General Info

Business Logo

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

400 Market St, Harrisburg, PA 17101-2301
(717) 783-0190

Bureau of Facility Design and Construction
For general questions please email us at RA-NRFDC_CONTRACTING@pa.gov.  For project specific questions the question must be asked via the Q&A Section in the Project Advertisement on Bid Express.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
FDC-009-10757.1
Structure Replacements Structure A: Bridge No. 09-0071 Merrill Road Over Unt To Gifford Run Structure B: Bridge No. 09-0070 Merrill Road Over Mcnerney Run Forestry District 09, Moshannon State Forest Pennsylvania Game Commission, Northcentral Region, State Game Land 34 Girard Township, Clearfield County, Pennsylvania Work consists of replacement of an existing corrugated metal pipe arch conveying the UNT to Gifford Run under Merrill Road with a precast box culvert. Other work includes precast concrete end sections, aprons and headwalls, rock lining architectural surface treatment, driving surface aggregate (DSA) approach roadway and guide rail. This project will also replace an existing corrugated metal pipe arch carrying McNearny Run under Merrill Road with a precast rigid frame structure. Other work includes rock lining, channel lining, architectural surface treatment, and DSA approach roadway and guide rail. SDB Participation Goal: 17% VBE Participation Goal: 3% Engineer's Estimate: $600,000 - $1 Million
10/15/2026 05:00 PM UTC
FDC-131-101491.4
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $400,000
10/15/2026 05:00 PM UTC
FDC-131-101491.2
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate:
10/15/2026 05:00 PM UTC
FDC-131-101491.1
Upgrade Dam Control Facilities Shikellamy State Park City of Sunbury, Northumberland County, Pennsylvania Physical work on and within the blower house building shall only occur from October 2027 through April 2028. The building must remain functional and operational at all other times for the operation of the dam. Components required for the project may have long lead times. Sufficient time is built into the project schedule for these items prior to physical construction on the building. This Contract includes, but is not limited to, salvage of existing mechanical equipment, select demolition of the existing Dam Control Building, construction of a building addition and second floor, construction of a new bituminous driveway, rearrangement of blowers and compressor air piping, installation of a new electrical power system and emergency generator and replacement of the existing dam control panel. DGS Small Business Certification Required Engineer's Estimate: $250,000 - $450,000
10/15/2026 05:00 PM UTC
FDC-010-104266.2
Sproul State Forest Office HVAC System Replacement Sproul Forestry District Noyes Township, Clinton County, Pennsylvania The existing water to water heat pumps, condenser water piping inside the building except for the HDPE piping from the well field, hydronic piping except for the radiant slab manifolds and pipe, variable air volume units, the variable air volume air handing unit, and the associated HVAC controls are to be demolished. The existing closed loop ground source well field and associated piping are to be reused. Water to air heat pumps connected to the existing ductwork, and a water to water heat pump connected to the existing radiant slab heating system is to be provided to replace the existing system. DGS Small Business Certification Required Project Description Engineer's Estimate: $250,000 - $300,000
10/29/2026 05:00 PM UTC
FDC-010-104266.4
Sproul State Forest Office HVAC System Replacement Sproul Forestry District Noyes Township, Clinton County, Pennsylvania The existing electrical system is to be modified in support of the HVAC system. The electrical work includes panelboard modifications, wire, conduit, lead/lag pump controller, disconnect switches, connections between HVAC controls, pumps, and pump controller. DGS Small Business Certification Required Engineer's Estimate: $35,000 - $45,000
10/29/2026 05:00 PM UTC
FDC-305-100166.1
Rehab STP - Fine Screen, Blowers, Paint Tanks Cowans Gap State Park Todd Township, Fulton County, Pennsylvania General Contract work covers the construction of a headworks structure, repair & maintenance work on the clarifier tank, replacement of existing blowers electric motors, treatment pond evacuation/re-lining, chlorination tank improvements, along with related site work and restoration. SDB Participation Goal 20% VBE Participation Goal 3% Engineer's Estimate: over $1 Million
10/29/2026 05:00 PM UTC
FDC-305-100166.4
Rehab STP - Fine Screen, Blowers, Paint Tanks Cowans Gap State Park Todd Township, Fulton County, Pennsylvania Electrical Contract work covers the wiring and panel installation of all proposed units including an influent screw screen, aeration equipment, and blower control timer. Work shall include installation of all necessary pathways/conduits, and all related appurtenances and restoration. DGS Small Business Certification Required Engineer's Estimate: $45,000 - $50,000
10/29/2026 05:00 PM UTC
FDC-500-825
