General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-250070 - Lazenby Hall - Rm 121 Renovation
Lazenby Hall Suite 121 will be renovated to support incoming faculty department members and their lab personnel. Suite 121 is currently fit out with single occupant research rooms and supporting mechanical, electrical, and technology infrastructure. The intent of this renovation is to remove the small research rooms and create an open environment to support new research teams. This renovation requires hazardous materials abatement, demolition, ADA compliance review, and interior finish upgrades. Mechanical and electrical design will include HVAC, electric, IT coordination, and fire alarm modifications
04/24/2025 06:00 PM UTC
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
04/25/2025 06:00 PM UTC
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
04/28/2025 06:00 PM UTC
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
04/29/2025 06:00 PM UTC
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
04/30/2025 06:00 PM UTC
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
05/01/2025 06:00 PM UTC
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new Sallyport structure
05/01/2025 06:00 PM UTC
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/07/2025 06:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
10 Solicitations

Closed Solicitations

Number Deadline
OSU-230303, Bevis - Vestibular Lab Build Out
The project is the renovation of an existing research lab into a vestibular lab. The area of construction is approximately 1,180 square feet. The work consists of the demolition of a small section of corridor wall, flooring, ceiling, section of the slab on grade, and the associated fire protection, plumbing, mechanical, electrical systems. The new work will consist of creating a Work Area, MOOG Room (for testing equipment), and a walking path. For the MOOG room, it is required to remove a section of the slab on grade and repour a thicker slab on grade to resist the forces of the equipment. The new work will entail new partitions, doors and frames, casework, ceilings, finishes in the new OSUWMC finish standards, and the associated plumbing, mechanical, electrical, and fire protection systems.
10/05/2023 06:00 PM UTC
OSU-220677, Science Village - Room 119
Renovation of 741 square feet of the existing 51,879 square foot 1st Floor of the OSU Science Village Building, including walls, doors, ceilings, finishes, and related MEP items.
10/04/2023 06:00 PM UTC
OSU-221027, Stillman - Corridor and 4th Floor Renovation
Columbus Campus: The scope of work includes a single-phase renovation of the following Areas: Suite 400 2,329 SF, 4th Floor Corridor 1,308 SF, 3rd Floor Corridor 1,348 SF, 2nd Floor Corridor 1,513 SF and Area 425X 265 SF in Suite 425.
09/26/2023 06:00 PM UTC
OSU-220236, Lima- Public Service Building Renovation
OSU Lima: 3,600 sf renovation of the existing Public Service Building and HVAC upgrades.
09/18/2023 06:00 PM UTC
OSU-220221 OSUE West Parking Lot
Construction of a new parking lot to the west of Hughes Street on the western edge of the OSU East Hospital Complex.)
09/13/2023 05:00 PM UTC
OSU-230203, Harding - First Floor Restrooms
A two phased renovation of the existing public restrooms located on the first floor of Ohio State Harding Hospital, 1670 Upham Drive in Columbus, Ohio. The project scope includes Rooms 100T (Women’s 212 SF), 101T (Men’s 174 SF), 115T (Men’s 34 SF), 116T (Women’s 34 SF), 118T (Women’s 122 SF), 119T (Men’s 122 SF), 111T (Unisex 39 SF) and 112T (Unisex 39SF). Restrooms 100T and 101T will need to be ADA Accessible. Alternate G-1 will be an Add Alternate to provide new doors and hardware for Restrooms 100T, 101T, 115T, 116T, 118T, and 119T. Rooms 111T and 112T will be designed and advertised as Add Alternate G-2 and will be equipped with anti-ligature fixtures and accessories. Phases One Restrooms 100T, 101T, and 115T as well as 112T if Alternate G-2 is accepted, Phase Two Restrooms 118T, 119T and 116T as well as 111T if Alternate G-2 is accepted.
08/31/2023 06:00 PM UTC
OSU-190008, Road and Bridge Improvements, FY2019 Bid Package #4
Trash Compactor Storage Area-Hess Road Rehabilitation
08/15/2023 06:00 PM UTC
OSU-210264 Emergency Generators
Replaces existing interior emergency generators at Sisson Hall and Agricultural (Ag) Engineering with exterior generators. Scope of work includes associated Civil, MEP, Fire Protection Systems, and Hazardous Material removal.
08/10/2023 05:00 PM UTC
OSU-220052 Campus Traffic Signal Upgrades
Establish fiber optic communication with OSU owned traffic signal and the City of Columbus CTSS.
08/07/2023 06:00 PM UTC
OSU-220071 Exterior Door Control Upgrades FY 22
This project will upgrade door operators in various buildings on campus.
08/03/2023 07:00 PM UTC
81 - 90 of 551 Solicitations
1 2 5 6 7 9 11 12 13 55 56