General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 105-1-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 19th St. (WT410230614), W. Fairmount Av. To W. Eggert Pl. (22 working days); W. Eggert Pl. (WT410230615), N. 19th St. to N. 19th Pl. (9 working days); N. 19th Pl. (WT410230616), W. Fairmount Av. to W. Eggert Pl. (23 working days); N. 19th St. (WT410230617), W. Eggert Pl. to W. Villard Av. (8 working days); W. Cornell St. (WT410230640) N. 20th St. to N. Teutonia Av. (42 working days); W. Linwal La. (WT410230656) N. 22nd St. to N. 24th St. (11 working days); N. 22nd St. (WT410230657) W. Hampton Av. to W. Linwal La. (9 working days); W. Stark St. (WT410230658) N> 20th St. to N. 24th St. (12 working days); W. Custer Av. (WT410230669) N. 20th St. to 100’ W/O N. Long Island Dr. (6 working days); N. 20th St. (WT410230670) W. Custer Av. to W. Neil Pl. (9 working days); W. Neil Pl. (WT410230671) N. 20th St. to 215’ NW/O N. Long Island Dr. (21 working days); W. Pierce St. (WT410250608) S. 6th St. to S. 9th St. (43 working days); N. 51st St. (WT410250754) W. Center St. to W. Burleigh St. (4 working days); N. 60th St. (WT410250756) at W. Burleigh St. (3 working days). (Note: Contractor to furnish and install approximately 9,950 lin. ft. of 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 105-2-2025
WATER MAIN RELAYS/ ALTERATIONS & LEAD SERVICE LINE REPLACEMENTS, at the following locations: N. 68th St. (WT410230642), W. Grantosa Dr. to 425’ S/O W. Grantosa Dr. (9 working days); W. Herbert Av. (WT410230643), W. Tallmadge Pl. to N. 74th St. (12 working days); W. Tallmadge Pl. (WT410230644), W. Grantosa Dr. to W. Custer Av. (8 working days); W. Locust St. (WT410230645), N. 50th St. to N. 57th St. (48 working days); N. 94th St. (WT410230666), W. Center St. to 400’ NE/O W. Center St. (8 working days); W. Hadley St. (WT410230667), 320’ W/O N. 92nd St. to N. Colonial Dr. (19 working days); N. 95th St./W. Lorraine Pl./N. 97th St. (WT410230668), W. Center St. to W. Center St. (25 working days); S. Griffin Av. (WT410230696), E. Plainfield Av. to 350’ S/O E. Plainfield Av. (8 working days); S. Adams Av. (WT410230697), E. Plainfield Av. to 300’ S/O E. Plainfield Av. (9 working days); W. Appleton Av. (WT410240735), W. Hampton Av. (2 working days); N. 76th St. (WT410250601), W. Bobolink Av. to 120’ N/O W. Florist Av. (13 working days); W. Florist Av. (WT410250602), N. 76th St. to N. 77th St. (9 working days); N. 76th St. (WT410250751) W. Northridge Lakes Blvd. (3 working days); W. Becher St. (WT410250755) S. 4th St. (NEC) (2 working days) (Note: Contractor to furnish and install approximately 8,824 lin. ft. of 12”, 8”, 6”, and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
12/19/2025 04:30 PM UTC
OFFICIAL NOTICE 75-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9 CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SPEED HUMPS, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: ST211220262 – In N. 39th St./N. Sercombe Rd. – W. Hope Ave. to W. Marion St.
01/06/2026 04:30 PM UTC
3 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 22-2-2024
COMBINED SEWER MAIN RELAY & COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: W. Harrison Ave. – 190' +/- E. of S. 3rd St. to 150’ +/- W. of S. 3rd St. S. 3rd St. – S. Chase Ave. to 465'+/- S. of W. Harrison Ave. S. 5th Pl. – W. Arthur Ave. to W. Harrison Ave. S. 7th St –W. Harrison Ave. to W. Cleveland Ave. S. 8th St. – W. Dakota St. to W. Manitoba St.
09/11/2024 03:30 PM UTC
OFFICIAL NOTICE 22-3-2024
PROJECT NO.3: COMBINED SEWER MAIN RELAY, REPAIR, PIPE BURSTING, COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: N. 2nd St. – W. Concordia Ave. to W. Keefe Ave. N. Bremen St. – E. Garfield Ave. to E. North Ave. W. Garfield Ave. – N. 2nd St. to N. Dr. Martin Luther King Jr. Dr. E. Garfield Ave. – N. Bremen St. to N. Weil St. N. Gordon Pl/Ct. – E. Wright St. to E. Clarke St. W. Randolph St. – N. 2nd St. to N. 3rd St.
