General Info

Business Logo

Summit County, Ohio

538 East South Street, Akron, OH 44311
(330) 643-8559

Our mission is to serve the Summit County Community by maintaining and improving our region’s infrastructure, encouraging economic development, and ensuring a safe and efficient transportation system while protecting the environment.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
PID 113175
Ravenna Road Resurfacing Part 2, CH 12 - PID 113175 Roadway Minor Rehab - Existing roadway to be milled, widened, and overlaid form approximately 120 feet north of the intersection with Old Mill Road to the Portage County Line, approximately 380 feet southeast of Middleton Road. Substandard shoulders will be widened and improved where possible within Twinsburg Township limits. The existing cross slope will be maintained. Project limits is 1.37 miles. DBE GOAL 7%: Completion Date; August 15, 2025 Engineer's Estimate: $1,179,314.74
01/03/2025 07:00 PM UTC
PID 112788
SUM-CR 17 Cleveland Massillon Rd. Sidewalk Construction of a 5 foot wide concrete walkway on the west side of Cleveland Massillon Road from the north side of SR 18 (Medina Road) to the north side of Springside Drive. The length of the improvement is 2365 feet. Project includes minor grading, drainage improvements, driveway modification and restoration or turf. Completion Date; July 31, 2025 DBE GOAL 5%: Completion Date; July 15, 2025 Engineer's Estimate: $512,832.48
01/14/2025 07:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
PID 108140 R
Ravenna Road Resurfacing Part 1 DBE GOAL 7%: Description of Job: Existing roadway to be milled, widened, and overlayed from approximately 500 feet north of intersection of Ravenna Rd. with Old Mill Rd. to the City of Twinsburg Limits. Substandard shoulders will be widened and improved where possible. The existing cross slope will be maintained. The existing box culvert 3600 feet north of Old Mill Rd. will be replaced. Project Length of 1.15 Miles Completion Date - June 30, 2023. Engineer's estimate - $1,099,696.53
05/25/2022 06:00 PM UTC
PID 108454 R
Olde 8 Road Resurfacing DBE GOAL 7%: Existing roadway to be milled, widened, and overlaid form the Northfield Center Township southern border to the south end of the intersection return at Highland Rd. Substandard shoulders will be widened and improved where possible. The existing cross slope will be maintained. Olde Eight Road will be widened on the north and south approaches to the intersection with Twinsburg Rd. to add a northbound and southbound left-turn lanes. The existing box culvert 470 feet north of Lighthouse Lane will be extended. Project length is 1.19 miles. Completion Date; June 30, 2023 Engineer's Estimate: 1,259,218.95
05/25/2022 06:00 PM UTC
PID 107797
DBE GOAL 7%: Description of Job: Provide a new pedestrian bridge (CUVA FMSS #249738) connector from the Cuyahoga Valley National Park Visitor Center and trail head located on Boston Mills Rd. east of the Riverview Rd. intersection. Proposed pedestrian bridge will span the Cuyahoga River and extend to an existing parking facility that connects to the Ohio & Erie Towpath Trial. Completion Date: October 30, 2022, Engineer's Estimate: $1,222,873.94
04/29/2022 06:00 PM UTC
PID 108454
Olde 8 Road Resurfacing DBE GOAL 7%: Existing roadway to be milled, widened, and overlaid form the Northfield Center Township southern border to the south end of the intersection return at Highland Rd. Substandard shoulders will be widened and improved where possible. The existing cross slope will be maintained. Olde Eight Road will be widened on the north and south approaches to the intersection with Twinsburg Rd. to add a northbound and southbound left-turn lanes. The existing box culvert 470 feet north of Lighthouse Lane will be extended. Project length is 1.19 miles. Completion Date; September 30, 2022 Engineer's Estimate: 1,094,973.00
04/15/2022 06:00 PM UTC
PID 108200 R
White Pond Road Resurfacing DBE GOAL 7%: Description of Job: Existing roadway to be widened and overlaid. To Accommodate the proposed widened roadway/shoulders, widening will take place the west side of the roadway. Thereby requiring the crown to be shifted accordingly, a variable depth leveling course will be added to provide a consistent cross slope. Project Length of 0.90 Miles Completion Date: September 30, 2022, Engineer's Estimate: $1,228,618.30
04/15/2022 06:00 PM UTC
PID 108140
Ravenna Road Resurfacing Part 1 DBE GOAL 7%: Description of Job: Existing roadway to be milled, widened, and overlayed from approximately 500 feet north of intersection of Ravenna Rd. with Old Mill Rd. to the City of Twinsburg Limits. Substandard shoulders will be widened and improved where possible. The existing cross slope will be maintained. The existing box culvert 3600 feet north of Old Mill Rd. will be replaced. Project Length of 1.15 Miles Completion Date - September 30, 2022. Engineer's estimate - $956,257.85
04/15/2022 06:00 PM UTC
PID 108200
DBE GOAL 7%: Description of Job: Existing roadway to be widened and overlaid. To Accommodate the proposed widened roadway/shoulders, widening will take place the west side of the roadway. Thereby requiring the crown to be shifted accordingly, a variable depth leveling course will be added to provide a consistent cross slope. Project Length of 0.90 Miles Completion Date: September 30, 2022 Engineer's Estimate: $1,085,382.90
02/28/2022 07:00 PM UTC
41 - 47 of 47 Solicitations
1 2 3 5 Next →