We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 17-1-2024
PROJECT NO. 1: SANITARY, STORM AND COMBINED SEWER MAIN RELAY & STORM AND COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING IN: Located at: N. 21st St.– W. Colfax Pl. to W. Eggert Pl. N. 22nd St.– 80' +/- South of W. Colfax Pl. to W. Villard Ave. N. 24th Pl.– W. Meinecke Ave. to W. Medford Ave. N. 51st Blvd.– 300' +/- South of W. Capitol Dr. to W. Capitol Dr. W. Cherry St.– N. 12th St. to N. 13th St. W. Colfax Pl.– N. 21st St. to N. 22nd St. W. Eggert Pl.– N. 21st St. to N. 22nd St. W. Melvina St.– N. 51st Blvd. to 140' +/- W. of N. 51st Blvd.
03/28/2024 03:30 PM UTC
Official Notice 24-1-2024
HARBOR DISTRICT RIVERWALK - Phase 1 North
03/27/2024 03:30 PM UTC
OFFICIAL NOTICE 2-1-2024
CONSTRUCTION OF HANDICAP CONCRETE ADA RAMPS PER ADA REQUIREMENTS, CONSTRUCTION STAKING OF ADA RAMPS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 7” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, SEWER WORK, INSTALLATION OF CONDUIT AND OTHER APPURTENANCE UNDERGROUND WORK, ETC.; Located at: ST216230108 – ADA RAMPS FOR 2024 HIGH IMPACT PAVING @ VARIOUS LOCATIONS (SOUTHSIDE PROJECTS) The scope of work is to remove and replace all of the pedestrian ADA Ramps within the limits of each of the City of Milwaukee “High Impact” asphalt paving projects. The “High Impact” asphalt paving projects locations are as follows: O.N. 27-1-2024 S. 44th St. - W. Kinnickinnic River Pkwy to W. Arthur Ct. (including W. Arthur Ct.) S. 50th St. - W. Ohio Ave. to Cul-de-Sac S. 97th St. - W. Beloit Rd. to W. Oklahoma Ave. W. Ohio Ave. - S. 50th St. to S. 51st St. W. Orchard St. - S. 12th St. to S. Cesar E. Chavez Dr. W. Pabst Ave. - S. 33rd St. to S. 35th St. E./W. Waterford Ave. - S. Whitnall Ave. to a point west of S. 3rd St. O.N. 28-1-2024 W. Clybourn St. - N. 27th St. to N. 35th St. E. Dakota St. - S. California St. to S. Pine Ave. S. Delaware Ave. - E. Estes St. to E. Iron St. S. Ellen St. – E. Holt Ave. to E. Ohio Ave W. Michigan St. - N. 27th St. to N. 35th St. S. Pennsylvania Ave. – S. Kinnickinnic Ave. to E. Ohio Ave.
03/21/2024 03:30 PM UTC
OFFICIAL NOTICE 1-1-2024
CONSTRUCTION OF HANDICAP CONCRETE ADA RAMPS PER ADA REQUIREMENTS, CONSTRUCTION STAKING OF ADA RAMPS, DETECTABLE WARNING FIELD, 5” CONCRETE WALKS, CONCRETE WALK AND/OR DRIVEWAY, CONCRETE CURB AND GUTTER, 7” CONCRETE PAVEMENT VARIABLE THICKNESS CONCRETE BASE, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIOUS CONCRETE REMOVALS, SEWER WORK, INSTALLATION OF CONDUIT AND OTHER APPURTENANCE UNDERGROUND WORK, ETC.; Located at: ST216230107 – ADA RAMPS FOR 2024 HIGH IMPACT PAVING @ VARIOUS LOCATIONS (NORTHSIDE PROJECTS) The scope of work is to remove and replace all of the pedestrian ADA Ramps within the limits of each of the City of Milwaukee “High Impact” asphalt paving projects. The “High Impact” asphalt paving projects locations are as follows: O.N. 25-1-2024 N. 7th St. – W. Locust St. to W. Atkinson Ave. N. 37th St. – W. Congress St. to N. Hopkins St. N. 39th St. – W. Chambers St. to W. Burleigh St. N. 44th St. – W. Locust St. to W. Burleigh St. W. Douglas Ave. – N. 35th St. to N. Sherman Blvd. W. Galena St. – N. 13th St. to N. 17th St. W. Martin Dr. – W. Highland Blvd. to N. 46th St. W. Roosevelt Dr. – W. Atkinson Ave. to N. 27th St. W. Stevenson St. – N. 76th St. to N. 80th St. O.N. 26-1-2024 N. 72nd St. – W. Capitol Dr. to W. Congress St. N. 73rd St. – W. Nash St. to W. Potomac Ave. N./S. 76th St. – W. O’Connor St. to W. Bluemound Rd. N. 80th St. – W. Vienna Ave. to W. Capitol Dr. N. 90th Ct./St. – A Point South of W. Marion St. to W. Congress St. N. 90th St. – W. Capitol Dr. to a pt. North of W. Fiebrantz Ave. N. 91st St. – W. Capitol Dr. to W. Congress St. W. Congress St./W. Sharon La. – N. 100th St. to N. 104th St. (incl. N. 103rd St.) W. Herbert Ave. – W. Kathryn Ave. to N. 84th St. W. Langlade St. – N. 95th St. to N. Denmark St. W. Nash St. – N. 35th St. to N. Sherman Blvd. W. Potomac Ave. – W. Nash St. to N. 74th St. N. 95th St. – W. Langlade St. to W. Rio St. N. 98th Ct. – A Point south of W. Langlade St. to W. Langlade St. O.N 29-1-2024 N. 107th St. – W. Good Hope Rd. to W. Bradley Rd. N. 115th St. – W. Florist Ave. to a point North of W. Kaul Ave.
03/20/2024 03:30 PM UTC
OFFICIAL NOTICE 54-1-2024
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: North Forestry District: Area approximately bounded by W Center St. to W Hampton Av. from N Sherman Av to West City Limits and W Congress St to W Hampton Av. from N Sherman Av. to East City Limits
03/18/2024 03:30 PM UTC
OFFICIAL NOTICE 55-1-2024
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: CITY-OWNED LOT AREA 2: AREA BOUNDED BY NORTH AVENUE, WEST CITY LIMIT, CAPITOL DRIVE, AND NORTH 27TH STREET.
03/15/2024 03:30 PM UTC
OFFICIAL NOTICE 55-2-2024
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: CITY-OWNED LOT AREA 5 - AREA BOUNDED BY NORTH AVENUE, NORTH 13TH ST, CAPITOL DRIVE, AND INTERSTATE 43
03/15/2024 03:30 PM UTC
OFFICIAL NOTICE 49-1-2024
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: CITY-OWNED LOT AREA 1B, BOUNDED BY: CAPITOL DRIVE TO NORTH CITY LIMITS AND SHERMAN BOULEVARD TO EAST CITY LIMITS
03/05/2024 04:30 PM UTC
OFFICIAL NOTICE 49-2-2024
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: CITY-OWNED LOT AREA 2: AREA BOUNDED BY NORTH AVENUE, WEST CITY LIMIT, CAPITOL DRIVE, AND NORTH 27TH STREET.
03/05/2024 04:30 PM UTC
OFFICIAL NOTICE 49-3-2024
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: CITY-OWNED LOT AREA 5 - AREA BOUNDED BY NORTH AVENUE, NORTH 13TH ST, CAPITOL DRIVE, AND INTERSTATE 43
03/05/2024 04:30 PM UTC
231 - 240 of 1553 Solicitations