Massachusetts Bay Transportation Authority (MBTA) - Capital Programs Division
10 Park Plz, Boston, MA 02116-3933
(617) 222-3200
10 Park Plz, Boston, MA 02116-3933
(617) 222-3200
| Name * | Description | |
|---|---|---|
| Number | Deadline |
|---|---|
|
R16PS03 - Request For Qualification
The Alewife Garage Structural Improvements project will implement an extensive structural repairs plan to extend the garage’s service life. The plan includes both immediate and base repairs to structural and waterproofing systems. The project will include structural repairs, monthly structural inspections, and construction-phase services.
| 08/24/2026 03:00 PM UTC |
|
R27CN01 Trade RFQ
Green Line CMAR Riverside and Innerbelt Vehicle Maintenance Facility Upgrades
Riverside Trade Package 2B
The purpose of this project is to prepare the Green Line Vehicle Maintenance Facilities for the new Type 10 Light Rail Vehicles currently being procured by the MBTA. Compared to the current fleet of Type 7, 8, and 9 vehicles, the new vehicles will be longer, heavier, and have more equipment on the roof which requires maintenance. In addition, the Type 10 vehicles are expected to require more stringent wheel profile maintenance than the legacy vehicles.
Request for Qualifications for the following Trades:
Masonry Work
Miscellaneous and Ornamental Irons,
Waterproofing, Damp-proofing and Caulking
Roofing and Flashing
Resilient Floors
Painting
Plumbing
Fire Protection Sprinkler Systems
HVAC
Electrical Work
| 08/26/2026 03:00 PM UTC |
|
Y42CN01 DB RFP Technical Proposal Page
Y42CN01 DB Red Line Hi-Rail Access Tunnel Cambridge, MA
The purpose of this project is to provide a new access point to the Red Line northwest of the Charles River that will accommodate equipment, labor, and material delivery into the tunnel more efficiently. The MBTA Red Line subway northwest of the Charles River consists of a below grade tunnel with access for equipment, such as Hi-Rail vehicles, and maintenance only available just east of the Kendall/MIT station, some four miles from Alewife Station at the First Street gate. With the existing tunnel being over 25-ft below ground surface near Alewife, a tunnel is the most practical means of providing access from grade to the tunnel below for access.
| 11/19/2026 04:00 PM UTC |
| Number | Deadline |
|---|---|
|
Z91PS67-74
General Engineering Consulting Services for the Engineering & Capital Division
Design and Construction Phase Services for State of Good Repair Infrastructure and Facility Improvements and Modernization. The services are intended to support improvements to all MBTA assets including but not limited to: stations, tracks, roadways, signals, power infrastructure, parking facilities, storage/maintenance facilities, and office buildings.
| 08/05/2024 06:00 PM UTC |
You have successfully created your Digital ID. It has been installed to your browser.
We recommend that you also download a backup of your Digital ID and save it securely to an external storage location, as this file must be installed again if you intend to use a different browser or computer for bidding, document signing, and solicitation management.
Learn more about managing your Digital ID.Click Install Backup ID to use your Digital ID in this location.
If you don't have a copy of your backup ID, but you have access to the computer and browser where it was first created, you can still create a backup ID to install to this location. For help, see how to back up your Digital ID.
If you don't have access to the original computer and browser, you can create a new Digital ID below.