General Info

Business Logo

Summit County, Ohio

538 East South Street, Akron, OH 44311
(330) 643-8559

Our mission is to serve the Summit County Community by maintaining and improving our region’s infrastructure, encouraging economic development, and ensuring a safe and efficient transportation system while protecting the environment.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
CID 2025-107
The work shall consist of preparation of pavement and furnishing and installing Pavement markings per ODOT Item 642 as directed by the specifications. Completion Date; September 30, 2025 Engineer's Estimate: $307,614.69
05/01/2025 06:00 PM UTC
CID 2025-106
The work shall consist of preparing and sealing cracks per ODOT specification Item No. 423 Crack Sealing, Hot Applied, Type IV. Note that all Township roads that have concrete curb and gutter will require the gutter and pavement joint to be sealed. The engineer also reserves the right to increase/decrease the estimated quantities. Completion Date: September 1, 2025 Estimate: $137,824.09
05/01/2025 06:00 PM UTC
2 Solicitations

Closed Solicitations

Number Deadline
PID 108453
Akron Cleveland Road Resurfacing (CH 16) Scope of work; Roadway Minor Rehab – Existing roadway to be milled, widened, and overlaid form the City of Cuyahoga Falls north Corporation Limit to the Village of Boston Heights south Corporation Limit. Substandard shoulders will be widened and improved where possible. The existing cross slope will be maintained. Project length is 1.56 miles. DBE GOAL 7%: Completion Date; September 30, 2022 Engineer's Estimate: 1,175,352.45
08/26/2022 06:00 PM UTC
PID 108467 & 108468
DBE GOAL 8%: Cleveland Massillon Rd. Part 1 – The work within the limits of this 1.44 mile resurfacing and shoulder widening improvement project. Work includes planing of existing asphalt concrete wearing course, repair of deteriorated flexible and rigid base, paved shoulder widening (including through the rock-cut section), asphalt overlay and other miscellenous work. Cleveland Massillon Rd. Paart 2 – Existing roadway to be milled and overlayed from 400 feet north of Minor Rd. to the east leg of Ridgewood Rd, omitting the 640-foot portion previously improved at Copley Circle and the Railroad Crossing. Substandard shoulders will be restored and improved where possible. Replacement of existing storm sewers and catch basins along Cleveland-Massillon Rd. and the reconstruction of existing driveways as needed. Project length is 1.81 miles. Completion Date; July 15, 2023 Engineer's Estimate: 2,903,082.29
05/25/2022 06:00 PM UTC
PID 108140 R
Ravenna Road Resurfacing Part 1 DBE GOAL 7%: Description of Job: Existing roadway to be milled, widened, and overlayed from approximately 500 feet north of intersection of Ravenna Rd. with Old Mill Rd. to the City of Twinsburg Limits. Substandard shoulders will be widened and improved where possible. The existing cross slope will be maintained. The existing box culvert 3600 feet north of Old Mill Rd. will be replaced. Project Length of 1.15 Miles Completion Date - June 30, 2023. Engineer's estimate - $1,099,696.53
05/25/2022 06:00 PM UTC
PID 108454 R
Olde 8 Road Resurfacing DBE GOAL 7%: Existing roadway to be milled, widened, and overlaid form the Northfield Center Township southern border to the south end of the intersection return at Highland Rd. Substandard shoulders will be widened and improved where possible. The existing cross slope will be maintained. Olde Eight Road will be widened on the north and south approaches to the intersection with Twinsburg Rd. to add a northbound and southbound left-turn lanes. The existing box culvert 470 feet north of Lighthouse Lane will be extended. Project length is 1.19 miles. Completion Date; June 30, 2023 Engineer's Estimate: 1,259,218.95
05/25/2022 06:00 PM UTC
PID 107797
DBE GOAL 7%: Description of Job: Provide a new pedestrian bridge (CUVA FMSS #249738) connector from the Cuyahoga Valley National Park Visitor Center and trail head located on Boston Mills Rd. east of the Riverview Rd. intersection. Proposed pedestrian bridge will span the Cuyahoga River and extend to an existing parking facility that connects to the Ohio & Erie Towpath Trial. Completion Date: October 30, 2022, Engineer's Estimate: $1,222,873.94
04/29/2022 06:00 PM UTC
PID 108454
Olde 8 Road Resurfacing DBE GOAL 7%: Existing roadway to be milled, widened, and overlaid form the Northfield Center Township southern border to the south end of the intersection return at Highland Rd. Substandard shoulders will be widened and improved where possible. The existing cross slope will be maintained. Olde Eight Road will be widened on the north and south approaches to the intersection with Twinsburg Rd. to add a northbound and southbound left-turn lanes. The existing box culvert 470 feet north of Lighthouse Lane will be extended. Project length is 1.19 miles. Completion Date; September 30, 2022 Engineer's Estimate: 1,094,973.00
04/15/2022 06:00 PM UTC
PID 108200 R
White Pond Road Resurfacing DBE GOAL 7%: Description of Job: Existing roadway to be widened and overlaid. To Accommodate the proposed widened roadway/shoulders, widening will take place the west side of the roadway. Thereby requiring the crown to be shifted accordingly, a variable depth leveling course will be added to provide a consistent cross slope. Project Length of 0.90 Miles Completion Date: September 30, 2022, Engineer's Estimate: $1,228,618.30
04/15/2022 06:00 PM UTC
PID 108140
Ravenna Road Resurfacing Part 1 DBE GOAL 7%: Description of Job: Existing roadway to be milled, widened, and overlayed from approximately 500 feet north of intersection of Ravenna Rd. with Old Mill Rd. to the City of Twinsburg Limits. Substandard shoulders will be widened and improved where possible. The existing cross slope will be maintained. The existing box culvert 3600 feet north of Old Mill Rd. will be replaced. Project Length of 1.15 Miles Completion Date - September 30, 2022. Engineer's estimate - $956,257.85
04/15/2022 06:00 PM UTC
PID 108200
DBE GOAL 7%: Description of Job: Existing roadway to be widened and overlaid. To Accommodate the proposed widened roadway/shoulders, widening will take place the west side of the roadway. Thereby requiring the crown to be shifted accordingly, a variable depth leveling course will be added to provide a consistent cross slope. Project Length of 0.90 Miles Completion Date: September 30, 2022 Engineer's Estimate: $1,085,382.90
02/28/2022 07:00 PM UTC
51 - 59 of 59 Solicitations
1 2 3 4 6 Next →