General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-009-10757.1
Structure Replacements Structure A: Bridge No. 09-0071 Merrill Road Over Unt To Gifford Run Structure B: Bridge No. 09-0070 Merrill Road Over Mcnerney Run Forestry District 09, Moshannon State Forest Pennsylvania Game Commission, Northcentral Region, State Game Land 34 Girard Township, Clearfield County, Pennsylvania Work consists of replacement of an existing corrugated metal pipe arch conveying the UNT to Gifford Run under Merrill Road with a precast box culvert. Other work includes precast concrete end sections, aprons and headwalls, rock lining architectural surface treatment, driving surface aggregate (DSA) approach roadway and guide rail. This project will also replace an existing corrugated metal pipe arch carrying McNearny Run under Merrill Road with a precast rigid frame structure. Other work includes rock lining, channel lining, architectural surface treatment, and DSA approach roadway and guide rail. SDB Participation Goal: 17% VBE Participation Goal: 3% Engineer's Estimate: $600,000 - $1 Million
10/15/2026 05:00 PM UTC
FDC-131-101491.4
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $400,000
10/15/2026 05:00 PM UTC
FDC-131-101491.2
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate:
10/15/2026 05:00 PM UTC
FDC-131-101491.1
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $450,000
10/15/2026 05:00 PM UTC
FDC-010-104266.2
Sproul State Forest Office HVAC System Replacement Sproul Forestry District Noyes Township, Clinton County, Pennsylvania The existing water to water heat pumps, condenser water piping inside the building except for the HDPE piping from the well field, hydronic piping except for the radiant slab manifolds and pipe, variable air volume units, the variable air volume air handing unit, and the associated HVAC controls are to be demolished. The existing closed loop ground source well field and associated piping are to be reused. Water to air heat pumps connected to the existing ductwork, and a water to water heat pump connected to the existing radiant slab heating system is to be provided to replace the existing system. DGS Small Business Certification Required Project Description Engineer's Estimate: $250,000 - $300,000
10/29/2026 05:00 PM UTC
FDC-010-104266.4
Sproul State Forest Office HVAC System Replacement Sproul Forestry District Noyes Township, Clinton County, Pennsylvania The existing electrical system is to be modified in support of the HVAC system. The electrical work includes panelboard modifications, wire, conduit, lead/lag pump controller, disconnect switches, connections between HVAC controls, pumps, and pump controller. DGS Small Business Certification Required Engineer's Estimate: $35,000 - $45,000
10/29/2026 05:00 PM UTC
FDC-305-100166.1
Rehab STP - Fine Screen, Blowers, Paint Tanks Cowans Gap State Park Todd Township, Fulton County, Pennsylvania General Contract work covers the construction of a headworks structure, repair & maintenance work on the clarifier tank, replacement of existing blowers electric motors, treatment pond evacuation/re-lining, chlorination tank improvements, along with related site work and restoration. SDB Participation Goal 20% VBE Participation Goal 3% Engineer's Estimate: over $1 Million
10/29/2026 05:00 PM UTC
FDC-305-100166.4
Rehab STP - Fine Screen, Blowers, Paint Tanks Cowans Gap State Park Todd Township, Fulton County, Pennsylvania Electrical Contract work covers the wiring and panel installation of all proposed units including an influent screw screen, aeration equipment, and blower control timer. Work shall include installation of all necessary pathways/conduits, and all related appurtenances and restoration. DGS Small Business Certification Required Engineer's Estimate: $45,000 - $50,000
10/29/2026 05:00 PM UTC
FDC-500-825
RETENTION OF DESIGN PROFESSIONAL FIRMS PROJECT REFERENCE NO. FDC-500-825 The Commonwealth of Pennsylvania, Department of Conservation and Natural Resources (“Department” or “DCNR”), is issuing this Request for Proposals (“RFP”) from interested and qualified design professional firms (“Consultant” or “Offeror”) for an Open-End Contract or Contracts for various architectural, landscape architectural, and engineering design services. The contract or contracts will be for a 12-month period with four 12-month extensions possible. Projects will be assigned on an as-needed basis to ensure proper and safe operations of the Department’s infrastructure and facilities. The contract or contracts will be managed by the Department’s Bureau of Facility Design and Construction (“Bureau”). The number of Open-End Contracts and the dollar amount of each contract will be at the discretion of the Department for the first year. The extent of the work for the subsequent four years of the contract will be dependent on the availability of additional funds and additional projects for those years, also at the discretion of the Department. Proposals will only be accepted from individuals, firms, or corporations duly authorized to engage in the practice of architecture and/or engineering. If an individual, firm, or corporation not authorized to engage in the practice of architecture and/or engineering desires to submit a proposal said individual, firm, or corporation may do so as part of a joint venture with an individual, firm or corporation which is permitted under state law to engage in the practice of architecture and/or engineering in the Commonwealth of Pennsylvania. The design professional firm may be an architectural/engineering firm, an engineering/architectural firm, an architectural firm with landscape architectural and engineering sub-consultants, or an engineering firm with architectural and landscape architectural sub-consultants.
