General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-009-10757.1
Structure Replacements Structure A: Bridge No. 09-0071 Merrill Road Over Unt To Gifford Run Structure B: Bridge No. 09-0070 Merrill Road Over Mcnerney Run Forestry District 09, Moshannon State Forest Pennsylvania Game Commission, Northcentral Region, State Game Land 34 Girard Township, Clearfield County, Pennsylvania Work consists of replacement of an existing corrugated metal pipe arch conveying the UNT to Gifford Run under Merrill Road with a precast box culvert. Other work includes precast concrete end sections, aprons and headwalls, rock lining architectural surface treatment, driving surface aggregate (DSA) approach roadway and guide rail. This project will also replace an existing corrugated metal pipe arch carrying McNearny Run under Merrill Road with a precast rigid frame structure. Other work includes rock lining, channel lining, architectural surface treatment, and DSA approach roadway and guide rail. SDB Participation Goal: 17% VBE Participation Goal: 3% Engineer's Estimate: $600,000 - $1 Million
10/15/2026 05:00 PM UTC
FDC-131-101491.4
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $400,000
10/15/2026 05:00 PM UTC
FDC-131-101491.2
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate:
10/15/2026 05:00 PM UTC
FDC-131-101491.1
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $450,000
10/15/2026 05:00 PM UTC
FDC-010-104266.2
Sproul State Forest Office HVAC System Replacement Sproul Forestry District Noyes Township, Clinton County, Pennsylvania The existing water to water heat pumps, condenser water piping inside the building except for the HDPE piping from the well field, hydronic piping except for the radiant slab manifolds and pipe, variable air volume units, the variable air volume air handing unit, and the associated HVAC controls are to be demolished. The existing closed loop ground source well field and associated piping are to be reused. Water to air heat pumps connected to the existing ductwork, and a water to water heat pump connected to the existing radiant slab heating system is to be provided to replace the existing system. DGS Small Business Certification Required Project Description Engineer's Estimate: $250,000 - $300,000
10/29/2026 05:00 PM UTC
FDC-010-104266.4
Sproul State Forest Office HVAC System Replacement Sproul Forestry District Noyes Township, Clinton County, Pennsylvania The existing electrical system is to be modified in support of the HVAC system. The electrical work includes panelboard modifications, wire, conduit, lead/lag pump controller, disconnect switches, connections between HVAC controls, pumps, and pump controller. DGS Small Business Certification Required Engineer's Estimate: $35,000 - $45,000
10/29/2026 05:00 PM UTC
FDC-305-100166.1
Rehab STP - Fine Screen, Blowers, Paint Tanks Cowans Gap State Park Todd Township, Fulton County, Pennsylvania General Contract work covers the construction of a headworks structure, repair & maintenance work on the clarifier tank, replacement of existing blowers electric motors, treatment pond evacuation/re-lining, chlorination tank improvements, along with related site work and restoration. SDB Participation Goal 20% VBE Participation Goal 3% Engineer's Estimate: over $1 Million
10/29/2026 05:00 PM UTC
FDC-305-100166.4
Rehab STP - Fine Screen, Blowers, Paint Tanks Cowans Gap State Park Todd Township, Fulton County, Pennsylvania Electrical Contract work covers the wiring and panel installation of all proposed units including an influent screw screen, aeration equipment, and blower control timer. Work shall include installation of all necessary pathways/conduits, and all related appurtenances and restoration. DGS Small Business Certification Required Engineer's Estimate: $45,000 - $50,000
10/29/2026 05:00 PM UTC
FDC-500-825
RETENTION OF DESIGN PROFESSIONAL FIRMS PROJECT REFERENCE NO. FDC-500-825 The Commonwealth of Pennsylvania, Department of Conservation and Natural Resources (“Department” or “DCNR”), is issuing this Request for Proposals (“RFP”) from interested and qualified design professional firms (“Consultant” or “Offeror”) for an Open-End Contract or Contracts for various architectural, landscape architectural, and engineering design services. The contract or contracts will be for a 12-month period with four 12-month extensions possible. Projects will be assigned on an as-needed basis to ensure proper and safe operations of the Department’s infrastructure and facilities. The contract or contracts will be managed by the Department’s Bureau of Facility Design and Construction (“Bureau”). The number of Open-End Contracts and the dollar amount of each contract will be at the discretion of the Department for the first year. The extent of the work for the subsequent four years of the contract will be dependent on the availability of additional funds and additional projects for those years, also at the discretion of the Department. Proposals will only be accepted from individuals, firms, or corporations duly authorized to engage in the practice of architecture and/or engineering. If an individual, firm, or corporation not authorized to engage in the practice of architecture and/or engineering desires to submit a proposal said individual, firm, or corporation may do so as part of a joint venture with an individual, firm or corporation which is permitted under state law to engage in the practice of architecture and/or engineering in the Commonwealth of Pennsylvania. The design professional firm may be an architectural/engineering firm, an engineering/architectural firm, an architectural firm with landscape architectural and engineering sub-consultants, or an engineering firm with architectural and landscape architectural sub-consultants.
