653
02/02/2023 04:30 PM UTC
41 - 50 of 90 Solicitations
1 2 3 5 7 8 9