General Info

Business Logo

The Ohio State University

2009 Millikin Rd Rm 400, Columbus, OH 43210-1243
(614) 292-0893


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OSU-230758 Masonry Wall Repair Brick Veneer
The project includes repairs to the exterior masonry façade at the corners of 3 academic buildings on the campus of The Ohio State University (Smith Laboratory, Bolz Hall, and the Animal Sciences Building). The masonry repairs include the replacement of the through-wall flashing, replacement of steel shelf angles/lintels at isolated distress, brick masonry replacement at isolated distress, installation of through-wall anchors, sawcutting of existing and new brick masonry expansion joints, stone patching at isolated distress, joint sealant abatement and installation, masonry cleaning and the application of a clear water repellent.
04/28/2025 06:00 PM UTC
OSU-250384 - Ohio Stadium - Power to Field
The project scope includes additional electrical panels on both the east side and west side of the playing field. The electrical equipment providing power to these panels will be in a crawl space below the lower seat deck. Power to feed these panels originate in both the east and west main electrical rooms. The scope also includes a concrete equipment pad and enlargement of the existing precast access doors.
04/29/2025 06:00 PM UTC
OSU-250286, Hayes Hall - Rm 330 XMD Studio Renovation
OSU Columbus Campus: Renovation of Room 330 into an XMD studio in the Hayes Hall building. Scope includes Architectural, Plumbing (demo only), MEP, and Structural (Unistrut).
04/30/2025 06:00 PM UTC
OSU-250048, Mason Hall - Classroom Renovation
OSU Main Campus: Reconfiguration of an existing computer lab into two separate rooms; a smaller computer lab and an adjacent classroom.
05/01/2025 06:00 PM UTC
OSU-250203 - Blankenship Hall - Sallyport
This project is an exterior addition to existing building for new Sallyport structure
05/01/2025 06:00 PM UTC
OSU 220522 Mechanical Room Refreshes FY 22 Bid Package 2
Work includes hazardous materials abatement and removal of abandoned piping, equipment, and ductwork. Work also includes installation/replacement of domestic hot water recirculation pumping system, limited electrical modifications, insulation work, and miscellaneous architectural modifications
05/07/2025 05:00 PM UTC
OSU-250008 - Finley Farm Barn Renovation
The renovation of existing steel building used as a horse barn. Project will replace roof and translucent roof panels, new gutters and downspout leaders, removal of rust from structural members, painting of steel members, replacement of steel purlins and girts as identified, alternate including replacement of steels siding, installation and partial replacement of 2x12 wood boards, installation of approximately 30 lineal feet concrete curb, minor work with electrical to permit access to work.
05/07/2025 06:00 PM UTC
OSU-230821, BSH - Roof Replacement
The project includes removal of the existing ballasted EPDM lowslope roofs and replacement with new single-ply KEE roof membrane, and installation of fluid-applied roof coating at existing horizontal limestone surfaces and selected EPDM flashing membrane at the cooling tower parapet walls and flashings. flashings to remain. Alternate 1 includes replacement of existing modified bituminous roofing system at Roof 2-A. Alternate 2 includes replacement of existing modified bituminous roofing system at Roof 13-A. Alternate 3 includes removal and replacement of existing sheet metal roofing system, including Unit Price repairs to wood framing and rigid insulation, and sheet metal copings at steep-sloped roof areas.
05/13/2025 06:00 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
OSU-150010 Fire System Replacement BP2
OSU-150010 Fire System Replacement BP2 - Cockins Hall 4th Fl Renovation The Project consists of providing a new addressable, manual fire alarm system in Math Building and Cockins Hall, abatement of asbestos containing material and the replacement of those materials in the project buildings, and associated architectural patching and finish work, and the demolition of the existing fire alarm systems in the buildings. The project also includes a complete renovation of the 4th floor of Cockins Hall, including a new HVAC system, electrical upgrades, floor plan changes, and structural steel reinforcement for support of a new fire-rated ceiling.
01/09/2018 08:00 PM UTC
OSU-160285 Brain and Spine Hospital - 3rd Floor Renovation
This project will make several improvements on the 3rd floor including replacing door hardware; patch, repair and paint walls; upgrades to the staff lounge; cabinet repairs.
01/04/2018 07:00 PM UTC
OSU-160830 Rhodes - Hybrid IR
Rhodes Hall - This project will combine rooms S268 and S264 and upgrade equipment to create an IR suite to accommodate multi-modality imaging.
12/20/2017 07:00 PM UTC
OSU-160010 Harding Hospital 5th Floor Renovations
Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, wall demolition, new wall construction, mechanical, electrical, and plumbing work to accommodate new walls. Primary MEP systems are existing to remain.
12/19/2017 07:00 PM UTC
OSU-160420, WMC East - West 4th Fl Renovation
Project consists of interior renovation of an existing hospital. Scope of work includes new finishes, minor wall demolition, minor mechanical, electrical, and plumbing work. Primary MEP systems are existing to remain.
12/18/2017 06:00 PM UTC
OSU-170172 Morehouse Pavilion - 3rd Floor Neuro Clinic
This project will renovate space vacated by Sports Medicine on the third floor for the Neuro clinic, relocating from the seventh floor of the tower.
12/12/2017 07:00 PM UTC
OSU-160980 Plumbing System Replacement BP1 - Postle Hall REBID
REBID - The project consists of the investigation of approximately 88 existing sanitary stacks to determine condition of existing piping. The project includes recording the pipe interiors via video camera, with removal of existing blockages where found. At some locations containing multiple stacks, the stacks will be combined into a single branch to the main in the tunnel. Project includes hazardous materials abatement.
12/08/2017 06:00 PM UTC
OSU-160936, Mansfield - Conard 2nd Floor Renovation REBID
OSU Mansfield Campus: The work consists of the partial renovation of approximately 5,100 square feet of teaching and prep labs, including the addition of a new air handling unit serving these spaces and associated plumbing and electrical work
12/07/2017 07:00 PM UTC
OSU-170541, Enarson - 4th Floor Office
Enarson – 4th Floor Office. This project will renovate the office spaces of the 4th floor.
12/06/2017 06:00 PM UTC
OSU-170279, Baker Sys - AHU Replacement
Replacement of Air Handling Unit in Baker Systems Engineering Building.
11/29/2017 07:00 PM UTC
411 - 420 of 553 Solicitations
1 2 38 39 40 42 44 45 46 55 56