We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 53-1-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 53-2-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 18-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; ST211220209 – North 30th Street – West Atkinson Avenue to West Hampton Avenue ST211210219 – West Gertrude Drive – West Stark Street to West Grantosa Drive
04/29/2025 03:30 PM UTC
OFFICIAL NOTICE 25-1-2025
SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING N. 34th St. - W. Clybourn St. to 250’ S. of W. Clybourn St. N. 36th St. – W. Michigan St. to W. Wisconsin Ave. N. 59th St. – W. Vine St. to 460’+/- N. of W. Vine St. E. Brown St. – 140’+/- W. of N. Hubbard St. to N. Hubbard St. W. Michigan St. – N. 36th St. to 145’+/- E. of N. 39th St.
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 25-2-2025
2025 SANITARY SEWER MANHOLE INSPECTION
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
8 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 49-1-2016
CONCRETE REPLACEMENT SERVICES VARIOUS SITES MILWAUKEE, WI
04/05/2016 03:30 PM UTC
OFFICIAL NOTICE 40-1-2016
WATER MAIN RELAYS, located at the following locations: Water Main Relays – W. Thurston Ave. (WT410160638), N. 71st St. to N. 72nd St. (16 Working Days); N. 71st St. (WT410160639), W. Thurston Ave. to W. Bobolink Ave. (26 Working Days); N. 63rd St. (WT410160640), W. Bobolink Ave. to W. Florist Ave. (16 Working Days); N. 67th St. (WT410160641), W. Bobolink Ave. to W. Florist Ave. (17 Working Days); N. 65th St. (WT410160642) W. Carmen Ave. to W. Florist Ave. (32 Working Days); N. 62nd St. (410160643), W. Carmen Ave. to W. Bobolink Ave. (17 Working Days); W. Bobolink Ave. (WT410160644), N. 64th St. to N. 65th St. (11 Working Days)
04/01/2016 03:30 PM UTC
OFFICIAL NOTICE 41-1-2016
COMBINED SEWER MAINS RELAY in: E. Chicago St. – N. Milwaukee St. to N. Jackson St. N. Jefferson St. – E. Buffalo St. to E. St. Paul Ave.
03/31/2016 03:30 PM UTC
OFFICIAL NOTICE 27-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” AND 8” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (TD04284001) - W. Medford Ave. - W. Congress St. to N. 68th St. (TID-42)
03/30/2016 03:30 PM UTC
OFFICIAL NOTICE 21-1-2016
This project involves the center lock replacement at the Water Street Bascule Bridge over the Milwaukee River.
03/29/2016 03:30 PM UTC
OFFICIAL NOTICE 12-1-2016
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CRACKING AND SEATING CONCRETE PAVEMENT, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, SEWER WORK, ETC.; Located at: (ST211140107) - S. 71st St. - W. Kinnickinnic River Pkwy. to W. Cleveland Ave.
03/28/2016 03:30 PM UTC
OFFICIAL NOTICE 42-1-2016
Stump Grinding, Removal, and Site Restoration in the North District Service Area. North District Service Area: Capital Drive North to City Limits.
03/23/2016 03:30 PM UTC
OFFICIAL NOTICE 42-2-2016
Stump Grinding, Removal, and Site Restoration in the Central District Service Area. Central District Service Area: Interstate I-94 North to Capital Drive.
03/23/2016 03:30 PM UTC
OFFICIAL NOTICE 42-3-2016
Stump Grinding, Removal, and Site Restoration in the South District Service Area. South District Service Area: Interstate I-94 South to City Limits.
03/23/2016 03:30 PM UTC
OFFICIAL NOTICE 23-1-2016
CONSTRUCTION OF 7” CONCRETE PAVEMENT, 7”CONCRETE DRIVEWAY, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, CONCRETE REMOVALS, AND SEWER WORK, ETC.; Located at: (ST211120159) - N. Pierce St. - E. Center St. to E. Burleigh St.
03/22/2016 03:30 PM UTC