Upcoming Solicitations

Number Deadline
PID 113175
Ravenna Road Resurfacing Part 2, CH 12 - PID 113175 Roadway Minor Rehab - Existing roadway to be milled, widened, and overlaid form approximately 120 feet north of the intersection with Old Mill Road to the Portage County Line, approximately 380 feet southeast of Middleton Road. Substandard shoulders will be widened and improved where possible within Twinsburg Township limits. The existing cross slope will be maintained. Project limits is 1.37 miles. DBE GOAL 7%: Completion Date; August 15, 2025 Engineer's Estimate: $1,179,314.74
01/03/2025 07:00 PM UTC
PID 112788
SUM-CR 17 Cleveland Massillon Rd. Sidewalk Construction of a 5 foot wide concrete walkway on the west side of Cleveland Massillon Road from the north side of SR 18 (Medina Road) to the north side of Springside Drive. The length of the improvement is 2365 feet. Project includes minor grading, drainage improvements, driveway modification and restoration or turf. Completion Date; July 31, 2025 DBE GOAL 5%: Completion Date; July 15, 2025 Engineer's Estimate: $512,832.48
01/14/2025 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
CID 2023-104
Project Number: Project Name: 2023 Summit County Regional 422 Resurfacing Program Project Location: Various locations in Summit County Engineer's Estimate: $709,268.00 Completion Date: September 1, 2023
03/23/2023 06:00 PM UTC
CID 2023-416
2023 SCE Guardrail Program Replacing guardrail and/or bridge rail at six bridge locations through out the county. Engineer's estimate: Completion date: July 15, 2023
03/14/2023 06:00 PM UTC
CID 2023-103
Project Number: CID 2023-103 Project Name: 2023 Summit County Regional Concrete Pavement Repair Program Project Location: Bath, Copley, Sagamore, Twinsburg Twps. and Village of Lakemore Engineer's Estimate: $661,350.00 Completion Date: September 30, 2023
03/09/2023 07:00 PM UTC
CID 2023-101
Project Name: 2023 Summit County 441 (449) Resurfacing Program -North Project Location: Various Locations in Norther Summit County Engineer's Estimate: $3,418,713.05 Completion Date: October 15, 2023
03/09/2023 07:00 PM UTC
CID 2023-102
2023 Summit County 441 (449) Resurfacing Program - South Project Location: Various Locations in Summit County Engineer's Estimate: 1,019,450.50 (base bid) Completion Date: September 30, 2023
03/09/2023 07:00 PM UTC
PID 108200
Roadway Minor Rehab – Existing roadway to be widened and overlayed. To Accommodate the proposed widened roadway/shoulders, widening will take place the west side of the roadway. Thereby requiring the crown to be shifted accordingly, a variable depth leveling course will be added to provide a consistent cross slope. Project Length os 0.90 Miles Completion Date; September 30, 2023 Engineer's Estimate: $1,108,207.00
02/09/2023 07:00 PM UTC
PID 113945
SUM-CR 239-01.04 Christman Rd. Bridge over Nimisila Reservoir Replacement of bridge on Christman Road over the Nimisila Reservoir with an entire new structure. Curs/Parapets will be constructed along with a 12-foot-wide future multi-use path (separated by a concrete barrier) on the west side of the bridge. DBE GOAL 10%: Completion Date; September 30, 2023 Engineer's Estimate: $1,352,000.00
01/13/2023 07:00 PM UTC
PID 113152
SUM-CR 137-0.02 Pressler Rd. Bridge over S. Fork of Tuscarawas River Replacement of the two-span concrete slab structure carrying Pressler Road (CR 137) over South Fork Tuscarawas River. The work includes removal of the existing bridge and replacement with a new composite concrete box beam bridge on new foundations. Additional work items include new approach slabs, replacement of roadway approach pavement, rock channel protection, shoulders, and guardrail each side of the bridge, and maintaining traffic DBE GOAL 10%: Completion Date; October 30, 2023 Engineer's Estimate: $944,683.18
12/15/2022 07:00 PM UTC
PID 108453
Akron Cleveland Road Resurfacing (CH 16) Scope of work; Roadway Minor Rehab – Existing roadway to be milled, widened, and overlaid form the City of Cuyahoga Falls north Corporation Limit to the Village of Boston Heights south Corporation Limit. Substandard shoulders will be widened and improved where possible. The existing cross slope will be maintained. Project length is 1.56 miles. DBE GOAL 7%: Completion Date; September 30, 2022 Engineer's Estimate: 1,175,352.45
08/26/2022 06:00 PM UTC
PID 108467 & 108468
DBE GOAL 8%: Cleveland Massillon Rd. Part 1 – The work within the limits of this 1.44 mile resurfacing and shoulder widening improvement project. Work includes planing of existing asphalt concrete wearing course, repair of deteriorated flexible and rigid base, paved shoulder widening (including through the rock-cut section), asphalt overlay and other miscellenous work. Cleveland Massillon Rd. Paart 2 – Existing roadway to be milled and overlayed from 400 feet north of Minor Rd. to the east leg of Ridgewood Rd, omitting the 640-foot portion previously improved at Copley Circle and the Railroad Crossing. Substandard shoulders will be restored and improved where possible. Replacement of existing storm sewers and catch basins along Cleveland-Massillon Rd. and the reconstruction of existing driveways as needed. Project length is 1.81 miles. Completion Date; July 15, 2023 Engineer's Estimate: 2,903,082.29
05/25/2022 06:00 PM UTC
31 - 40 of 47 Solicitations