General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-34-2
Rousseau Rd. Over Soap & Tallow Branch---------------------------- The project consists of the removal of the existing bridge and the phased construction of a new bridge structure along Rousseau Road crossing Soap and Tallow Branch.
12/11/2025 08:00 PM UTC
25-35-2
Dr. TJ Smith Sr Expy Improvements----------------------------------The work specified in this project will require the contractor to provide labor, equipment, and materials necessary to improve the roadway surface along Dr TJ Smith Sr Expressway
12/11/2025 08:00 PM UTC
25-37-2
Woodridge Blvd, English Oaks Dr & Black River Estates------------------------------Work to include a 1” mill and 2” overlay with stop bar striping for Woodridge Blvd (R04C004), a 1” mill and 2” overlay with stop bar striping and pavement patching for English Oaks Dr (R01I058), and speed tables in Black River Estates along Black River Dr (R01J042) and Hawthorne Hollow (R01J041). All work being performed is to improve safety and driving conditions for motorists.
12/11/2025 08:00 PM UTC
25-12-2
Lower Tchefuncte Breakwater Restoration----- The scope of work shall include constructing approximately 800’ coastal rip-rap breakwater along the eastern side of the Tchefuncte River outfall to Lake Pontchartrain.
12/17/2025 08:00 PM UTC
25-38-2
Tammany Trace Bridge #25-------------------------------------The Contractor must provide all labor, equipment, materials, and tools necessary for the removal and replacement of an existing bridge structure, earthwork, and road base. The Contractor shall also perform the relocation of an existing drainage ditch, installation of concrete and asphalt paving, as well as the fabrication and installation of pedestrian handrail, installation of concrete bridge foundations, and installation of a prefabricated steel truss pedestrian bridge, as required, per the construction drawings and specifications.
01/06/2026 08:00 PM UTC
25-39-2
Tammany Trace Bridge #14 ---- The Contractor shall provide all labor, equipment, and materials necessary to complete the removal and replacement of the asphalt path as well as the demolition of an existing timber bridge, concrete approach slabs, and steel guard rails. Additionally, the Contractor shall install a new pedestrian bridge and associated pile-supported concrete abutments, as required, per the construction drawings and specifications. The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of work is two hundred and forty (240) calendar days from the issuance of Notice to Proceed (NTP).
01/08/2026 08:00 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
303-00-12-21-2
District 3 Capital Road Improvements
06/14/2012 07:00 PM UTC
307-00-12-17-2
2012 District 7 Capital Road Improvements
06/13/2012 07:00 PM UTC
307-00-12-17-2
2012 District 7 Capital Road Improvements
06/12/2012 07:00 PM UTC
306-00-12-16-2
2012 District 2 and 6 Capital Road Improvements
06/06/2012 07:00 PM UTC
310-00-12-14-2
District 10 Road Improvements
05/24/2012 07:00 PM UTC
304-00-12-13-2
2012 District 4 Capital Road Improvements
05/23/2012 07:00 PM UTC
415-02-12-15-2
84 Lumber Road Connector & Old Military Road Turning Lane
05/16/2012 07:00 PM UTC
316-00-12-05-2
Meadowlake Subdivision Pond Improvements
05/15/2012 07:00 PM UTC
300-00-12-06-2
Hwy 59 Turn Lane @ 1088
05/03/2012 07:00 PM UTC
301-00-12-07-2
2012 District 1 Road Improvement
05/02/2012 07:00 PM UTC
911 - 920 of 929 Solicitations
1 2 85 86 87 88 89 90 92