St. Tammany Parish Government
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
PO Box 628, Covington, LA 70434-0628
(985) 898-2520
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
24-63-2
Lacombe Trace Trails & Nature Park--------------------------------------------The project is for the construction of a public outdoor recreation nature park as part of the existing Tammany Trace bike path.
| 01/07/2025 08:00 PM UTC |
24-71-2
Soell Dr, Soell Dr Drainage, Helenbirg Dr, Mire Dr------Work to include asphalt mill and overlay, rebuilding sections of roadway, pavement patching, replacement of culverts, installation of subsurface drainage, box culvert installation, excavation and embankment work, regrading of ditches, signage, striping and the installation of speed tables.
The Parish reserves the right to add, remove or otherwise modify the above, as
determined necessary by the Parish and as allowed by the law.
| 01/07/2025 08:00 PM UTC |
24-69-1
2024 Parishwide Striping------ The Parish requests a contractor to provide and install thermoplastic striping as specified along
the following Parish roads:
• Caroline St (R04E234) Section 38 Township 8S Range 11E, Mandeville;
• Destin St (R04E242) Section 38 Township 8S Range11E, Mandeville;
• Dupard St (R04E143) Section 38 Township 8S Range 11E, Mandeville;
• Evangeline Dr (R09E049) Section 11 Township 9S Range 13E; Slidell;
• Fish Hatchery Rd (R07A001) Section 6 Township 8S Range 13E; Lacombe;
• Labarre St (R04E126) Section 38 Township 8S Range11E, Mandeville;
• McNamara St (R04E344) Section 38 Township 8S Range 11E;
• Meadow Lake Subdivision Section 12 Township 9S Range 14E; Slidell;
• Ninth Ave (R03L047) Section 11 Township 7S Range 11E; Covington;
• Pruden Rd (R03D005) Section 25 Township 6S Range 11E; Covington; and
• Tammany Trace Crosswalks (R11A001) various locations.
| 01/07/2025 08:00 PM UTC |
24-77-2
Chlorinated Tablets 3”------St. Tammany Parish Government (STPG) Department of Utilities (DU) is seeking bids to supply Chlorinated Solid 3” (three-inch) Tablets for our Wastewater Treatment Facilities. DU owns and operates over fifty treatment facilities throughout St. Tammany Parish.
| 01/07/2025 08:00 PM UTC |
24-65-1
Tammany Trace Tunnel & West St. Tammany Utility Beautification----------------St. Tammany Parish is implementing its Tree Bank Program to landscape green space areas for screening and beautification at the following (2) sites: Tammany Trace Tunnel on Hwy 59 and West St. Tammany Utility Site at Hwy 1085.
| 01/16/2025 08:00 PM UTC |
Number | Deadline |
---|---|
24-64-1
St. Tammany Parish Artificial Reefs - Material Hauling -------------------------------------St. Tammany Parish is seeking a Vendor/contractor to provide trucking services for hauling material.
| 12/20/2024 08:00 PM UTC |
24-63-1
Standard Lift Station Cleaning-------------------The Department of Utilities is seeking a provider to provide and furnish all the necessary materials, labor, transportation, and equipment to perform Standard Lift Station Cleaning at Parish owned and operating sites of two hundred – sixty (260) lift stations located throughout St. Tammany Parish. The provider must provide a list of cleaned sites on their invoices.
| 12/19/2024 08:00 PM UTC |
24-75-2
Sodium Bisfulite NaHSO3 (Liquid 40% Solution-Dechlorination)------St. Tammany Parish Government (STPG) Department of Utilities (DU) is seeking a Vendor to supply Sodium Bisfulite NaHSO3 (Liquid 40% Solution Dechlorination) for multiple Wastewater Treatment Facilities located throughout St. Tammany Parish.
The awarded contract is on a unit price “as needed” basis according to the specifications provided. DU reserves the right to order Sodium Bisfulite NaHSO3 (Liquid 40% Solution-Dechlorination) at any time during the year and in any quantity, with no minimum order.
Each facility has been issued a Louisiana Pollutant Discharge Elimination System (LPDES) permit by the Louisiana Department of Environmental Quality (LDEQ). DU is required to monitor and comply in accordance with these permits.
| 12/19/2024 08:00 PM UTC |
24-73-2
St. Tammany Parish Lot 1 Lease----In 2008, the Parish accepted a donation of 3.62-acre parcel (Lot 1 Survey – Section 7) with the donation specifying that the use by the Parish of Lot 1 property shall be for the expansion of recreational and cultural opportunities for the citizens of St. Tammany Parish. This will only allow buildings, and other supporting infrastructure in conjunction with providing recreational and cultural opportunities.
The Parish is soliciting bids for the site development and operation of a recreational amenity located at Lot 1 Koop Drive, Mandeville, Louisiana 70471. The property and grounds are within the Koop Drive PUD and adjacent to the Tammany Trace and Kids Town.
