We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 44-1-2017
WATER MAIN RELAYS in the following locations: S. Melinda St. (WT410170655), W. Birchwood Ave. to W. Parnell Ave. (10 working days); S. 53rd St. (WT410170662), W. Wilbur Ave. to W. Howard Ave. (36 working days); S. 25th Ct. (WT410170674), W. Henry Ave. to 210’ South of W. Henry Ave. (10 working days); S. 82nd St. (WT410170676), W. Warnimont Ave. to W. Wilbur Ave. (26 working days); S. 3rd St. (WT410160685), 205’ North of W. Walker St. to W. Walker St. (17 working days); W. Walker St. (WT410160686), S. 2nd St. to S. 3rd St. (23 working days) (Note: Contractor to furnish and install approx. 3004 lin. ft. of 8” and 6” DI pipe. City to furnish miscellaneous materials as shown on plans and proposal form.).
03/06/2017 04:30 PM UTC
OFFICIAL NOTICE 12-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216170102) - Asphalt Overlays located at: S. 20th St. - W. Ramsey Ave. to W. Grange Ave., S. Layton Bld. - W. National Ave. to W. Evergreen Ln., W. Lakefield Dr. - W. Morgan Ave. to S. 35th St., W. Windlake Ave. - S. 7th St. to S. 16th St.
03/03/2017 04:30 PM UTC
OFFICIAL NOTICE 12-2-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, (ST216171102) - Asphalt Overlays located at: S. 20th St. - W. Ramsey Ave. to W. Grange Ave., S. Layton Bld. - W. National Ave. to W. Evergreen Ln., W. Lakefield Dr. - W. Morgan Ave. to S. 35th St., W. Windlake Ave. - S. 7th St. to S. 16th St.
03/03/2017 04:30 PM UTC
OFFICIAL NOTICE 35-1-2017
2017 BIO-RETENTION FACILITY MAINTENANCE - NORTH
03/02/2017 04:30 PM UTC
OFFICIAL NOTICE 35-2-2017
2017 BIO-RETENTION FACILITY MAINTENANCE - SOUTH
03/02/2017 04:30 PM UTC
OFFICIAL NOTICE 14-1-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, ETC, (ST216170104) - Asphalt Overlays located at: E. Chicago St. - N. Jackson St. to N. Milwaukee St., E. Chicago St. - N. Milwaukee St. to W. Water St., N. Harbor St. - E. Summerfest Pl. to s/o E. Chicago St., S. Kinnickinnic Ave - W. Lincoln Ave. to W. Lapham St., N. Water St. - E. Kilbourn Ave. to N. Van Buren St.
03/01/2017 04:30 PM UTC
OFFICIAL NOTICE 14-2-2017
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PAVEMENT GRINDING, EPOXY PAVEMENT MARKING, ETC, (ST216171104) - Asphalt Overlays located at: E. Chicago St. - N. Jackson St. to N. Milwaukee St., E. Chicago St. - N. Milwaukee St. to W. Water St., N. Harbor St. - E. Summerfest Pl. to s/o E. Chicago St., S. Kinnickinnic Ave - W. Lincoln Ave. to W. Lapham St., N. Water St. - E. Kilbourn Ave. to N. Van Buren St.
03/01/2017 04:30 PM UTC
OFFICIAL NOTICE 32-1-2017
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: North Forestry District: Area approximately bounded by W Capitol Drive and north City Limits.
02/28/2017 04:30 PM UTC
OFFICIAL NOTICE 32-2-2017
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: Central Forestry District: Area approximately bounded by W Capitol Drive and W I-94.
02/28/2017 04:30 PM UTC
OFFICIAL NOTICE 32-3-2017
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: South Forestry District: Area approximately bounded by W I-94 and south City Limits.
02/28/2017 04:30 PM UTC