11/03/2026 09:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
FDC-411-102176.4R
Project Name: Electrical Construction, McConnell Hall Rehabilitation State Park/Forest: Nolde Forest Environmental Education Center Township/County: Camru Township, Berks County, Pennsylvania Project Description Work included under this contract consists of demolition of some existing interior light fixtures, replacing exterior light fixtures and adding new some new, replacing some electrical wiring and running new circuits, replacing lighting controls, replacing emergency lighting, replacing hand dryers, updating the existing electrical panel, replacing some light bulbs, and replacing a couple of receptacles. DGS Small Business Certification Required Engineer's Estimate: $25,000 - $50,000
07/06/2023 06:00 PM UTC
FDC-305-10755.1
Dam Control Tower, Masonry Veneer Repair Cowans Gap State Park Todd Township, Fulton County Work included under this contract consists of the restoration of stone masonry veneer where sections of stone masonry walls exhibit loose stones, or missing stones and preparing and repoints joints in the stone masonry veneer as shown on the contract drawings. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
06/22/2023 06:00 PM UTC
FDC-210-103441.1
Force Main Replacement LS7 Moraine State Park Muddy Creek Township, Butler County Work included under this contract consists of the complete construction of replacing an existing sewer force main connection between the lift station 7 and manhole #433 with approximately 2,100 L.F. of 8” DR-11 HDPE pipe PE4710. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
06/22/2023 06:00 PM UTC
FDC-414-102033.1R
Roadway Rehabilitations Promised Land State Park The work of this project will take place along Pickerel Point Road, North Shore Road and Ridgefield Point Road in Promised Land State Park located in Blooming Grove, Greene and Palmyra Townships, Pike County. Work included under this contract includes the full depth reclamation and repaving of approximately 1.1 miles of Pickerel Point Road, and the replacement of seven (7) existing culvert pipes and restoration of the ditch lines along the side of the road for storm water drainage improvements. Work also includes asphalt base repairs and installation of an asphalt wearing course along approximately 3 miles of North Shore Road and 0.4 miles of Ridgefield Road, and the rehabilitation of the Ridgefield Road over Big Inlet bridge. SDB Participation Goal: 0% VBE Participation Goal: 0% Engineer's Estimate: Over $1 Million
06/08/2023 06:00 PM UTC
FDC-115-103057.1R
General Construction, Install Electric Dam Gate Operators and Generator Lyman Run State Park West Branch Township, Potter County, Pennsylvajia 1. Work included under this contract consists of the complete construction and installation work for the following: a. Structural underwater inspection of water structures consisting of drawdown structure, upstream conduit, control tower, labyrinth spillway weir, and stilling basin. Work will also consist of design and installing a bulkhead in underwater conditions at the inlet structure after inspection of the inlet is completed. b. Remove and replace both upstream and downstream sluice gate stems in the control tower that are a part of the sluice gate system. c. Install two new electric operators and actuators sufficient enough to open the existing 96” sluice gates upstream and downstream in the control tower. d. Provide services of a Rodney Hunt and Rotork representative or approved equal to adjust the wedges of the sluice gate and set up the settings of the operators to run properly using the generator in FDC- 115-103057.4 contract. e. Have the contracted divers remove bulkhead after all work is completed and approved. SDB Participation Goal: 13% VBE Participation Goal: 3% Engineer's Estimate: $400,000 - $1 Million
06/01/2023 06:00 PM UTC
FDC-115-103057.4R
Electrical Construction Lyman Run State Park West Branch Township, Potter County, Pennsylvania The work under this project consists of providing a mobile generator system, generator interface kiosk with quick-connect disconnect switch, manual transfer switch, and actuator disconnect switches at Control Tower on the Dam at Lyman Run State Park. Work shall include all wiring and conduit, and utilization and demonstration of the mobile generator system in operating the gate actuators at the end of construction for start-up, training, and commissioning purposes. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
06/01/2023 06:00 PM UTC
FDC-303-103059.1
Stream and Pedestrian Bridge Restoration Caledonia State Park Green and Franklin Townships, Franklin and Adams Counties, Pennsylvania Work included under this contract consists of restoring four (4) pedestrian bridges and restoration activities of two (2) streams. DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
06/01/2023 06:00 PM UTC
FDC-117-103234.1
