General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-009-10757.1
Structure Replacements Structure A: Bridge No. 09-0071 Merrill Road Over Unt To Gifford Run Structure B: Bridge No. 09-0070 Merrill Road Over Mcnerney Run Forestry District 09, Moshannon State Forest Pennsylvania Game Commission, Northcentral Region, State Game Land 34 Girard Township, Clearfield County, Pennsylvania Work consists of replacement of an existing corrugated metal pipe arch conveying the UNT to Gifford Run under Merrill Road with a precast box culvert. Other work includes precast concrete end sections, aprons and headwalls, rock lining architectural surface treatment, driving surface aggregate (DSA) approach roadway and guide rail. This project will also replace an existing corrugated metal pipe arch carrying McNearny Run under Merrill Road with a precast rigid frame structure. Other work includes rock lining, channel lining, architectural surface treatment, and DSA approach roadway and guide rail. SDB Participation Goal: 17% VBE Participation Goal: 3% Engineer's Estimate: $600,000 - $1 Million
10/15/2026 05:00 PM UTC
FDC-131-101491.4
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $400,000
10/15/2026 05:00 PM UTC
FDC-131-101491.2
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate:
10/15/2026 05:00 PM UTC
FDC-131-101491.1
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $450,000
10/15/2026 05:00 PM UTC
FDC-010-104266.2
Sproul State Forest Office HVAC System Replacement Sproul Forestry District Noyes Township, Clinton County, Pennsylvania The existing water to water heat pumps, condenser water piping inside the building except for the HDPE piping from the well field, hydronic piping except for the radiant slab manifolds and pipe, variable air volume units, the variable air volume air handing unit, and the associated HVAC controls are to be demolished. The existing closed loop ground source well field and associated piping are to be reused. Water to air heat pumps connected to the existing ductwork, and a water to water heat pump connected to the existing radiant slab heating system is to be provided to replace the existing system. DGS Small Business Certification Required Project Description Engineer's Estimate: $250,000 - $300,000
10/29/2026 05:00 PM UTC
FDC-010-104266.4
Sproul State Forest Office HVAC System Replacement Sproul Forestry District Noyes Township, Clinton County, Pennsylvania The existing electrical system is to be modified in support of the HVAC system. The electrical work includes panelboard modifications, wire, conduit, lead/lag pump controller, disconnect switches, connections between HVAC controls, pumps, and pump controller. DGS Small Business Certification Required Engineer's Estimate: $35,000 - $45,000
10/29/2026 05:00 PM UTC
FDC-305-100166.1
Rehab STP - Fine Screen, Blowers, Paint Tanks Cowans Gap State Park Todd Township, Fulton County, Pennsylvania General Contract work covers the construction of a headworks structure, repair & maintenance work on the clarifier tank, replacement of existing blowers electric motors, treatment pond evacuation/re-lining, chlorination tank improvements, along with related site work and restoration. SDB Participation Goal 20% VBE Participation Goal 3% Engineer's Estimate: over $1 Million
10/29/2026 05:00 PM UTC
FDC-305-100166.4
Rehab STP - Fine Screen, Blowers, Paint Tanks Cowans Gap State Park Todd Township, Fulton County, Pennsylvania Electrical Contract work covers the wiring and panel installation of all proposed units including an influent screw screen, aeration equipment, and blower control timer. Work shall include installation of all necessary pathways/conduits, and all related appurtenances and restoration. DGS Small Business Certification Required Engineer's Estimate: $45,000 - $50,000
10/29/2026 05:00 PM UTC
FDC-500-825
RETENTION OF DESIGN PROFESSIONAL FIRMS PROJECT REFERENCE NO. FDC-500-825 The Commonwealth of Pennsylvania, Department of Conservation and Natural Resources (“Department” or “DCNR”), is issuing this Request for Proposals (“RFP”) from interested and qualified design professional firms (“Consultant” or “Offeror”) for an Open-End Contract or Contracts for various architectural, landscape architectural, and engineering design services. The contract or contracts will be for a 12-month period with four 12-month extensions possible. Projects will be assigned on an as-needed basis to ensure proper and safe operations of the Department’s infrastructure and facilities. The contract or contracts will be managed by the Department’s Bureau of Facility Design and Construction (“Bureau”). The number of Open-End Contracts and the dollar amount of each contract will be at the discretion of the Department for the first year. The extent of the work for the subsequent four years of the contract will be dependent on the availability of additional funds and additional projects for those years, also at the discretion of the Department. Proposals will only be accepted from individuals, firms, or corporations duly authorized to engage in the practice of architecture and/or engineering. If an individual, firm, or corporation not authorized to engage in the practice of architecture and/or engineering desires to submit a proposal said individual, firm, or corporation may do so as part of a joint venture with an individual, firm or corporation which is permitted under state law to engage in the practice of architecture and/or engineering in the Commonwealth of Pennsylvania. The design professional firm may be an architectural/engineering firm, an engineering/architectural firm, an architectural firm with landscape architectural and engineering sub-consultants, or an engineering firm with architectural and landscape architectural sub-consultants.