The Parish is seeking to provide an opportunity for qualified bidders to prepare and submit a bid to build, operate, and maintain buildings, grounds, and supporting recreational and cultural infrastructure through a ground lease on the property up to the entire 3.62-acre parcel.
The goal is to ensure the proper operation and maintenance of the building and grounds are used as passive and/or active activities that will further expand recreational and cultural opportunities for the citizens of St. Tammany Parish.
The Prospective Bidder should submit with their bid plans and specifications of the proposed use of the ground lease.
| 12/18/2024 08:00 PM UTC |
24-74-2
St. Tammany Parish Regional Airport Land Lease----St Tammany Parish Government is soliciting bids from bidders interested in leasing parcels of
land that is located at the St Tammany Regional Airport, Covington, LA.
The airport is owned and managed by the Parish. The Parish has visions of the Airport having economic development opportunities and recognizes the need for additional development, to include T-Hanger(s) and other revenue-generating facilities.
The Parish is soliciting bidders who are qualified and experienced operators/developers to provide aviation-related development on three (3) parcels identified in Section 07 as Lease Areas 1,2, and 3.
Bidders must include a business plan laying out their plans for future development proposed on the identified parcels should be included with their bid. Upon approval and execution of the Lease Agreement, the successful bidder will be responsible for all onsite and offsite costs and expenses associated with the development, construction, ownership, management, and operation of the proposed project, including but not limited to planning, design, permit fees, utility charges, and all other expenses that are incurred with development.
| 12/18/2024 08:00 PM UTC |
24-67-2
Mandeville Bypass LA 1088 to US 190----------------------------------------------Work will include construction of a bypass with a bridge from US 190 to LA 1088, as well as construction of roundabouts at LA 1088 and US 190 intersections when permits are acquired from DOTD.
| 12/18/2024 08:00 PM UTC |
24-62-1
STP Library Technical and Maintenance Building Elevator-------------Elevator Shaft, Access Ramp, Closet and Elevator Equipment Room, Relocation of Exit Stairs, adjustments to electrical and data utilities, and associated finishes, further itemized as:
Removal of selected interior walls, doors, gypsum board, and exit stairs, Adjustment / relocation of existing utilities to accommodate new elevator and equipment, New elevator shaft, access ramp with railing, equipment and storage closets, Installation of new hydraulic powered LU/LA elevator and equipment. New electrical service and data line for remote elevator monitoring, New / relocated exit stair, New gypsum board walls and ceilings, new carpet flooring, Selective new doors and hardware, New computer and data wiring, New mini-split HVAC for elevator equipment room, Painting.
| 12/17/2024 08:00 PM UTC |
24-70-2
Turning Radii------The Contractor must provide all adequate and competent labor, equipment, tools, testing, and materials necessary to improve multiple turning radiuses by installing catch basins and drain pipes as specified along the following Parish roads:
• 4th Ave (R09I017) Section 23 Township 8S Range 14E Slidell;
• Jones Rd (R09D050) Section 34 Township 8S Range 14E Slidell;
• Cane Ave (R08L015) Section 6 Township 9S Range 15E Slidell;
• Doss Dr (R09D057) Section 34 Township 8S Range 14E Slidell;
• Dupard St (R04E143) Section 38 Township 8S Range 11E Mandeville;
• East Ave (R09G055) Section 38 Township 9S Range 14E Slidell;
• Forest Ln (R04D091) Section 40 Township 7S Range 11E Mandeville;
• Foy St (R04E122) Section 38 Township 8S Range 11E Mandeville;
• Wilkinson St (R04D041) Section 39 Township 8S Range 11E Mandeville; and
• America St (R04E331) Section 38 Township 8S Range 11E Mandeville, Louisiana.
| 12/11/2024 08:00 PM UTC |
24-72-2
Safe Haven Complex Parking Expansion----Project includes demolition of existing lots, construction of stoned and grid parking lots, concrete curb and drives, sidewalks, handicap parking, landscaping, storm drainage and swales.
| 12/11/2024 08:00 PM UTC |
24-66-2
24-66-2-Coin Du Lestin Estates Road Elevation--------Removal of asphalt and Portland cement concrete pavement, removal of combination concrete curb and gutter, removal of storm drains, milling asphalt pavement, base repair, new asphalt pavement, new concrete sidewalks, and new concrete drives, new combination concrete curb and gutter, cleaning and reshaping existing ditches, new storm drains, clean existing storm pipes and drop inlets, new catch basins, adjust manholes and catch basins to grade, relocation of existing mailboxes and other work as defined in the plans and specifications.This work is located in the Coin Du Lestin Subdivision on Laurant Rd, Bea Dr, Legendre Dr, Terrell Dr, and Faciane Lane.
| 12/10/2024 08:00 PM UTC |