RETENTION OF DESIGN PROFESSIONAL FIRMS PROJECT REFERENCE NO. FDC-500-825 The Commonwealth of Pennsylvania, Department of Conservation and Natural Resources (“Department” or “DCNR”), is issuing this Request for Proposals (“RFP”) from interested and qualified design professional firms (“Consultant” or “Offeror”) for an Open-End Contract or Contracts for various architectural, landscape architectural, and engineering design services. The contract or contracts will be for a 12-month period with four 12-month extensions possible. Projects will be assigned on an as-needed basis to ensure proper and safe operations of the Department’s infrastructure and facilities. The contract or contracts will be managed by the Department’s Bureau of Facility Design and Construction (“Bureau”). The number of Open-End Contracts and the dollar amount of each contract will be at the discretion of the Department for the first year. The extent of the work for the subsequent four years of the contract will be dependent on the availability of additional funds and additional projects for those years, also at the discretion of the Department. Proposals will only be accepted from individuals, firms, or corporations duly authorized to engage in the practice of architecture and/or engineering. If an individual, firm, or corporation not authorized to engage in the practice of architecture and/or engineering desires to submit a proposal said individual, firm, or corporation may do so as part of a joint venture with an individual, firm or corporation which is permitted under state law to engage in the practice of architecture and/or engineering in the Commonwealth of Pennsylvania. The design professional firm may be an architectural/engineering firm, an engineering/architectural firm, an architectural firm with landscape architectural and engineering sub-consultants, or an engineering firm with architectural and landscape architectural sub-consultants.
11/03/2026 09:00 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
FDC-411-102176.3R
Plumbing Construction, McConnell Hall Rehab Nolde Forest Environmental Education Center Cumru Township, Berks County The work under this project consists of renovations to an existing education building. DGS Small Business Certification Required Engineer's Estimate: $50,000 - 100,000
12/21/2023 07:00 PM UTC
FDC-411.102176.4R
Electrical Construction, McConnell Hall Rehab Nolde Forest Environmental Education Center Cumru Township, Berks County The work under this project consists of renovations to an existing education building. DGS Small Business Certification Required Engineer's Estimate: $50,000 - $100,000
12/21/2023 07:00 PM UTC
FDC-015-11019.1
Construct Woven Wire Deer Fencing Forest District #15, Susquehannock State Forest Chapman, Leidy, Abbott, Wharton, Stewardson Townships Clinton and Potter Counties, Pennsylvania Construct Woven Wire Deer Fencing DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
11/30/2023 07:00 PM UTC
FDC-016-11018.1
Construct Woven Wire Deer Fencing Forest District #16, Tioga State Forest Elk Township, Tioga County, Pennsylvania Construct Woven Wire Deer Fencing DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
11/30/2023 07:00 PM UTC
FDC-020-10896.1
Construct Woven Wire Deer Fencing, Phase 2 Forest District #20, Loyalsock State Forest McNett, Fox, and Cascade Townships Lycoming County, Pennsylvania DGS Small Business Certification Required Engineer's Estimate: $100,000 - $500,000
11/16/2023 07:00 PM UTC
FDC-211-103399.4
CONSTRUCT SOLAR ARRAY AT HELIPORT OHIOPYLE STATE PARK STEWART TOWNSHIP, FAYETTE COUNTY, PENNSYLVANIA Work included under this contract consists of new service entrance equipment as required by the utility company, new solar ground mount racking systems & foundations, underground trenching and backfilling for electric service & solar array circuits, miscellaneous earthwork, and all related appurtenances associated with the Electrical contract and construction work as indicated on the Contract Drawings. SDB Participation Goal 11% VBE Participation Goal 3% Engineer's Estimate: Over $1 Million
11/16/2023 07:00 PM UTC
FDC-003-101782.1R
Project Name: Replace Aboveground Gas/Diesel Tanks At Bryner Maintenance HQ Forest District #3, Tuscarora State Forest Toboyne Township Perry County, Pennsylvania Project Description : Remove (2) existing 2,000 gallon aboveground vault fuel tanks (one gasoline; one diesel) and install (2) new 2,000 gallon above ground fuel tanks. DGS Small Business Certification Required Engineer's Estimate: $100,000-400,000
11/02/2023 06:00 PM UTC
FDC-003-10049.1
Project Name: Structure Replacement Bridge No. 03-0052 Wynn Gap Haul Road Over Unt To East Licking Creek Forest District 3, Tuscarora State Forest Bratton Township Mifflin County, Pennsylvania Project Description: a. Demolition of existing corrugated metal pipe arch structure and stone wingwalls carrying Wynn Gap Haul Road over UNT to East Licking Creek and replacement witha single cell precast reinforced concrete box culvert. Other work includes rock lining, architectural surface treatment, and 2RC approach roadway. c. Construction of roadway. d. Demolition of existing corrugated metal pipe carrying Wynn Gap Haul Road over UNT to East Licking Creek and replacement with a thermoplastic pipe. Other work includes pipe inlet/outlet protection, and proposed endwalls. DGS Small Business Certification Required Engineer's Estimate: $ 300,000- $600,000
11/02/2023 06:00 PM UTC
FDC-202-102897.1
Project Name: Rehab River Well Cook Forest State Park Barnett Township Forest County, Pennsylvania Project Description: Work included under this contract consists of modifications of the existing water treatment system. This includes removal of the existing UV disinfection light and installation of an underground chlorine contact loop for the purpose of achieving a 4-log treatment of viruses. Existing hydropneumatic tank, water meter, cartridge filter and associated piping will be replaced. DGS Small Business Certification Required. Engineer's Estimate: $50,000 - $100,000
10/19/2023 06:00 PM UTC
FDC-210-103441.1R
Force Main Replacement Ls7 Moraine State Park Franklin Township Butler County, Pennsylvania Project Description: Complete construction of replacing an existing sewer force main connection between the lift station 7 and manhole #433 with approximately 2,100 L.F. of 8” DR-11 HDPE pipe PE4710. Work shall include, but not be limited to, the following: Horizontal Directional Drilling for the installation of approximately 2,100 L.F. of 8” diameter IPS DR-11 HDPE sewage force main piping at the general locations shown on the Drawings. DGS Small Business Certification Required Engineer's Estimate: 100,000 - 250,000
10/05/2023 06:00 PM UTC
211 - 220 of 266 Solicitations
1 2 … 18 19 20 22 24 25 26 27