General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
04/25/2025 06:00 PM UTC
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
04/28/2025 06:00 PM UTC
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
04/29/2025 06:00 PM UTC
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
04/30/2025 06:00 PM UTC
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
05/01/2025 06:00 PM UTC
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new Sallyport structure
05/01/2025 06:00 PM UTC
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/07/2025 06:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OSU-180938, Baker Systems - Room 480 Renovation (REBID)
Complete renovation of room 480 of Baker Systems Building on the Columbus Campus of OSU. Work includes demolition of all architectural finishes, partitions and ceilings. Installation of all new partitions, finishes and ceilings per drawings. Demolish existing MEPT systems in Room 480 and provide new systems per drawings.
12/15/2020 07:00 PM UTC
OSU-190783, Morrill Tower - Fire Alarm Replacement
The work consists of the removal and replacement of existing fire alarm systems in Morrill Tower with new, addressable systems, replacement of the resident advisor intercom system, and addition of a building DAS (distributed antenna system). Related work includes the addition of a fire command center on the first floor, hazardous materials abatement related directly to the scope of work in the contract documents other than the resident sleeping rooms, and patching/painting of walls at removed equipment. Provide overall project management and coordination with the abatement contractor efforts in the resident dormitory pods.
12/11/2020 06:00 PM UTC
OSU-190875, Riffe - Room 647 Renovation
The renovation of a 1175 SF of existing labs and mechanical room to accommodate owner provided equipment. Project includes relocation of two sinks and upgrades to architectural finishes and mechanical, electrical and lab gases. Coordination with owner provided equipment and casework required.
12/08/2020 07:00 PM UTC
OSU-200493, Doan - IT Room Life & Safety
Doan Hall, 410 W. 10th Ave: This project will include upgrading the HVAC and lighting systems in the 45’s series IT rooms Doan Hall.
12/01/2020 07:00 PM UTC
OSU-190192, Lincoln Tower Office Renovations
The Project consists of interior renovations to support new offices on the 12th floor of Lincoln Tower on The Ohio State University’s main campus. The renovation consists of new interior partitions, along with new mechanicals, plumbing and electrical equipment throughout the entire floor. The construction timeline will be separated into two phases: 12th Floor Phase 1 – November 28th thru January 8th 12th Floor Phase 2 – May 15th thru August 30th 247 days for entire contract from NTP with a 127 days break between 01/08/2021 and 05/15/2021.
11/17/2020 07:00 PM UTC
OSU-200601, 1224 Kinnear Rd - Generator
OSU Main Campus: The purpose of this project is to install a standby generator and automatic transfer switch to serve the entire building. The existing generator shall be removed. The existing service entrance equipment shall be rebuilt to eliminate the six existing main switches and instead provide a single main disconnect switch.
11/03/2020 07:00 PM UTC
OSU-190141, Sea Grant - Stone Laboratory
OSU Stone Laboratory, South Bass Island: The project will add ~3,500 sq ft of laboratory and support space to the Research Building at Peach Point on South Bass Island.
10/22/2020 06:00 PM UTC
OSU-200307, Family Medicine and Mammography - Pickerington
Renovation approximately 11,000 SF for tenant lease space on the second floor. Space to have two separate entrances for Family Medicine and Mammography. The Family Medicine space will also contain an Optometry clinic.
09/29/2020 06:00 PM UTC
OSU-200218, Celeste - Room 36 Nexus Laser Renovation (REBID)
REBID: The project consists of interior renovations to support a new NEXUS Laser lab. The lab will be located in an expanded footprint of 036 in the lower level of Celeste on The Ohio State University Columbus campus. Relocation of an existing Reactor Lab and demolition of existing mechanical equipment. New mechanical room and renovations to existing mechanical room, and creation of new Reactor Lab space.
09/24/2020 06:00 PM UTC
OSU-190385, Parks-Room 145 Renovation (REBID)
OSU Columbus Campus: (REBID) Interior Renovation – renovate approximately 1,000 square feet of unused laboratory space in Parks Hall, converting it to office space. Existing finishes, casework, and partitions within the space will be demolished. A portion of the demolition work will be abatement of hazardous materials. New partitions and finishes will be constructed. HVAC and electrical work will be primarily limited to demolition and construction within the space. Technology work will be primarily in the space, with a primary connection to the Data room 130M on the same floor.
09/02/2020 06:00 PM UTC
241 - 250 of 552 Solicitations
1 2 21 22 23 25 27 28 29 55 56