General Info

Business Logo

Summit County, Ohio

538 East South Street, Akron, OH 44311
(330) 643-8559

Our mission is to serve the Summit County Community by maintaining and improving our region’s infrastructure, encouraging economic development, and ensuring a safe and efficient transportation system while protecting the environment.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
PID 113175
Ravenna Road Resurfacing Part 2, CH 12 - PID 113175 Roadway Minor Rehab - Existing roadway to be milled, widened, and overlaid form approximately 120 feet north of the intersection with Old Mill Road to the Portage County Line, approximately 380 feet southeast of Middleton Road. Substandard shoulders will be widened and improved where possible within Twinsburg Township limits. The existing cross slope will be maintained. Project limits is 1.37 miles. DBE GOAL 7%: Completion Date; August 15, 2025 Engineer's Estimate: $1,179,314.74
01/03/2025 07:00 PM UTC
PID 112788
SUM-CR 17 Cleveland Massillon Rd. Sidewalk Construction of a 5 foot wide concrete walkway on the west side of Cleveland Massillon Road from the north side of SR 18 (Medina Road) to the north side of Springside Drive. The length of the improvement is 2365 feet. Project includes minor grading, drainage improvements, driveway modification and restoration or turf. Completion Date; July 31, 2025 DBE GOAL 5%: Completion Date; July 15, 2025 Engineer's Estimate: $512,832.48
01/14/2025 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
CID 2023105
2023 Summit County Asphalt Rejuvenating Program This work shall consist of furnishing all labor, equipment and material, and in performing all operations necessary for the rejuvenation of and in-depth sealing of asphaltic-concrete surface course by spray application of a cationic rejuvenating agent composed of petroleum oils and resins emulsified with water, complete, in accordance with the specifications and subject to the terms and conditions of the contract. Completion Date: September 1, 2023 Engineer's Estimate: 152,368.20
05/03/2023 06:00 PM UTC
CID 2023109
2023 Summit County Culvert Replacement Program SCOPE OF WORK Sagamore Hills Township Replacement of three existing culverts - 83 Sandy Hill – 24” Conduit, 8581 Wood Hollow – 30” Conduit, and 8691 Wood Hollow – 24” Conduit. Work will include the removal and replacement of the existing culverts and catch basins, curb work and lawn restoration. Summit County Eastern Rd. 5 X 3 Box Culvert – Remove existing culvert at Lenty Rd. and 24” culvert on Eastern Rd. Install new 5 X 3 box culvert and a 12” HDPE culvert. Work also includes rock channel protection, pavement restoration and other miscellaneous work. Yellow Creek Rd. Culvert – Removal and replacement of as existing 8 X 5 Box culvert with a new 84” RCP culvert and headwall. The project also includes pavement, guardrail, and regrading of the embankment at the ends of the culvert. Completion Date: December 15, 2023 Engineer's Estimate: $359,347.00
04/25/2023 06:00 PM UTC
CID 2023-107
Program: Summit County Regional Pavement Marking Program
04/25/2023 06:00 PM UTC
CID 2023-388
Program: 2023 Crack Sealing The work shall consist of preparing and sealing cracks per ODOT specification Item No. 423 Crack Sealing, Hot Applied, Type IV. Note that all Township roads that have concrete curb and gutter will require the gutter and pavement joint to be sealed.
04/25/2023 06:00 PM UTC
PID 117468
Non-Complex Design/Build for SUM-CR 050-0.88 (South Main St. Bridge Rehabilitation) Design/Build for SUM-CR 050-0.88 (South Main St. Bridge over Nimisila Creek Rehabilitation) The work includes removal of existing superstructure and replacement with a prestressed box beam bridge with composite deck. Additional work includes triple steel tub railing, new approach slabs, guardrail and maintenance of traffic. Completion Date June 30, 2024 DBE GOAL 10%: Engineer's Estimate: $725,500.00
04/24/2023 06:00 PM UTC
PID 113176
Project Name: Swartz Road Resurfacing, PID 113176 DBE GOAL 7%: Description of Job: Existing roadway to be milled, widened and overlaid from intersection with South Main St. to the City of Akron limits, approximately 540 feet east of the intersection with Glenmount Avenue. Substandard Shoulders will be widened and improved. The existing cross slopes will be maintained. Existing roadway curve located 675 feet east of S. Main St. will be realigned to maintain clearance to utility poles. Existing roadway curve located 550 feet west of Glenmont Ave. will be realigned to maintain clearance to existing buildings Completion Date: October 30, 2023 Engineer's Estimate: 952,500.01
04/17/2023 06:00 PM UTC
PID 108141 and 112797
Valley View Rd. Resurfacing Part 1 including Valley View and Olde 8 Rd. Intersection Improvement DBE GOAL 7%: Description of Job: Existing roadway to be milled, widened and overlayed from intersection of State Route 8 to approximately 400 feet west of the intersection with Olde 8 Rd. PID 108141 includes State Route 8 to east edge of pavement of Olde 8 Rd. PID 112797 includes west edge of pavement of Olde 8 Rd. to 400 feet west. Substandard Shoulders will be widened and improved where possible. The existing cross slopes will be maintained Driveway located on the south side of roadway approximately 140 feet west of Intersection with Olde 8 Rd. will be reconstructed to be Right-In, Right-Out only. Existing storm sewer will be upgraded and/or replaced as needed. Project Length is 0.52 Miles Completion Date; November 30, 2023 Engineer's Estimate; 802,386.09
04/17/2023 06:00 PM UTC
CID 2023-115
2023 Summit County Catch Basin Repair Program Reconstruction of inlets as directed by engineer, work will include pavement repair, seeding and mulching and other incidental work to complete the repairs.
04/12/2023 06:00 PM UTC
CID 2023-114
2023 Cleaning, Videotaping and Mapping of Storm Sewers for Summit County Engineer’s Office. Engineer’s Estimate: $249,650.00 Completion Date: 120 days after notice to proceed.
03/29/2023 06:00 PM UTC
CID 2023-100
Project Number: CID 2023-100 Project Name: 2023 Summit County Regional 405 Resurfacing Program Project Location: Various Locations in Summit County Engineer's Estimate: $2,081,397.10 Completion Date: September 1, 2023
03/23/2023 06:00 PM UTC
21 - 30 of 47 Solicitations
1 3 5