11/03/2026 09:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
FDC-014-104713.1
Plug and Properly Abandon Orphaned Oil & Gas Wells South Tank Hill Tract, DGS-196-13, Phase 4 Cornplanter State Forest Harmony Township, Forest County, Pennsylvania Work included under this Contract consists of the construction required to clean out and plug eighteen (18) orphaned oil & gas wells. Major items of work include construction of access routes to the wells, using approved well plugging equipment and materials to clean out and seal the wells, along with restoring the areas after construction. Proper erosion and sediment controls must be implemented during and after construction until the sites are stabilized. SDB Participation Goal 0% VBE Participation Goal 0% Engineer's Estimate: $800,000 - 850,000
10/01/2026 05:00 PM UTC
FDC-010-103030.1
Structure Replacement, Bridge No. 10-0084, Hensel Fork Road Over Hensel Fork Forest District 10, Sproul State Forest Leidy Township, Clinton County, Pennsylvania Replacing an existing 36-inch Corrugated Metal Pipe with a Precast Concrete Box Culvert (6ftx4ft). The proposed structure will have an 18 ft roadway width. Also to repair an approximately 55 ft section of roadway slide with R-7 riprap. DGS Small Business Certification Required Engineer's Estimate: $350,000 - $400,000
10/01/2026 05:00 PM UTC
FDC-425-7436.1
Mill Dairy Trail Bridge Abutment Underpinning Tyler State Park Northampton Township, Bucks County, Pennsylvania The project consists of underpinning of the existing scoured stone masonry foundation with reinforced concrete apron on the face of the North Abutment including replacement of several missing stones along the bottom of the abutment wall. The project is located in in Tyler State Park near the intersection of Stable Mill Trail and Mil Dairy Trail in Northampton Township, Bucks County, Pennsylvania. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
10/01/2026 05:00 PM UTC
FDC-414-10716.1
Reroof Park Office Promised Land State Park Greentown Township, Pike County, Pennsylvania Work included under this contract consists of demolition the complete roofing system and installation of new roofing system, including but not limited to remove and reinstall the heat trace cable, remove and replace damaged plywood sheathing, remove and replace skylights, replace starter strip, ridge cap, ridge vent, underlayment, ice & water shield, drip edge, flashing, pipe boots, repair aluminum soffit, remove and reinstall wood siding and wood fascia. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
10/01/2026 05:00 PM UTC
FDC-109-103106.1R
Construct New Office Hills Creek State Park Charleston Township, Tioga County, Pennsylvania The work under this project consists of the development and construction of the new Park Office, at Hills Creek State Park and the demolition of the contact station within the Park. SDB Participation Goal: 14% VBE Participation Goal: 3% Engineer's Estimate: over $1 Million
09/17/2026 05:00 PM UTC
FDC-109-103106.2R
Construct New Office Hills Creek State Park Charleston Township, Tioga County, Pennsylvania Construct a new LEED certified office at, or near present location. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $600,000
09/17/2026 05:00 PM UTC
FDC-109-103106.3R
Construct New Office Hills Creek State Park Charleston Township, Tioga County, Pennsylvania Construct a new LEED certified office at, or near present location. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $600,000
09/17/2026 05:00 PM UTC
FDC-109-103106.4R
Construct New Office Hills Creek State Park Charleston Township, Tioga County, Pennsylvania Construct a new LEED certified office at, or near present location. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $600,000
09/17/2026 05:00 PM UTC
FDC-318-10738.1
Replace/Rebuild Blowers at Sewage Treatment Plant Canoe Creek State Park Frankstown Township, Blair County, Pennsylvania Remove and replace the Gardner Denver Centrifugal Blowers in the Sewer Treatment Plant with the same or similar equipment. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $600,000
09/03/2026 05:00 PM UTC
FDC-133-102948.1R
Rehabilitation of Marina Road, West Launch Road, & Rustic Campground Road Bald Eagle State Park Howard and Liberty Townships, Centre County, Pennsylvania Work included under this contract consists of reclamation, paving, and grading work on Marina Road, West Launch Road, and Rustic Campground Road at Bald Eagle State Park as specified in the plan. SDB Participation Goal: 13% VBE Participation Goal: 3% Engineer's Estimate: $600,000 - $1 Million
09/03/2026 05:00 PM UTC
1 - 10 of 266 Solicitations
← Previous 1 3 4 5 6 7 8 9 … 26 27