The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-250070 - Lazenby Hall - Rm 121 Renovation
Lazenby Hall Suite 121 will be renovated to support incoming faculty
department members and their lab personnel. Suite 121 is currently
fit out with single occupant research rooms and supporting
mechanical, electrical, and technology infrastructure. The intent of
this renovation is to remove the small research rooms and create an
open environment to support new research teams. This renovation
requires hazardous materials abatement, demolition, ADA
compliance review, and interior finish upgrades. Mechanical and
electrical design will include HVAC, electric, IT coordination, and fire
alarm modifications
| 04/24/2025 06:00 PM UTC |
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
| 04/25/2025 06:00 PM UTC |
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 04/28/2025 06:00 PM UTC |
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
| 04/29/2025 06:00 PM UTC |
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
| 04/30/2025 06:00 PM UTC |
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
| 05/01/2025 06:00 PM UTC |
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new
Sallyport structure
| 05/01/2025 06:00 PM UTC |
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/07/2025 06:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-220456 12th Ave Dom Water & Sanitary REBID
Replacement of waterline and sanitary sewer along west 12th Ave
between High Street and College Street. All site work to be
performed between May 20 and August 2, 2024.
| 04/09/2024 05:00 PM UTC |
OSU-230111 Road/Bridge Renewal FY 23-24
The planned scope of work includes rehabilitation three bridges on
The Ohio State University’s Main Campus: Woody Hayes over
Olentangy River Road, Woody Hayes over Olentangy River.
Maintenance level repairs generally include concrete
patching/repairs, concrete walk repairs/replacement, joint and crack
sealing, and deck sealing and repair
| 04/05/2024 06:00 PM UTC |
OSU-240102 - Norton House - Chiller Replacement
The project will replace the chiller in Norton House dormitory.
| 04/01/2024 06:00 PM UTC |
OSU-230832 - Ohio Stadium - Heat Trace to Piping (Phase 1)
This project will repair and add
heat tracing in Ohio Stadium.
| 03/29/2024 06:00 PM UTC |
OSU-180390-4, 12th Avenue Bus Connector
12the Avenue Bus Connector
| 03/22/2024 06:00 PM UTC |
OSU-230304 Converse Hall - Bathroom/Shower Renovation
The renovation of OSU Converse Hall includes a multi-floor restroom renovation including an accessible restroom in the basement, changing room, and partial renovation of an office suite with a kitchenette.
| 03/20/2024 06:00 PM UTC |
OSU-230113 Campus Hardscape Improvements Phase 1 REBID
This project will improve campus hardscapes.
| 03/19/2024 06:00 PM UTC |
OSU-230414 - Smith Lab - Forensic Lab 4097 Renovation
The Ohio State University is seeking a general contractor to execute the renovation and conversion of a classroom space into a forensic anthropology laboratory. The renovation will include the removal/ abatement of ACM materials, the augmentation of the space surfaces to allow for cleaning, installation of requisite fixed and mobile dry and wet equipment. Plumbing scope includes backflow prevention, coring concrete for floor drains, and necessary sanitary and supply distribution piping to the sink. Mechanically, the project will remove the space from building air, and tie the space into the existing DOAS air handler. A capture hood, ductwork to a new roof-mounted exhaust fan, as well as air balancing are also included in the project scope. Controls modifications are included. Electrical modifications to supply the equipment include the addition of a sub-panel, and distribution circuiting in the space. Additionally, electrical work in the penthouse to feed the exhaust fan VFD, and smoke and fire separation at the floor are included.
| 03/14/2024 06:00 PM UTC |
OSU-230246, EEI - 4th Floor Otolaryngology Redesign
Tenant improvements of approximately 1,364sf on the fourth floor of the EEI Building, to accommodate a new Otolaryngology Research suite. The project will create a large staff workroom with conferencing capabilities, an Exam Room for a portable c-arm and conferencing capabilities, and minor upgrades to an Observation Room and Office.
| 03/13/2024 06:00 PM UTC |
OSU-220591, East - Tower 6 Renovation
Renovation of the existing 6th floor of the patient tower: Approximately 10,450 square feet of patient rooms, corridors, nurses’ station and accessory functions. Patient rooms and corridors include primarily refresh, while the center core area will be reconfigured with associated mechanical, plumbing, electrical and life safety items.
| 03/12/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.