General Info

Business Logo

St. Tammany Parish Government

PO Box 628, Covington, LA 70434-0628
(985) 898-2520


Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
25-12-2
Lower Tchefuncte Breakwater Restoration----- The scope of work shall include constructing approximately 800’ coastal rip-rap breakwater along the eastern side of the Tchefuncte River outfall to Lake Pontchartrain.
12/17/2025 08:00 PM UTC
25-38-2
Tammany Trace Bridge #25-------------------------------------The Contractor must provide all labor, equipment, materials, and tools necessary for the removal and replacement of an existing bridge structure, earthwork, and road base. The Contractor shall also perform the relocation of an existing drainage ditch, installation of concrete and asphalt paving, as well as the fabrication and installation of pedestrian handrail, installation of concrete bridge foundations, and installation of a prefabricated steel truss pedestrian bridge, as required, per the construction drawings and specifications.
01/06/2026 08:00 PM UTC
25-39-2
Tammany Trace Bridge #14 ---- The Contractor shall provide all labor, equipment, and materials necessary to complete the removal and replacement of the asphalt path as well as the demolition of an existing timber bridge, concrete approach slabs, and steel guard rails. Additionally, the Contractor shall install a new pedestrian bridge and associated pile-supported concrete abutments, as required, per the construction drawings and specifications. The Parish reserves the right to add, remove, or otherwise modify the above, as determined necessary by the Parish and as allowed by law. The time period for completion of work is two hundred and forty (240) calendar days from the issuance of Notice to Proceed (NTP).
01/08/2026 08:00 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
25-32-2
Oak Park Drainage Improvements - Phase I ------------------------- The work shall consist of drainage improvements within the Oak Park Estates area. The work includes upgrading the existing roadway ditches and driveway culverts along Gale Street, Cheryl Street, Oak Park Road, and Helen Drive to ensure positive stormwater flow. Additionally, the work shall include drainage improvements along Brewster Road from Dominion Subdivision to Lateral 21-IWI-3.
11/20/2025 08:00 PM UTC
25-57-1
Landscaping and Maintenance Service- Justice Center & Tyler Street---------------------------The Provider shall provide all supervision, labor, materials, supplies, and equipment as may be necessary to complete and provide landscape maintenance services for the St. Tammany Parish Justice Center Complex (JC) and the St. Tammany Parish Tyler Street Complex.
11/20/2025 08:00 PM UTC
25-58-1
Forest Dr Drainage------------------------------------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to remove and replace existing structure(s) to restore area drainage by installing drain pipe, catch basins, and sod as specified along Forest Dr (R04D037); located in Mandeville, Louisiana.
11/20/2025 08:00 PM UTC
25-59-1
Lamarque St Drainage----The Parish requests a Contractor to improve drainage by removing and replacing culverts and subsurface drainage pipes along Lamarque St., located in Mandeville, LA, as required in the specifications.
11/19/2025 08:00 PM UTC
25-33-2
Grand Ave-----------------------------------------Contractor shall provide all adequate and competent labor, equipment, and materials necessary to improve the roadway surface by milling and overlaying approximately 1,100 feet of asphaltic concrete. Approximately 650 feet of Grand Ave will be raised to an elevation of 2.5 feet, with the installation of 96 feet of subsurface drainage and roadway striping for this section of roadway, located along Grand Ave (R07H029) Section 45, Township 9S, Range 13E.
11/18/2025 08:00 PM UTC
25-56-1
59 Barn Concrete Maintenance-----------------------------------The Parish requests a Contractor to improve the roadway by removing and replacing concrete road panels, as well as removing and replacing curbs and gutters as specified along the following Parish roads: - Cours Carson St, Mandeville, LA; - Debellvue Pl, Mandeville, LA; - Joans St, Mandeville, LA; -Kramer Ct, Mandeville, LA; -Pecan Pass, Mandeville, LA; and - Rosedown Way, Mandeville, LA.
11/13/2025 08:00 PM UTC
25-31-2
Lowe Davis Rd Improvements----------------------------------------Contractor shall provide all labor, equipment, and materials necessary for roadway improvements along Lowe Davis Rd (R03J003), Section 15 & 16, Township 6S, Range 12E.
11/12/2025 08:00 PM UTC
25-55-1
Hwy 1085 @ Francis Rd/Bootlegger Rd Roundabout Repairs---------------------The Parish requests that a Contractor conduct a site visit to assess and provide a quote for repairing all damaged items located on the south side of the roundabout, as specified along Francis Rd (R01C008) located in Covington, Louisiana.
11/05/2025 08:00 PM UTC
25-54-1
Quail Ride Drainage----------------------------------The Parish requests a Contractor to improve and restore specific areas drainage for the Quail Ridge Drainage project, as specified along Nighthawk Dr (R08N036) Slidell, La ; Lake Vermillion Ct (R08L046) Slidell, La ; Blue Crane No 1 Dr, (R08N040) Slidell, La.
10/23/2025 07:00 PM UTC
25-52-1
Folsom Drainage Maintenance---The Parish requests a Contractor to improve drainage and roadways. Contractor shall install drainage pipes and catch basins, remove and replace cross culverts, and improve turning radii as specified along Kenzie Rd (R02P023); Phillip Rd (R02P013); and Quaglino Rd (R02G013) located in Folsom, Louisiana.
10/22/2025 07:00 PM UTC
11 - 20 of 932 Solicitations
2 4 5 6 7 8 9 93 94