09/11/2024 03:30 PM UTC
OFFICIAL NOTICE 88-1-2024
SOUTHSIDE HEALTH CENTER ADA COMPLIANCE PROGRAM
09/10/2024 03:30 PM UTC
OFFICIAL NOTICE 79-1-2024
Project Description: Construction of pedestrian crossing islands, curb extensions, bus bulbs, crosswalk markings, lane striping, protected bike lanes, and signage on West Oklahoma Avenue The general work requested is: CONSTRUCTION OF, CONCRETE TRAFFIC ISLANDS, CONCRETE MEDIANS, 7” CONCRETE PAVEMENT, DETECTABLE WARNING FIELD, VARIOURS TRAFFIC PAVEMENT MARKINGS, VARIOURS TRAFFIC SIGNAGE ASSEMBLY/INSTALLATIONS, CONCRETE PAVEMENT REMOVALS, VARIOURS PAVEMENT MARKING REMOVALS, ETC.; Located at: ST320210110 – In West Oklahoma Avenue from South 6th Street to South 27th Street (Wisconsin Department of Transportation ID No. 2400-07-71)
09/09/2024 03:30 PM UTC
OFFICIAL NOTICE 101-1-2024
The general work requested is: CRACKFILL ASPHALT AND CONCRETE STREET PAVEMENTS WITH A HOT-APPLIED ASPHALT BASED PRODUCT USED TO SEAL AND FILL CRACKS AND JOINTS. ADDITIONAL WORK INVOLVING THE FILLING OF SMALL HOLES, JOINT FAILURES, EXPOSURE OF WIRE MESH AND OTHER MINOR SURFACE DEFECTS USING HOT-APPLIED ASPHALT BASED PRODUCT AND PEA GRAVEL WILL BE REQUIRED ON ALL PAVEMENTS. ETC.; LOCATED AT: ST211220102/ST211230102 - Crackfilling on Various Streets Locations City Wide
09/06/2024 03:30 PM UTC
OFFICIAL NOTICE 100-1-2024
The general work requested is: SEALCOAT ASPHALTIC BITUMINOUS PAVEMENTS USING A SLURRY SEAL, BITUMINOUS /AGGREATE MIX. SEALCOATING WILL INCLUDE SURFACE CLEANING/SWEEPING OF PAVEMENT WITH MECHANICAL SWEEPERS, INSTALL/REMOVE PROTECTIVE COVER OVER, WATER BOXES, INLETS GRATES AND MANHOLE COVERS, ETC.; Located at: ST211220101/ST211230101 - Sealcoating Paving @ Various Streets Locations City Wide
09/05/2024 03:30 PM UTC
OFFICIAL NOTICE 77-1-2024
The general work requested is: REMOVAL AND CONSTRUCTION OF: 5 INCH CONCRETE WALKS, 7 INCH CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, SAWING AND SODDING & TOPSOIL, GRAVEL FILLING, OTHER CONCRETE REMOVALS, ETC.; Located at: ST230240102 - Scattered Sites Sidewalk Replacements at Various Locations City Wide
09/04/2024 03:30 PM UTC
OFFICIAL NOTICE 99-1-2024
Poured-In-Place Resilient Cork Surface Installation – Various MKE Parks Locations Located at: 29th & Melvina (3840 N 29th Street, Milwaukee, WI 53216) Al Jarreau Park (2929 N 30th Street, Milwaukee, WI 53210) 26th & Medford (2478 N 26th Street, Milwaukee, WI 53206)
08/29/2024 03:30 PM UTC
OFFICIAL NOTICE 95-1-2024
Roof Replacement at MFD, Engine House #39, 8025 West Bradley Road, Milwaukee, Wisconsin 53233.
08/28/2024 03:30 PM UTC
OFFICIAL NOTICE 76-1-2024
The general work requested is: CONSTRUCTION OF 5” CONCRETE WALK, CONCRETE WALK WITH INTEGRAL CURB, 7” CONCRETE DRIVEWAY, HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, CONCRETE CURB AND GUTTER, 7” HIGH EARLY STRENGHT CONCRETE DRIVEWAY, 8” CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, GRAVEL FILING, DETECTABLE WARNING FIELDS, MANHOLE/INLET ADJUSTMENTS, AND SODDING & TOPSOIL , OTHER REMOVALS, INSTALLATION OF CONDUIT AND OTHER APPURTENANCE UNDERGROUND WORK ETC.; Located at: ST230240101 - Areawide Sidewalk Replacement in the Area Bounded By (ABB): ABB: S. 20th St., W. Oklahoma Ave., S. 35th St and the KK River ABB: N. Hi Mount Blvd., W. Vine St., N. 55th St. and W Lloyd St. Schools Located @ 6215 W. Warnimont Ave. (Hamilton H.S.) & 6701 W. Eden Pl. (Honey Creek Elem. Sch.) ST216240110 - ADA Ramps for 2024 & Areawide Sidewalk Replacement Project
08/27/2024 03:30 PM UTC
141 - 150 of 1521 Solicitations
1 2 11 12 13 15 17 18 19 152 153