General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 11-1-2024
The general work requested is: CONSTRUCTION OF, 7” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE, 6” CONCRETE BASE, CONCRETE TRAFIC ISLANDS, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT, HANDICAP CONCRETE ADA RAMPS PER ADA REQUIREMENTS, CONSTRUCTION STAKING OF ADA RAMPS, DETECTABLE WARNING FIELDS, PAVEMENT GRINDING, SEALING PAVEMENT JOINTS AND CRACKS, GRAVEL FILLING, INSTALLATION OF CONDUIT AND OTHER APPURTENANCE UNDERGROUND WORK CONCRETE REMOVALS, PAVEMENT MARKINGS, SIGNAGE INSTALLATION, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, CUC ADJUSTMENTS, ETC.; Located at: ST216210110 – West Washington Street - South 1st Street to South 20th Street; West Scott Street – South 20th Street to South Layton Boulevard ST320181201 – West Washington Street - South 1st Street to South 20th Street; West Scott Street – South 20th Street to South Layton Boulevard
06/05/2024 03:30 PM UTC
OFFICIAL NOTICE 63-1-2024
Traffic Deck Recoating and Repairs at 1000 North Water Street Parking Structure
06/04/2024 03:30 PM UTC
OFFICIAL NOTICE 58-1-2024
WATER MAIN RELAYS, at the following locations: N. 9th St. (WT410220629), W. Vliet St. to W. Somers St. (3 working days); W. Oklahoma Av. (N/S) (WT410220639), S. 70th St. (Ext’d) to S. 72nd St. (12 working days); S. 72nd St. (WT410220640), W. Bennett Av. to W. Oklahoma Av. (7 working days); E. Clarke St. (WT410220649), N. 1st St. to N. Hubbard St. (25 working days); W. Glendale Av. (WT410220654), N. 30th St. to N. 32nd St. (14 working days); N. 31st St. (WT410220655), W. Atkinson Av. to W. Glendale Av. (10 working days); W. Cherry St. (WT410220663), N. 12th St. to N. 13th St. (8 working days); N. 12th St. (WT410220664), W. Vliet St. to 215’ N/O W. Cherry St. (16 working days); N. 13th St. (WT410220665), W. Kneeland St. to W. Cherry St. (6 working days); W. Kneeland St. (WT410220666), N. 13th St. to N. 14th St. (13 working days); N. 54th St./W. Maxwell Pl. (WT410220672), W. Capitol Dr. to W. Fond Du Lac Av. (21 working days); W. Morgan Av. (WT410220685), S. 84th St. to S. 92nd St. (60 working days); S. 91st St. (WT410220686), 105’ N/O W. Morgan Av. to W. Morgan Av. (5 working days); W. Whitaker Av. (WT410230641), W. Bottsford Av. to S. 27th St. (20 working days). (Note: Contractor to furnish and install approximately 9,807 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
06/03/2024 03:30 PM UTC
OFFICIAL NOTICE 64-1-2024
Bridge Centerlock Maintenance at Multiple Locations
05/30/2024 03:30 PM UTC
OFFICIAL NOTICE 70-1-2024
200 Lead Service Line Replacements
05/28/2024 03:30 PM UTC
OFFICIAL NOTICE 67-1-2024
200 Lead Service Line Replacement - Equity Prioritization Program
05/23/2024 03:30 PM UTC
OFFICIAL NOTICE 9-1-2024
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, PAVEMENT GRINDING, 7” AND 8” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” AND 7” CONCRETE WALKS, PAVEMENT GRINDING, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, CUC ADJUSTMENTS, ETC.; ST211220229 – East Montana Street – from South Quincy Avenue to South Howell Avenue
05/16/2024 03:30 PM UTC
OFFICIAL NOTICE 34-1-2024
PROJECT NO. 1: SANITARY BYPASS PUMP REHABILITATION Located at: Various Locations
05/09/2024 03:30 PM UTC
OFFICIAL NOTICE 59-1-2024
The project generally consists of providing the replacement of seven (7) Automatic Transfer Switches (ATS) with PLC controllers and Master Generator Synchronous Controller. The intent is to replace the rollout switch assembly and controller, keeping the cabinet and manual bypass intact. Building shall remain operational throughout project.
05/08/2024 03:30 PM UTC
OFFICIAL NOTICE 65-1-2024
350 LEAD SERVICE LINE REPLACEMENTS - EQUITY PRIORITIZATION PROGRAM
05/03/2024 03:30 PM UTC
201 - 210 of 1553 Solicitations