General Info

Business Logo

Montgomery County Engineer

451 West Third Street 8th Floor, Dayton, OH 45422
(937) 225-5402

A list of upcoming solicitations is available on the Montgomery County Engineer's website at https://engineer.mcohio.org/projects/bid-letting/.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
0 Solicitations

Closed Solicitations

Number Deadline
Snyder Rd (MOT-CR27-5.40) & Dayton-Farmersville Rd (MOT-CR44-0.79) Bridge Reconstruction Projects, Jefferson & Jackson Townships, Job #2018-13 & Job #2018-14
This project consists of the replacement of the superstructures of two bridges with prestressed concrete box beams. Minimum roadway approach work and guardrail installation is required.
03/04/2020 06:30 PM UTC
Woodman Drive Bridge Reconstruction Project, MOT-M74-0070, City of Kettering, Job #2018-09
Replace existing bridge structure with 4-sided box conduit Type A (12'x4'). Maintain traffic (2-Phase Construction). Minimal channel work.
01/22/2020 06:30 PM UTC
Dechant Road (MOT-CR140-1.10) & Wolf Creek Pike (MOT-CR230-3.45) Bridge Reconstruction Projects, Jackson & Perry Townships, Job #2018-11 & Job #2018-17
This project consists of the replacement of the superstructures of two bridges with prestressed concrete box beams. Minimum roadway approach work and guardrail installation is required.
01/22/2020 06:30 PM UTC
Asphalt Concrete Resurfacing Program, Job No 2020-06
Milling and resurfacing various roadways throughout Montgomery County, Ohio.
01/22/2020 06:30 PM UTC
Cordell Drive Bridge Reconstruction - Design Build
Design-Build Replace the existing adjacent, non-composite, box-beam superstructure on existing alignment with minimal profile adjustments.
12/04/2019 06:30 PM UTC
Traffic Signal Maintenance, Repair and Minor Construction, County Wide, Job #2020-025
Annual Signal Maintenance Contract solicitation
11/20/2019 06:30 PM UTC
MOT-SHPWB-20 Shoup Mill Road Bridge Rehabilitation
Bridge Rehabilitation
10/16/2019 05:30 PM UTC
Holes Creek Scour Project
This project consists of the restoration of Holes Creek by filling a scour hole with rip rap and correct channel bank erosion. The work length is approximately 100 feet.
07/17/2019 05:30 PM UTC
MOT-Third Street Bridge
This project consists of the replacement of the Third Street Bridge over the Great Miami River. New approach slabs, abutments and approximately 175 feet of approach road work will also be included in the project.
07/03/2019 05:30 PM UTC
Mad River Road Bridge Rehabilitation MOT-CR79-0.50
Superstructure replacement of Bridge No. MOT-CR79-0.50 over Holes Creek, including substructure repair, new approach slabs, and new guardrail.
06/05/2019 05:30 PM UTC
61 - 70 of 101 Solicitations
1 2 3 4 5 7 9 10 11