Dam Repairs Parker Dam State Park Huston Township, Clearfield County, Pennsylvania Work included under this contract consists of the complete construction and installation work for the following: a. Dewatering: 1. All dewatering activities required, partial drawdown of fivefoot (5’) of the normal pool elevation of the reservoir. b. E&S: 1. Implementation, maintenance, and removal of erosion and sedimentation control measures. c. Pressure pointing (7360 square feet): 1. Pressure Pointing of surfaces of the existing masonry structures listed below. a. Primary spillway east wall, floor, and west abutment wall b. Primary spillway vertical wall into stilling basin c. Upstream end of the west wing wall of the auxiliary spillway. d. Upstream east wing wall of the primary spillway. e. Control tower from normal pool elevation down 2 ft in elevation d. Fiberglass Staff Gauge: 1. Remove existing staff gauge and install a fiberglass staff Contract No. FDC-117-103234.1 SUMMARY OF WORK 01010-2 gauge to the main spillway wall upstream of the spillway. e. Stone Masonry Work (125 Square Feet): 1. Displaced hand laid stone on the upstream side of the dam must be reset to original location. a. Located on auxiliary spillway wing wall on the upstream side of the dam. b. Located between the control tower and bridge abutment. f. Concrete Spall Repair (770 cubic inches): 1. Repair cracked and spalled concrete along the walls located inside the control tower. The work will consist of the following listed below. a. Spall repairs located above the 5 ft drawdown mark. b. Spall repairs are located underwater that will need to be completed by divers. g. Excavating, Backfill, and Compacting (109 Cubic Feet): 1. Repair the ground under the stone masonry work located between the control tower and bridge SDB Participation Goal: 5% VBE Participation Goal: 3% Engineer's Estimate: $400,000 - $1 Million
06/01/2023 06:00 PM UTC
FDC-428-6503.1
General Construction, Shower House Replacement, Phase 1 and Full Service Campsites Locust Lake State Park Ryan Township, Schuylkill County, Pennsylvania This contract shall include all general construction work complete as depicted and defined on the contract drawings and as specified in these contract specifications. Main items of work consist essentially of, but are not limited to the following: a. Clearing and grubbing of trees, shrubs, and other vegetation. b. Excavation, trenching, backfill, and compaction work required for new general, plumbing, and electrical construction work. c. Rough and finish grading. d. Construction of roadway and parking areas. e. Construction of stone and asphalt spurs, aggregate campsite living areas and tent pads. f. Signage, striping and relocation of wheel stops. g. Subsurface stone basins and rain gardens. h. Storm Sewer piping, domed risers, inlets and outlet structures. i. Domestic Water and Sanitary sewer piping related to exterior improvements. j. Wood fence k. Rock construction fencing, silt socks, and inlet protection. l. Construction of concrete and asphalt sidewalks. m. Seeding, mulching, and landscaping. n. Structure Demolition of Existing Showerhouses 1 and 3. o. Construction of new Showerhouses 1 and 3 including concrete footings and piers; concrete masonry unit (cmu) foundations; ground face cmu walls with insulation fill; reinforced cmu shear walls grouted solid; interior sloping reinforced concrete slab on grade floors; exterior reinforced concrete slab on grade with perimeter turndowns; wood shear wall extension panels; structural steel columns; common wood trusses; and miscellaneous rough carpentry and sheathing. p. Showerhouses 1 and 3 Building Envelope: Fiber cement siding and trim; building insulation and vapor barrier; thin stone veneer with cut stone base and water table; asphalt shingle roof; steel doors and frames; and aluminum windows. q. Showerhouses 1 and 3 Building Finishes, Specialties and Furnishings: Gypsum wall board; PVC panel ceilings, resinous floors; ceramic tile shower walls and floors; interior and exterior painting; solid surface countertops and integral sinks; exterior stainless-steel counters with integrated sinks; toilet and shower partitions; and toilet accessories. r. Department instruction and training. SDB Participation Goal 9% VBE Participation Goal 3% Engineer's Estimate: Over $1 Million
05/25/2023 06:00 PM UTC
FDC-428-6503.2
Mechanical Construction, Showerhouse Replacement Phase 1 & Full Service Campsites Locust Lake State Park Ryan Township, Schuylkill County, Pennsylvania This contract shall include all general construction work complete as depicted and defined on the contract drawings and as specified in these contract specifications. Main items of work consist essentially of, but are not limited to the following: a. Space heaters h. Exhaust grilles. i. Exhaust fans and related ductwork and insulation. j. HVAC controls and control systems. k. Miscellaneous earthwork related to the installation of the mechanical contract work. l. Testing, adjusting, and balancing. m. Department instruction and training. DGS Small Business Certification Required Engineer's Estimate: $25,000 - $100,000
05/25/2023 06:00 PM UTC
241 - 250 of 266 Solicitations
1 2 … 19 20 21 22 23 25 27