The Ohio State University
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
| 04/28/2025 06:00 PM UTC |
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
| 04/29/2025 06:00 PM UTC |
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
| 04/30/2025 06:00 PM UTC |
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
| 05/01/2025 06:00 PM UTC |
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new
Sallyport structure
| 05/01/2025 06:00 PM UTC |
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork.
Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
| 05/07/2025 05:00 PM UTC |
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
| 05/07/2025 06:00 PM UTC |
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof
membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
| 05/13/2025 06:00 PM UTC |
Number | Deadline |
---|---|
OSU-120059 Cannon Drive Relocation - Phase 1
Cannon Drive Relocation - Phase 1
| 07/12/2017 06:30 PM UTC |
OSU-160029 PAES - Sanitary Lift Station
PAES - Sanitary Lift Station
| 07/11/2017 06:00 PM UTC |
OSU-160928, Lima - Reed Hall Roof Replacement
OSU Lima Campus: Project includes a complete tear-off of the roof membrane and insulation, down to metal deck of roof areas indicated and replacement with a new single-ply roof membrane and insulation. Project also includes limited masonry work at through wall flashings, lightning protection and limited fall protection.
| 07/06/2017 06:00 PM UTC |
OSU-160969 Doan Public Elevators 4-7 REBID
This project will replace elevator controls and refurbish the cabs.
| 07/06/2017 06:00 PM UTC |
OSU-140356 Mirror Lake Enhancements
Improvements associated with the Mirror Lake renovations, including planting, hardscape, lake edge adjustments, quick drain installation and historic grotto re-construction.
| 07/05/2017 03:00 PM UTC |
OSU-170419 Rhodes-11W Observation Unit
OSU Rhodes 11W Observation Unit Interior Upgrades to include selective demolition, interior partitions and finishes, cabinetry and doors as well as supporting work on fire protection, plumbing, mechanical and electrical systems.
| 06/29/2017 06:00 PM UTC |
OSU-170011 Fry Hall Optometry Clinic Entrance
This project will renovate the entrance, both inside and out,
of the clinic in Fry Hall. The project includes spaces in the
basement and first floor of the original portion of the
building.
| 06/28/2017 06:00 PM UTC |
OSU-140073 Rhodes/Doan 4th Floor OR Power Distribution
This project will evaluate power distribution in various ORs to identify areas to upgrade.
| 06/22/2017 06:00 PM UTC |
OSU-160969 Doan - Public Elevators 4-7
This project will replace elevator controls and refurbish the cabs.
| 06/13/2017 06:00 PM UTC |
OSU-170391 Transportation Implementation Plan BP4 - Corrections Lot
This project installs new asphalt parking lot, screening fence, plantings, and completes other improvements to the area south of the Biological Sciences Building and north of 12th Avenue.
| 06/07/2017 05:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.