OSU-240604, James Outpatient - 7th Floor Build Out of Leukemia Tissue Bank and Offices
OSU Main Campus: Fit-out of existing shell spaces on 7th floor of the James Outpatient Facility. Scope of work includes a new Leukemia Tissue Bank and Offices.
| 12/17/2025 07:00 PM UTC |
|
OSU-240045, James Care East Refresh
This project will update finishes on the 14th Floor of the OSU East hospital for the James Care East clinic. Updates include ceiling, flooring, and wall finishes. Improvements also include reconfiguration of infusion spaces and ADA upgrades.
| 12/19/2025 07:00 PM UTC |
|
OSU-240113 Domestic Water, Sanitary & Storm Deferred Maint. FY24 REBID
The project consists of the removal and replacement of existing domestic cold water service lines to Arps Hall and 209 Maintenance Building. The scope also includes improvements to the Carmack Ditch immediately north of the Sherman Arts Center. The project includes two alternates which involve the removal and replacement of domestic cold water lines at Electroscience Laboratory and Plumb Hall.
| 12/22/2025 07:00 PM UTC |
|
OSU-250201 - Schottenstein Center - Scoreboard Replacement
This project will replace the video boards in the Schottenstein Center, including the center hung, ribbons and corner boards.
| 01/05/2026 07:00 PM UTC |
|
OSU-240776, Healthy Comm Center - Main Plumbing Line
This project at the Ohio State University Healthy Community Center involves replacing, abandoning, and installing sanitary piping, along with the installation of a new dishwasher requiring electrical conduit and HVAC ductwork to ensure proper air circulation.
| 01/12/2026 07:00 PM UTC |
| Number | Deadline |
|---|---|
|
OSU-190275, Ag Engineering - HVAC Upgrades (Rebid)
Ag Engineering Bldg, OSU Main Campus:
The primary objective of this project is to replace and enhance the HVAC systems serving rooms 145, 156, 158, 164, and 166 at The Ohio State University Agricultural Engineering Building. The spaces are high bay instructional spaces that are currently without cooling. Cooling shall be added as part of this project utilizing the new campus chilled water brought to the building by ENGIE. The HVAC, electrical, plumbing and structural systems detailed within the plans shall be utilized.
| 10/08/2024 06:00 PM UTC |
|
OSU-230103 HVAC Renovations FY23-24
Project will replace existing fiberboard ductwork with galvanized sheet metal ductwork. Ceilings, ceiling devices, walls, lights, etc. to be removed/replaced as necessary for replacing ductwork. Sullivant Hall
| 10/02/2024 05:00 PM UTC |
|
OSU-230830, 650 Ackerman - Employee Health and ID Processing
A (2) Two Phased Renovation of approximately 5,750 SF for
a new Employee Health and ID Processing Center located on
the west end of the First Floor of 650 Ackerman Road
Building. The improvements will include renovations and
expansion to the North Entry Lobby X100L (existing area
761 SF plus the expansion to the west into Suite 116 to add
an additional 260 SF) equating to a new 1,021 SF
Lobby/Waiting Area to accommodate Suite 100, the
remainder of Suite 116 will be utilized as a Staff Lounge
equating to 260 SF, an ADA Restroom of 80 SF and a
Janitor Closet of 28 SF. Suite 100 (area 4,235 SF) which will
accommodate the following services: a Reception Area, (4)
station counter for ID Processing, (5) Patient Exam Rooms,
(2) Patient Toilet Rooms, (2) Testing Areas, Nurse Station,
(5) Support Offices and 2 Storage Rooms (office supplies
and medications).
| 09/25/2024 06:00 PM UTC |
|
OSU-240191 - Younkin - Rm 150 Buckeye Resource Center
This project will renovate an approximately 2,014 sq. ft. space on the first floor of an existing mixed occupancy, 4-story building, and change use from from A-3 to B occupancy
| 09/25/2024 06:00 PM UTC |
|
OSU-230030 Mansfield - Various Campus Upgrades
This project includes roof replacements, roof repairs, building envelope joint sealant replacement, miscellaneous masonry repair and restoration, site work, and site lighting at multiple buildings located at The Ohio State University Mansfield Campus in Mansfield.
See additional information in Section 01 10 00 SUMMARY in the documents.
| 09/19/2024 06:00 PM UTC |
|
OSU-200183 Med Center Traffic Control Devices REBID 4
Improve crosswalks and traffic control devices for pedestrian safety at the OSU Wexner Medical Center and Health Science areas.
| 09/13/2024 06:00 PM UTC |
|
OSU-200183 Med Center Traffic Control Devices REBID
Improve crosswalks and traffic control devices for pedestrian safety at the OSU Wexner Medical Center and Health Science areas.
| 08/06/2024 06:00 PM UTC |
|
OSU-200183 Med Center Traffic Control Devices REBID
Improve crosswalks and traffic control devices for pedestrian safety at the OSU Wexner Medical Center and Health Science areas.
| 07/30/2024 06:00 PM UTC |
|
OSU 240138 Howlett Greenhouses Heating Piping
Replace all heating water and domestic cold water piping in the
Howlett Greenhouse trenches and a portion of the heating water
piping in the basement.
| 07/25/2024 06:00 PM UTC |
|
OSU-230431 1 Evans Hall Chiller Replacement
Removal of existing chiller, providing new automatic propylene glycol feeder, providing 40% propylene glycol solution to fill system, installation of University purchased packaged chiller and transformer, provide concrete equipment pads, louvered fencing, site restoration, 200 gallon buffer tank, extending chilled water piping through roof to new chiller location, providing electric and controls from second floor mechanical room to University purchased chiller and transformer location outside on grade.
| 07/24/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.