The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-240400, Havener - Dublin Office Renovation
Project includes architectural finishes, minor changes to power, data and lighting, minor updates to plumbing, review for ADA and Building Code Compliance and a Permit set of drawings. Existing light fixtures will be replaced with LED lighting for a portion of the building. The project will be submitted for a building permit to the City of Dublin. GAI has been told abatement is not to be included in our services. Fire Alarm includes relocation and addition of smoke detectors.
| 04/25/2025 06:00 PM UTC |
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 04/28/2025 06:00 PM UTC |
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
| 04/29/2025 06:00 PM UTC |
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
| 04/30/2025 06:00 PM UTC |
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
| 05/01/2025 06:00 PM UTC |
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new
Sallyport structure
| 05/01/2025 06:00 PM UTC |
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/07/2025 06:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-200101 West Campus Infrastructure Phase 1 BID PACKAGE 2
This project will provide infrastructure to support building projects in the west campus area, including WMC West Campus Ambulatory Facilities, Energy Advancement and Innovation Center, and the Interdisciplinary Research Facility. Improvements include additional vehicular lanes, modified/new intersection signalization, surface parking lots, and internal access roads. Utility work includes sanitary sewer, stormwater and water service extension.
| 03/26/2021 03:00 PM UTC |
OSU-190877, Parks - Room 345 Renovation
OSU Main Campus: The project includes the renovation of Suite 335 and 345 in Parks Hall for the College of Pharmacy, approximately 3,400 square feet. The work includes selective interior demolition, abatement, and infrastructure demolition for the renovation of new research laboratories and support spaces. Scope of work includes new interior partitions, finishes, HVAC infrastructure upgrades, power/data distribution and lighting associated with the renovated spaces, new and modified plumbing associated with the renovated spaces.
| 03/23/2021 06:00 PM UTC |
OSU-210094 Oxley's By The Numbers Plaza Phase 2
This project is the second phase of the plaza renovation.
| 03/11/2021 07:30 PM UTC |
OSU- 190127 Water Meter Back Flow Preventerw Solicitation (24)
This project will install a back flow preventers at the two main City of Columbus domestic water meters.
(1) Intersection of Lane and Olentangy River Road
(2) Intersection of John Herrick Drive and Olentangy River Road
| 03/10/2021 07:30 PM UTC |
OSU-190128 Envelope Modernization
This project will restore plazas and envelopes. McCorkle Aquatic Pavilion, Physical Activity and Education Services
Recreation and Physical Activity Center
| 02/25/2021 07:00 PM UTC |
OSU-190512, Dodd - Window Replacement
Removal and replacement of existing windows and interior sills on the first, second, third, fourth, and fifth floors. Work includes selective demolition and repair of interior partitions, sills, and soffits to accommodate new window systems and sills.
| 02/22/2021 07:00 PM UTC |
OSU-200604, Wooster - Selby Hall Elevator Replacement
OSU Wooster: The work consists of the modernization of the existing hydraulic elevator and machinery, as well as associated electrical and mechanical work, including the addition of a rooftop package unit for conditioning of the 3rd level machine room. Repairs to the hoistway masonry, along with associated flashing and coping repair are included as an alternate. Interior car finish upgrades are also included as an alternate.
| 01/12/2021 07:00 PM UTC |
OSU-170719, Canfield - Loading Dock
Canfield – Loading Dock
The Work includes complete demolition of the existing loading dock service elevator, expansion of exterior loading dock area: to add ramp, widen stair, relocate existing dumpsters, and provide new screen walls to improve exterior aesthetics and wayfinding at Canfield Hall. Minor remodeling alterations of interior spaces include: widening of existing basement door, limited existing corridor finishes, and adding a second door to existing supply room located in the Basement Floor of the Canfield Hall, an existing residence hall at the Ohio State University, Columbus, Ohio.
| 01/06/2021 07:00 PM UTC |
OSU-190126 Water Meter Installation FY2019
This project will install domestic cold water meters. Multiple locations on OSU Main Campus
| 01/05/2021 06:00 PM UTC |
OSU-190221, 2001 Polaris - Roof Replacement P2
Work includes coating of metal roof panels and parapets along with miscellaneous exterior and interior work, located at 2001 Polaris Parkway, Columbus Ohio 43240.
| 12/17/2020 07:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.