Massachusetts Bay Transportation Authority (MBTA) - Capital Programs Division
10 Park Plz, Boston, MA 02116-3933
(617) 222-3200
10 Park Plz, Boston, MA 02116-3933
(617) 222-3200
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
Y42CN01 DB RFP Technical Proposal Page
Y42CN01 DB Red Line Hi-Rail Access Tunnel Cambridge, MA
The purpose of this project is to provide a new access point to the Red Line northwest of the Charles River that will accommodate equipment, labor, and material delivery into the tunnel more efficiently. The MBTA Red Line subway northwest of the Charles River consists of a below grade tunnel with access for equipment, such as Hi-Rail vehicles, and maintenance only available just east of the Kendall/MIT station, some four miles from Alewife Station at the First Street gate. With the existing tunnel being over 25-ft below ground surface near Alewife, a tunnel is the most practical means of providing access from grade to the tunnel below for access.
| 12/10/2026 04:00 PM UTC |
| Number | Deadline |
|---|---|
|
Y12PS01 SOQs
Design & Engineering Services for Blue Line Airport Portal Flood Protection
The Massachusetts Bay Transportation Authority (MBT A) Engineering and Capital Division is requesting proposals from multi-disciplined engineering firms/teams to provide design and engineering services for the Airport Portal Flood Protection project. MBTA has identified the need to address flood vulnerability in the MBTA's Blue Line and the tunnel portal west of Airport Station by designing and implementing a hinged portal flood door.
The selected consultants will exhibit a depth of experience and expertise in the design and construction of tunnel, rail, power, and resiliency infrastructure to support MBTA on this project.
| 10/15/2024 06:00 PM UTC |
|
Z91PS80-81 Request for Qualifications
Z91PS80-81 Owner's Project Manager (OPM) Services on a Task Order Basis
The Massachusetts Bay Transportation Authority is soliciting Consultant Teams to perform Owner's Project Manager administrative and technical support services including but not limited to budget and schedule development/management; design oversight and review; construction coordination and monitoring; furniture, fixtures, and equipment (FF&E) move management; and punch list and closeout management.
| 10/11/2024 06:00 PM UTC |
|
Z91PS78-79 SOQs
General Engineering Consulting Services for Design & Engineering Code Compliance
The Massachusetts Bay Transportation Authority (MBTA) requires Professional Engineering Services and is soliciting proposals from qualified parties to provide General Code Consulting Services, including but not limited to: Fire Protection, Fire Alarm, Emergency Lighting and Power, NFPA 130 Egress Evaluation, Ventilation and Smoke Modeling, Ventilation System Analysis and Design Assist, Energy Storage and Electric Vehicles, Chapter 34 Analysis, and NFPA 241 Construction Fire Safety & Impairment Plan Consulting.
| 09/13/2024 06:00 PM UTC |
|
Z91PS75-77
FIRE PROTECTION DESIGN AND ENGINEERING SERVICES
The Massachusetts Bay Transportation Authority (MBTA) Engineering and Capital Divisions has identified the need for from qualified parties to prepare
Design/Engineering, Consulting, Testing, Commissioning, and Inspection Services of Fire Protection systems, to be fully scoped within MBTA Engineering and assigned on a Task Order basis.
The selected consultants will exhibit a depth of experience and expertise to support Testing, Commissioning, and Inspection Services of Fire Protection system to support the MBTA Project Manager for this project.
| 09/09/2024 06:00 PM UTC |
|
SUBPS14-16
General Engineering Consulting Services for Rail Vehicle Maintenance Task Order Contracts
Revenue Fleet Analysis, Non-Revenue Fleet Analysis, Facilities Plan, Revenue Fleet Overhauls, Revenue and Non-Revenue Fleet Purchasing Plans, Quality Assurance, Inspections, Testing, Audits, Project Management Assistance, Procurement Assistance and additional tasks as required.
| 08/06/2024 06:00 PM UTC |
|
Z91PS67-74
General Engineering Consulting Services for the Engineering & Capital Division
Design and Construction Phase Services for State of Good Repair Infrastructure and Facility Improvements and Modernization. The services are intended to support improvements to all MBTA assets including but not limited to: stations, tracks, roadways, signals, power infrastructure, parking facilities, storage/maintenance facilities, and office buildings.
| 08/05/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.