General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
04/28/2025 06:00 PM UTC
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
04/29/2025 06:00 PM UTC
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
04/30/2025 06:00 PM UTC
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
05/01/2025 06:00 PM UTC
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new Sallyport structure
05/01/2025 06:00 PM UTC
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/07/2025 06:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
OSU-160245, Ross - ACC Exam Room Oxygen
OSU Ross Heart Hospital ACC Exam Room Oxygen Unit Interior Upgrades to plumbing med gas oxygen extensions as well as supportive work including: selective demolition, interior partition selective demolition, patch and repair, painting finishes, and electrical system limited outlets.
11/15/2017 06:00 PM UTC
OSU-160915, Wooster - Secrest Welcome Center
OSU Wooster Campus: The Project consists of an interior renovation and re-programming of the existing OARDC Operations and Maintenance Building into the Ohio State University Secrest Arboretum Welcome Center.
11/14/2017 07:00 PM UTC
OSU-160375, Doan - Room W293 Endoscopy Renovation
Renovation of existing Endoscopy Reprocessing Room to include replacement of existing pass throughs and scope cabinets, new equipment and sinks, new casework and finish upgrades. Wall modifications to the existing reprocessing Room and adjacent procedure rooms will be required. Modifications to multiple adjacent rooms adjacent to the Lab will be required to enable the renovation of the main endoscopy lab. The project will be constructed in multiple phases with an emphasis on sequence of events closely coordinated with hospital operation.
11/09/2017 07:00 PM UTC
OSU-150015 Plumbing Repair - RPAC Steam and Hot Water
Plumbing Repairs - RPAC Steam and Hot Water
11/01/2017 07:00 PM UTC
OSU-160911, CFAES Lab and Office Renovations (Rebid)
OSU Main Campus: Work includes renovation to the Agriculture Administration Building and to Howlett Hall. Work within the Agriculture Admin Building can be characterized best as “office” and work within Howlett can be characterized as “lab”.
11/01/2017 06:00 PM UTC
OSU-160980 Plumbing System Replacement
The project consists of the investigation of approximately 88 existing sanitary stacks to determine condition of existing piping. The project includes recording the pipe interiors via video camera, with removal of existing blockages where found. At some locations containing multiple stacks, the stacks will be combined into a single branch to the main in the tunnel. The project includes abatement of hazardous material
10/20/2017 05:00 PM UTC
OSU-160976 Elevator Safety Repairs and Replacements Phase 2
Elevator Modernization and related architectural and MEP scopes of work for a total of 8 elevators in 6 buildings on OSU’s Main Campus: Newton Hall Journalism Building 33 W. 11th Ave. Enarson Hall Arps Hall Drinko Hall
10/17/2017 06:00 PM UTC
OSU-160774 Drackett - Corridor Ceilings (RE-BID)
Installation of lay-in ceiling system and lights.
10/13/2017 06:00 PM UTC
OSU-160936, Mansfield - Conard 2nd Floor Renovation
OSU Mansfield Campus: The work consists of the renovation of approximately 7000 square feet of teaching lab, lab prep, lab storage, research lab and lounge areas in the second floor of Conard Hall.
10/02/2017 05:00 PM UTC
OSU-160929, Lima - Standby Generators
OSU Lima Campus: This project consists of providing new generators, associated automatic transfer switches, and life safety system upgrades for Galvin Hall and the Student Services building. The project will include all plumbing work required for the electrical scope to be completed.
09/28/2017 06:00 PM UTC
421 - 430 of 553 Solicitations
1 2 39 40 41 43 45 46 47 55 56