Massachusetts Bay Transportation Authority (MBTA) - Capital Programs Division
10 Park Plz, Boston, MA 02116-3933
(617) 222-3200
10 Park Plz, Boston, MA 02116-3933
(617) 222-3200
Name * | Description | |
---|---|---|
Number | Deadline |
---|---|
A34CN01- CMAR RFQ
CMAR Downtown Crossing Phase 2 and Central Square Station Accessibility Improvements, Boston and Cambridge, MA
Project Description
DTX Phase II:
Macy’s Elevator - Construction and installation of a new 2-stop Macy’s elevator, which will provide connection from, and, to the Orange Line Northbound to the Red Line Southbound Platforms, along with the associated mechanical rooms and machinery.
Winter Street Elevator: Replacement of the existing 2-stop Winter Street elevator with a larger, 3-stop elevator, which will provide transfers from, and, to street level, Orange Line Southbound, & Red Line Southbound Platforms, along with the associated mechanical rooms, machinery, new Red Line Lobby Area, and extension of the South Passageway.
Park Street Elevator: Construction and installation of a 2-stop Park Street elevator, which will provide connection from, and, to Orange Line Southbound, Green Line Eastbound, and Red Line Center Platform, along with associated mechanical rooms and machinery.
Central Square Station:
Work consists of updating Central Square Station to meet current accessibility requirements. Specifically, the proposed project will replace existing elevator #860 and elevator hoistway which extends from the Red Line outbound platform up to street level in Central Square. Additionally, the work includes the construction of two new elevators, one inbound and one outbound which extend from the Red Line inbound and outbound platform up to street level in Central Square, these will require curb modifications and traffic bollards along Mass Ave. New Areas of Rescue Assistance, one inbound and one outbound will be located adjacent to the new elevators and will be equipped with Stryker chairs, emergency call boxes and smoke proof enclosures. The inbound escalator will be modernized with a HD Transit-rated escalator with two step run-on and run-off to fit within the existing concrete areaway.
| 05/01/2025 03:00 PM UTC |
H32CN01-DB RFQ
DB North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades, Boston, Cambridge and Somerville, MA
The purpose of the North Station Draw One Bridge Replacement and Associated Track & Signal Upgrades Project is to replace the Draw One Bridge, the Signal Tower A, and associated MBTA track and signal infrastructure. The existing Draw One Bridge consists of two adjacent two-track bridge spans crossing the Charles River. Signal Tower A is located just north of the Draw One Bridge, east of the tracks. Due to the deteriorated condition of the building, a temporary control tower was built in 2018. Conduits below grade connect the temporary control tower to equipment in the adjacent Signal Tower A. Description + any other pertinent information you wish to summarize for vendors who may reference the solicitation.
| 05/19/2025 03:00 PM UTC |
Number | Deadline |
---|---|
Z91PS75-77
FIRE PROTECTION DESIGN AND ENGINEERING SERVICES
The Massachusetts Bay Transportation Authority (MBTA) Engineering and Capital Divisions has identified the need for from qualified parties to prepare
Design/Engineering, Consulting, Testing, Commissioning, and Inspection Services of Fire Protection systems, to be fully scoped within MBTA Engineering and assigned on a Task Order basis.
The selected consultants will exhibit a depth of experience and expertise to support Testing, Commissioning, and Inspection Services of Fire Protection system to support the MBTA Project Manager for this project.
| 09/09/2024 06:00 PM UTC |
SUBPS14-16
General Engineering Consulting Services for Rail Vehicle Maintenance Task Order Contracts
Revenue Fleet Analysis, Non-Revenue Fleet Analysis, Facilities Plan, Revenue Fleet Overhauls, Revenue and Non-Revenue Fleet Purchasing Plans, Quality Assurance, Inspections, Testing, Audits, Project Management Assistance, Procurement Assistance and additional tasks as required.
| 08/06/2024 06:00 PM UTC |
Z91PS67-74
General Engineering Consulting Services for the Engineering & Capital Division
Design and Construction Phase Services for State of Good Repair Infrastructure and Facility Improvements and Modernization. The services are intended to support improvements to all MBTA assets including but not limited to: stations, tracks, roadways, signals, power infrastructure, parking facilities, storage/maintenance facilities, and office buildings.
| 08/05/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.