OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
| 04/25/2025 06:00 PM UTC |
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 04/28/2025 06:00 PM UTC |
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
| 04/29/2025 06:00 PM UTC |
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
| 04/30/2025 06:00 PM UTC |
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
| 05/01/2025 06:00 PM UTC |
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new
Sallyport structure
| 05/01/2025 06:00 PM UTC |
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/07/2025 06:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-200028, Rhodes - Domestic Water Riser Replacement
This project includes the replacement of the domestic water risers from ground to 5th floors in Rhodes Hall.
| 03/17/2020 06:00 PM UTC |
OSU-180802, Marion - Apshalt Paving
OSU Marion Campus: This project includes 2,223 square yards of full pavement reconstruction, 9,837 square yards of pavement resurfacing, curb and sidewalk replacement, pavement markings, guardrail replacement, and other related work.
| 03/11/2020 06:00 PM UTC |
OSU-190066 - REBID
OSU-190066 - REBID
OSU HVAC Replacements FY 2019 – Phase 2, Rebid
This project will replace boilers, air system distribution or components, building controls, exhaust, and primary heating sources.
Arps Hall: Removal of building chillers and connection to campus chilled water loop.
Drinko Hall: Replacement of existing building chillers, cooling towers, pumps, controls. Modification of AHU controls and outside air arrangement. Addition of DOAS unit and associated ductwork, etc.
Blankenship Hall: Replacement of 5 packaged rooftop units and terminal box DDC controls
Derby Hall: Replacement of terminal box DDC controls
| 03/06/2020 06:00 PM UTC |
OSU-190775, Prior - 3rd Floor Renovation
The project involves designing renovations to the 3rd floor of Prior Hall to create student study areas for the College of Medicine and the Health Sciences Library.
| 03/03/2020 07:00 PM UTC |
OSU-190122 Infrastructure Improvements
This project will make various site improvements across the Columbus campus.
| 02/28/2020 07:30 PM UTC |
OSU-200064, Hagerty - 1st Floor Classrooms and Lecture Hall
Interior renovations in two classrooms and the Lecture Hall in Hagerty, 1st Floor.
| 02/26/2020 07:00 PM UTC |
OSU-190008 Road and Bridge Improvements
Fred Taylor drive and Carmack Court Improvements, OSU Columbus Campus, Franklin County, Ohio
| 02/19/2020 07:30 PM UTC |
OSU-190819, Rhodes - Room M212A MRI (REBID)
RENOVATION OF EXISTING MRI ROOM. PROJECT INCLUDES REPLACING EXISTING MRI EQUIPMENT WITH NEW THROUGH A REMOVABLE ACCESS PANEL IN THE EXISTING EXTERIOR WALL, ROOM FINISH UPGRADES, AND REPAIR / MODIFICATIONS TO THE EXISTING RF SHIELDING TO COORDINATE WITH NEW EQUIPMENT.
| 02/19/2020 07:00 PM UTC |
OSU-160982 Roof Repair and Replacement Ph 2 Bid Package 02
Work includes removal of existing membrane roofing, insulation, and associated roof flashings where units have been removed, located at Mendenhall Lab at The Ohio State University’s Columbus Campus, Columbus Ohio 43210.
| 02/19/2020 06:00 PM UTC |
OSU-191035, Field Hockey Press Box
Demolition and new site work and building construction of Field Hockey Press Box located on the West side of the existing Buckeye Field.
| 02/17/2020 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.