11/03/2026 09:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
FDC-451-10264.1
Structure Replacement Bridge No. 6451-7501 Charles Bailey Trail Over E.B. White Clay Creek White Clay Creek Preserve London Britain Township Chester County, Pennsylvania Project Description All site work to suit project preparation, execution, and completion. Disassemble the existing damaged truss foot bridge and deliver the disassembled bridge to Pine Grove Furnace State Park. Remove and reconstruct portion of the existing reinforced concrete abutment cap. The existing reinforcement shall be cleaned and remain in place. Provide and erect a new structure consisting of a prefabricated FRP Truss superstructure on existing stone masonry abutments with a structure length of 56'-4" and a rail-to-rail width of 6'-6". Other work includes temporary stream crossing, temporary erosion control measures. DGS Small Business Certification Required Engineer's Estimate: 100,000-250,000
10/05/2023 06:00 PM UTC
FDC-450-101095.1
Project Name : Structure Rehabilation Bridge No. 6450-3113 Delaware Canal Lumberville Aqueduct & Towpath Bridge Over Paunacussing Creek Delaware Canal State Park Solebury Township Bucks County, Pennsylvania Project Description Remove of portions of an existing aqueduct substructure carrying the Delaware Canal and Tow Path over the Paunacussing Creek (09 7935 6450 3113). The removal and partial removal also consists of three retaining canal walls (wingwalls). The new aqueduct structure will consist of full height reinforced concrete abutments located within the existing stone masonry canal walls and will support a new single span prestressed concrete adjacent box beam aqueduct. The new pedestrian structure will consist of a single span steel rolled beam bridge with a timber deck set atop new beam seats. SDB Participation Goal: 11% VBE Participation Goal: 3% Engineer's Estimate: $2,000,000 - 3,000,000
10/05/2023 06:00 PM UTC
FDC-400-102665.4R
Installing EV charging stations at Three State Parks. Project Description: Installing EV Charging Stations at Three State Parks. DGS Small Business Certification Required Engineer's Estimate: $50,000-200,000
09/21/2023 08:30 PM UTC
FDC-016-10033.1
Structure Replacement Culvert No 16-0040, Fallbrook Cemetery Road Over Hemlock Hollow Run Forest District 16 Tioga State Forest Ward Township Tioga County, Pennsylvania, Project Description : Demolition of an existing structure, Fallbrook Cemetery Road over Hemlock Hollow Run, consisting of a corrugated metal pipe. It will be replaced with a precast reinforced concrete box culvert and precast reinforced concrete end sections. The 16-foot span, 6-foot rise proposed precast box culvert will provide an 18-foot clear roadway width. Replacement includes No. 2A coarse aggregate driving surface, guiderail, rock lining, and architectural surface treatment. DGS Small Business Certification Required: Yes Engineer's Estimate: 200,000 - 600,000
09/07/2023 06:00 PM UTC
FDC-450-102353.1
Structure Replacement Bridge No. 6450-2181 Bowman's Hill Wastegate Rehabilitation Delaware Canal State Park Upper Makefield Township, Bucks County Project Description: a. All site work to suit project preparation, execution, and completion. b. Rehabilitation of existing structure: Bowman’s Hill Wastegate carrying Canal Towpath over Delaware Canal Bowman’s Hill Wastegate is a two-span rolled steel I-beam bridge with a total length of 33’. The existing superstructure will be replaced with rolled steel I-beams and a nail-laminated timber