General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 46-1-2026
Concrete Repairs and Painting of the Lower Level of MacArthur Square Parking Structure
03/25/2026 03:30 PM UTC
OFFICIAL NOTICE 3-1-2026
PROJECT NO. 1: SANITARY, STORM, AND COMBINED MAIN RELAY & SANITARY MAIN REPAIR AND LINING & MANHOLE REPAIR AND LINING IN: S. 14th St. – 170’ ± S. of W. Cleveland Ave. to 540’ ± S. of W. Cleveland Ave. S. 16th St. – W. Windlake Ave. to W. Arthur Ave. S. 34th St. – W. Forest Home Ave. to W. Montana St. N. 76th St. – 240’ ± S. of W. Winfield. Ave to W. Winfield Ave. W. Harrison Ave. – 200’ E. of S. 30th St. to S. 31st St. W. Montana Ave. – S. 33rd St. to S. 35th St. W. Orchard St. – S. 41st St. to S. 42nd St.
04/01/2026 03:30 PM UTC
OFFICIAL NOTICE 3-2-2026
SANITARY, STORM, AND COMBINED MAIN RELAY in: E. Falling Heath Pl. – 225’ ± W. of S. Swain Ct. to S. Swain Ct. W. Kilbourn Ave. – N. 35th St. to 40’ ± W. of N. 38th St. E. Ohio Ave. – S. Kinnickinnic Ave. to S. Pennsylvania Ave. S. Pennsylvania Ave. – E. Falling Heath Pl. to E. Ohio Ave. N. Weil St. – E. Auer Ave. to E. Concordia Ave.
04/01/2026 03:30 PM UTC
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
6 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 9-1-2025
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTHIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216250104 – Official Notice No. 9-1-2025 The “High Impact” asphalt paving project locations are as follows: North 19th Place – West Glendale Avenue to West Hampton Avenue North 19th Street - West Hampton Avenue to West Eggert Place North 26th Street - West Galena Street to West Lisbon Avenue North 31st Street - West Lisbon Avenue to West North Avenue North Bartlett Avenue - East Kane Place to East North Avenue North Blaine Place - West Center Street to West Lisbon Avenue West Concordia Avenue - North 15th Street to North Teutonia Avenue West Congress Street - North Green Bay Avenue to West Roosevelt Drive West Courtland Avenue - North Green Bay Avenue to North Parkway Avenue East Lafayette Place - North Prospect Avenue to North Bartlett Avenue East Locust Street - North Humboldt Boulevard to North Holton Street West Locust Street - North 20th Street to North 29th Street North Newhall Street - East Belleview Place to East Park Place North Richards Street - East Capitol Drive to 1100' +/- n/o East Hope Avenue West Sheridan Avenue - North Teutonia Avenue to North 38th Street North Terrace Avenue - East Belleview Place to North Wahl Avenue West Vienna Avenue - North 1st Street to North Port Washington Avenue East Windsor Place - North Lake Drive to North Summit Avenue East Woodstock Place – North Terrace Avenue to North Prospect Avenue
04/15/2025 03:30 PM UTC
OFFICIAL NOTICE 37-1-2025
The project is located at City of Milwaukee Safety Academy and the project is the upper roof section. The project consists 4 roof sections and work includes the removal of the ballasted EPDM/Adhered EPDM roof systems down to the structural decking. Repair and replace existing decking as needed. The contractor will install a new Adhered EPDM roof system with minor alterations, details to include new metal edge details, new expansion joint caps, and a new perimeter guardrail system. A new manufacturer warranty and installer warranty is required by the owner.
04/09/2025 03:30 PM UTC
OFFICIAL NOTICE 8-1-2025
CONSTRUCTION OF VARIABLE THICKNESS ASPHALTHIC CONCRETE PAVEMENT, PAVEMENT GRINDING, PLASTIC PAVEMENT MARKING, MANHOLE\INLET ADJUSTMENTS, CUC ADJUSTMENTS, ETC.; Located at: ST216250103 – Official Notice No. 8-1-2025 The “High Impact” asphalt paving project locations are as follows: North 50th Street - A point south of West Rohr Avenue to West Custer Avenue North 67th Street - West Fond Du Lac Avenue to West Villard Avenue North 69th Street - West Silver Spring Drive to West Florist Avenue North 77th Street - West Lisbon Avenue to West Townsend Street North 78th Street - West Keefe Avenue to West Vienna Avenue North 79th Street - West Lisbon Avenue to West Keefe Avenue North 79th Street - West Melvina Street to West Capitol Drive North 86th Street - West Hadley Street to West Chambers Street North 87th Street - West Olive Street to West Congress Street North 88th Street - West Chambers Street to West Burleigh Street North 90th Boulevard - West Helena Street to West Good Hope Road North 97th Place - North 97th Street to West Keefe Avenue North 99th Street - West Vienna Avenue to West Metcalf Place West Arch Avenue – North 95th Street to point west of North 97th Street West Cheyenne Court - East of North 91st Street to North 91st Street West Locust Street - North 72nd Street to North 76th Street West Nash Street - West Appleton Avenue to North 76th Street West Parkland Court -A point east of North 73rd Street to North 73rd Street West Parkland Court - North 81st Street to A point west of North 81st Street West Rochelle Avenue - West Helena Street to North 91st Street West Sheridan Avenue – North 76th Street to West Leon Trail West Villa Avenue - North Joseph Avenue to North 107th Street Intersection of North 91st Street and West Bradley Road Intersection of West Fairy Chasm Drive and West Burbank Avenue
04/08/2025 03:30 PM UTC
OFFICIAL NOTICE 47-1-2025
SANITARY SEWER LATERAL AND LEAD SERVICE LINE REPLACEMENT IN THE CITY OF MILWAUKEE
04/07/2025 03:30 PM UTC
OFFICIAL NOTICE 24-1-2025
SANITARY, STORM, AND COMBINED SEWER MAIN RELAY AND NEW STORM SEWER S. 4th St. - W. Holt Ave. to 100’ +/- S. of W. Morgan Ave. S. 5th St. – W. Waterford Ave. to W. Plainfield Ave. W. Townsend St. – N. 1st St. to 280’ +/- W. of N. 1st St. E. Vienna Ave. – N. Humboldt Blvd. to 550’ +/- E. of Humboldt Blvd. W. Waterford Ave. – 190’ E. of S. 5th St. to S. 5th St.
03/28/2025 03:30 PM UTC
OFFICIAL NOTICE 46-1-2025
200 LEAD SERVICE LINE REPLACEMENTS
03/17/2025 03:30 PM UTC
OFFICIAL NOTICE 38-1-2025
City of Milwaukee, Department of Public Works, Central Repair Garage – RTU-3 Replacement (Men’s Locker Room) located at 2142 West Canal Street, Milwaukee, Wisconsin 53233
03/12/2025 03:30 PM UTC
OFFICIAL NOTICE 40-1-2025
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 1: Approximately N 43rd St to the east City limits, and Center St north to Congress St.
03/11/2025 03:30 PM UTC
OFFICIAL NOTICE 40-2-2025
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 2: Approximately N 68th St to the east City limits, and Walnut St north to Burleigh St.
03/11/2025 03:30 PM UTC
OFFICIAL NOTICE 40-3-2025
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 3: West City limits to east city limits, and approximately Dickinson St north to North Ave.
03/11/2025 03:30 PM UTC
111 - 120 of 1550 Solicitations
1 2 8 9 10 12 14 15 16 154 155