General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 19-1-2025
CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” AND 9” CONCRETE PAVEMENTS, CONCRETE TRAFFIC ISLAND, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, CONCRETE CURB PEDESTRIAN, 5” and 7” CONCRETE WALKS, DETECTABLE WARNING FIELD, PAVEMENT SAWING, VARIOUS PAVEMENT MARKINGS, GRAVEL FILLING, CONCRETE REMOVALS, SODDING AND TOPSOIL, ENGINEERING SOIL, SEWER WORK, WATER WORK, ETC
07/08/2025 03:30 PM UTC
OFFICIAL NOTICE 60-1-2025
CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.
07/16/2025 03:30 PM UTC
OFFICIAL NOTICE 73-1-2025
Milwaukee Police Department District 3 & Communications Operation Center – Boiler Replacement
08/04/2025 03:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 11-1-2024
The general work requested is: CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE, 6” CONCRETE BASE, CONCRETE TRAFIC ISLANDS, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT, HANDICAP CONCRETE ADA RAMPS PER ADA REQUIREMENTS, CONSTRUCTION STAKING OF ADA RAMPS, DETECTABLE WARNING FIELDS, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS AND CRACKS, GRAVEL FILLING, INSTALLATION OF CONDUIT AND OTHER APPURTENANCE UNDERGROUND WORK CONCRETE REMOVALS, PAVEMENT MARKINGS, SIGNAGE INSTALLATION, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, CUC ADJUSTMENTS, ETC.; Located at: ST216210110 – West Washington Street - South 1st Street to South 20th Street; West Scott Street – South 20th Street to South Layton Boulevard ST320181201 – West Washington Street - South 1st Street to South 20th Street; West Scott Street – South 20th Street to South Layton Boulevard
06/05/2024 03:30 PM UTC
OFFICIAL NOTICE 63-1-2024
Traffic Deck Recoating and Repairs at 1000 North Water Street Parking Structure
06/04/2024 03:30 PM UTC
OFFICIAL NOTICE 58-1-2024
WATER MAIN RELAYS, at the following locations: N. 9th St. (WT410220629), W. Vliet St. to W. Somers St. (3 working days); W. Oklahoma Av. (N/S) (WT410220639), S. 70th St. (Ext’d) to S. 72nd St. (12 working days); S. 72nd St. (WT410220640), W. Bennett Av. to W. Oklahoma Av. (7 working days); E. Clarke St. (WT410220649), N. 1st St. to N. Hubbard St. (25 working days); W. Glendale Av. (WT410220654), N. 30th St. to N. 32nd St. (14 working days); N. 31st St. (WT410220655), W. Atkinson Av. to W. Glendale Av. (10 working days); W. Cherry St. (WT410220663), N. 12th St. to N. 13th St. (8 working days); N. 12th St. (WT410220664), W. Vliet St. to 215’ N/O W. Cherry St. (16 working days); N. 13th St. (WT410220665), W. Kneeland St. to W. Cherry St. (6 working days); W. Kneeland St. (WT410220666), N. 13th St. to N. 14th St. (13 working days); N. 54th St./W. Maxwell Pl. (WT410220672), W. Capitol Dr. to W. Fond Du Lac Av. (21 working days); W. Morgan Av. (WT410220685), S. 84th St. to S. 92nd St. (60 working days); S. 91st St. (WT410220686), 105’ N/O W. Morgan Av. to W. Morgan Av. (5 working days); W. Whitaker Av. (WT410230641), W. Bottsford Av. to S. 27th St. (20 working days). (Note: Contractor to furnish and install approximately 9,807 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/03/2024 03:30 PM UTC
OFFICIAL NOTICE 64-1-2024
Bridge Centerlock Maintenance at Multiple Locations
05/30/2024 03:30 PM UTC
OFFICIAL NOTICE 70-1-2024
200 Lead Service Line Replacements
05/28/2024 03:30 PM UTC
OFFICIAL NOTICE 67-1-2024
200 Lead Service Line Replacement - Equity Prioritization Program
05/23/2024 03:30 PM UTC
OFFICIAL NOTICE 9-1-2024
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, PAVEMENT GRINDING, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” AND 7” CONCRETE WALKS, PAVEMENT GRINDING, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, CUC ADJUSTMENTS, ETC.; ST211220229 – East Montana Street – from South Quincy Avenue to South Howell Avenue
05/16/2024 03:30 PM UTC
OFFICIAL NOTICE 34-1-2024
PROJECT NO. 1: SANITARY BYPASS PUMP REHABILITATION Located at: Various Locations
05/09/2024 03:30 PM UTC
OFFICIAL NOTICE 59-1-2024
The project generally consists of providing the replacement of seven (7) Automatic Transfer Switches (ATS) with PLC controllers and Master Generator Synchronous Controller. The intent is to replace the rollout switch assembly and controller, keeping the cabinet and manual bypass intact. Building shall remain operational throughout project.
05/08/2024 03:30 PM UTC
OFFICIAL NOTICE 65-1-2024
350 LEAD SERVICE LINE REPLACEMENTS - EQUITY PRIORITIZATION PROGRAM
05/03/2024 03:30 PM UTC
131 - 140 of 1483 Solicitations
1 2 10 11 12 14 16 17 18 148 149