deck. c. Repair any voids in and repoint the existing stone masonry pier, abutments, and wingwalls. Rebuild the concrete bridge seats. d. Rebuild the concrete wastegate floor and install cutoff walls at the upstream and downstream. e. Underpin the areas of undermining of the wastegate floor and wingwalls. f. Replace the timber wastegate doors and paint and lubricate the existing wastegate gears, gear lock and axles. g. Install R-6 rip-rap rock protection at the outlet. DGS Small Business Certification Required: Yes Engineer's Estimate: $100,000 - $400,000
09/07/2023 06:00 PM UTC
FDC-450-103398.1
Structure Replacement Bridge No. 6450-2409 Towpath Bypass Over Delaware Canal Inlet Delaware Canal State Park Borough Of New Hope Bucks County, Pennsylvania Project Description a. All site work to suit project preparation, execution, and completion. b. Demolition of the existing structure carrying Towpath Bypass over Delaware Canal of a 59’-0” long x 75’-0” wide (3) cell Corrugated Metal Pipe culvert. This structure will be replaced with a Single Span Composite Prestressed Concrete Adjacent Box Beam Superstructure atop Precast Reinforced Concrete Cantilever Abutments that will provide a 13’-2 ¼” clear roadway width between the PA Type 10M Bridge Barriers. Replacement includes driving surface aggregate and rock lining. c. Construction of PA Type 10M Bridge Barrier, measured from end of structure to end of structure. d. Construction of a temporary crossing at approximately 60’ south of the bridge site to maintain access to the eastern canal berm. e. Reconstruction of the stone masonry retaining wall located along the west berm of the canal. SDB Participation Goal: 5% VBE Participation Goal: 3% Engineer's Estimate: $400,000 - $800,000
09/07/2023 06:00 PM UTC
FDC 003-101782.1
Replace Aboveground Gas/Diesel Tanks Forest District #3, Tuscarora State Forest Perry County, Pennsylvania Remove (2) existing 2,000 gallon aboveground vault fuel tanks (one gasoline; one diesel) and install (2) new 2,000 gallon above ground fuel tanks. Providing new tanks will be the responsibility of the Contractor. Removal of existing vault tanks from the site will be the responsibility of the Contractor. Work shall result in a complete and operational 2,000 gallon gasoline and 2,000 gallon diesel above ground fuel tank system DGS Small Business Certification Required Contractor MUST BE AMMX and AMR Certified to bid on this project. Engineer's Estimate: $100,000 - $400,000
08/24/2023 06:00 PM UTC
FDC-001-103283.1
STRUCTURE REPLACEMENT, BRIDGE NO. 01-0031 BIRCH RUN ROAD OVER UNNAMED TRIBUTARY TO BIRCH RUN FOREST DISTRICT 1, MICHAUX TOWNSHIP FRANKLIN TOWNSHIP ADAMS COUNTY, PENNSYLVANIA DGS Small Business Certification Required Engineer's Estimate: $100,000 - $400,000
08/24/2023 06:00 PM UTC
FDC-002-103271.1
STRUCTURE REPLACEMENT BRIDGE NO. 02-0011 OREGON ROAD OVER UNT TO OREGON CREEK, FOREST DISTRICT 2, BUCHANAN STATE FOREST WELLS TOWNSHIP, FULTON COUNTY, PENNSYLVANIA SDB Participation Goal : 0 % VBE Participation Goal: 0 % Engineer's Estimate: $300,000-$600,000
08/24/2023 06:00 PM UTC
FDC-020-103286.1
Structure Replacement Bridge A No. 20-9020 Upper Pleasant Stream Road Over Pleasant Stream Bridge B No. 20-9016 Masten Road Over Sixth Bottom Run Forest District 20, Loyalsock State Forest Mcnett, Cascade & Mcintyre Townships Lycoming County, Pennsylvania SDB Participation Goal 20 % VBE Participation Goal 3 % Engineer's Estimate: Over $ 1 million
08/24/2023 06:00 PM UTC
221 - 230 of 266 Solicitations
1 2 … 19 20 21 23 25 26 27