General Info

Business Logo

Montgomery County Engineer

451 West Third Street 8th Floor, Dayton, OH 45422
(937) 225-5402

A list of upcoming solicitations is available on the Montgomery County Engineer's website at https://engineer.mcohio.org/projects/bid-letting/.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
MCEWEN ROAD BRIDGE REHABILITATION PROJECT, WASHINGTON TOWNSHIP, MOT-TR139-0.40, PID 98683, JOB #2014-24
The purpose of the project is to rehabilitate a three lane, four span continuous reinforced concrete slab bridge over Holes Creek with minimal roadway work.
06/20/2018 05:30 PM UTC
Woodman Drive Bridge Reconstruction Project, KET-M74-0.13, City of Kettering, Job #2017-15
This rehabilitation of the Woodman Drive bridge between Wilmington Pike and E. Stroop Road work includes replacement of the superstructure, adjustments to the substructure and drainage improvements.
06/13/2018 05:30 PM UTC
WASHINGTON CHURCH ROAD BRIDGE (MOT-CR151-1.92) RECONSTRUCTION PROJECT, JOB #2015-05
Project consists of: Bridge Superstructure Replacement. Old beams to be replaced with new beams while maintaining traffic with phased construction. Remove stream channel obstruction; clearing and grubbing, and provide rock channel protection.
06/06/2018 05:30 PM UTC
Installation of Fast Dry Water Base Paint Program, Various County and Township Roads, Job #2018-40
Installation of Fast Dry Water Base Paint Program, Various County and Township Roads, Job #2018-40
04/11/2018 05:30 PM UTC
2018 Annual Paving Program
Project consists of milling and resurfacing of roadways county wide.
03/21/2018 05:30 PM UTC
County Wide Crack Seal Program Job No 2018-36
County Wide Crack Seal, Job No 2018-36
03/14/2018 05:30 PM UTC
Social Row Road (WGH)-166-9.93) & Spring Valley Pike (WHG-86-4.20) Resurfacing Project, Washington Township, Job No. 2016-29 & 2016-33
The project consists of milling and resurfacing approximately 0.87 miles of Social Row Road and 0.75 Miles of Spring Valley Pike in Washington Township to a depth of 1-1/2".
03/07/2018 06:30 PM UTC
OLD SPRINGFIELD ROAD BRIDGE REHABILITATION PROJECT, UNI-8-0.00, JOB #2015-16
The project consists of the following improvements to the bridge: 1. Removal and replacement of the existing end dams and expansion joints. 2. Removal and replacement of the existing forward abutment approach slab. 3. Correct misaligned profile at forward end of bridge. 4. Removal and replacement of the existing wearing surface including concrete deck waterproofing membrane. 5. Removal of the existing asphalt subsurface drainage system and plugging of associated thru-deck drainage pipes. 6. Patching of concrete surfaces per item 519 at right rear wingwall and at north and south bridge parapets.
02/28/2018 06:30 PM UTC
Traffic Signal Maintenance 2018-025
Annual Signal Maintenance Contract solicitation
12/20/2017 06:30 PM UTC
MOT-Keowee Street Bridge Replacement
Replace structurally deficient four lane, five span bridge constructed in 1931, with a five lane bridge including associated approach improvements to connect existing five lane roadway north and south of bridge.
09/13/2017 05:30 PM UTC
81 - 90 of 101 Solicitations
1 2 3 4 5 6 7 9 11