General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-55-1
Hwy 1085 @ Francis Rd/Bootlegger Rd Roundabout Repairs---------------------The Parish requests that a Contractor conduct a site visit to assess and provide a quote for repairing all damaged items located on the south side of the roundabout, as specified along Francis Rd (R01C008) located in Covington, Louisiana.
11/05/2025 08:00 PM UTC
25-31-2
Lowe Davis Rd Improvements----------------------------------------Contractor shall provide all labor, equipment, and materials necessary for roadway improvements along Lowe Davis Rd (R03J003), Section 15 & 16, Township 6S, Range 12E.
11/12/2025 08:00 PM UTC
25-56-1
59 Barn Concrete Maintenance-----------------------------------The Parish requests a Contractor to improve the roadway by removing and replacing concrete road panels, as well as removing and replacing curbs and gutters as specified along the following Parish roads: - Cours Carson St, Mandeville, LA; - Debellvue Pl, Mandeville, LA; - Joans St, Mandeville, LA; -Kramer Ct, Mandeville, LA; -Pecan Pass, Mandeville, LA; and - Rosedown Way, Mandeville, LA.
11/13/2025 08:00 PM UTC
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
311-00-13-04-2
District 11 Drainage Improvements - Pearl Street
03/21/2013 07:00 PM UTC
323-00-13-03-2
Federally Qualified Health Center at St Tammany Parish Fairgrounds
03/19/2013 07:00 PM UTC
300-01-13-02-2
Airport Road Connector Phase 2B
03/15/2013 07:00 PM UTC
307-00-13-01-2
Rue Pickney Drainage Improvements
02/21/2013 08:00 PM UTC
300-00-12-47-2
Francis Road @ Bootlegger Roundabout
01/17/2013 08:00 PM UTC
337-00-12-46-2
Justice Center Parking Garage Furniture
01/11/2013 08:00 PM UTC
450-18-12-40-2
Koop Drive Park and Ride Refurbishment
01/10/2013 08:00 PM UTC
015-00-12-45-2
2013 Striping
01/08/2013 08:00 PM UTC
623-00-12-44-2
2013 Sodium Hypochlorite Bulk Delivery
12/21/2012 08:00 PM UTC
502-03-14-42-2
2013 Annual Bid
12/17/2012 08:00 PM UTC
871 - 880 of 914 Solicitations
1 2 84 85 86 88 90 91 92