General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 75-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 9 CONCRETE PAVEMENT, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SPEED HUMPS, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC.; Located At: ST211220262 – In N. 39th St./N. Sercombe Rd. – W. Hope Ave. to W. Marion St.
01/06/2026 04:30 PM UTC
1 Solicitation

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 43-1-2024
Former Northridge Mall Fence Replacement Project
02/14/2024 04:30 PM UTC
OFFICIAL NOTICE 37-1-2024
Remote Bridge Upgrades at Multiple Locations
02/13/2024 04:30 PM UTC
OFFICIAL NOTICE 32-1-2024
2024 SANITARY BYPASS PUMP & SANITARY LIFT STATION INSPECTION AND BYPASS PUMP WET TESTING
02/02/2024 04:30 PM UTC
OFFICIAL NOTICE 31-1-2024
200 Lead Service Line Replacements prior to Paving
02/01/2024 04:30 PM UTC
OFFICIAL NOTICE 14-1-2024
Former Northridge Mall Fence Replacement Project
01/30/2024 04:30 PM UTC
OFFICIAL NOTICE 6-1-2024
WATER MAIN RELAYS & HYDRANT ALTERATIONS, at the following locations: North 52nd St. (WT410180623), W. Custer Av. to W. Silver Spring Dr. (24 working days); W. Sheridan Av. (WT410220615), N. 51st Blvd. to N. 57th St. (31 working days); N. 87th St. (WT410220630), W. Villard Av. to W. Lawn Av. (14 working days); N. 90th St. (WT410220631), W. Villard Av. to W. Rohr Av. (12 working days); N. 75th St. (WT410220661), 350’ S/O N. 75th Ct. to W. Talmadge Pl. (12 working days); N. 75th Ct. (WT410220662), N. 75th St. to 135’ W/O N. 75th St. (5 working days); N. Dousman St. (WT410230605), E. Meinecke Av. to E. Clarke St. (79 working days); E. Potter Av. (WT410230606), E. Russell Av. to S. Kinnickinnic Av. (64 working days); E. Falling Heath Pl. (WT410230618), S. Kinnickinnic Av. to S. Pennsylvania Av. (19 working days); E. Linus St. (WT410230698), S. Kinnickinnic Av. to S. Logan Av. (67 working days); E. Howard Av. (WT410230753), S. Lennox St. (3 working days); W. Forest Home Av. (WT410230754), 184’ SW/O W. Kelly Pl. (3 working days); E. Wells St. (WT410230755), N. Broadway to N. Van Buren St. (3 working days) (Note: Contractor to furnish and install approximately 11,030 lin. ft. of 16”, 12”, 8”, 6” and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/29/2024 04:30 PM UTC
OFFICIAL NOTICE 5-1-2024
WATER MAIN RELAYS, at the following locations: N. 100th St. (WT410220600), W. Capitol Dr. to W. Grantosa Dr. (26 working days); W. Grantosa Dr. (WT410220614), 225’ E/O N. 100th St. to N. 100th St. (6 working days); N. Burbank Av (WT410220621), W. Casper St. to W Green Tree Rd. (10 working days); N. 84th St. (WT410220622), W. Mill Rd. to N. Burbank Av. (51 working days); W. Acacia St. (WT410220623), N. 77th St. to N. 80th St. (19 working days); N. 78th St. (WT410220624), W. Acacia St. to W. Casper St. (21 working days); W. Casper St. (WT410220625), N. 77th St. to N. 78th St. (7 working days); N. 100th St. (WT410220651), W. Nash St. to W. Lisbon Av. (44 working days); N. 98th St. (WT410220652), W. Metcalf Pl. to W. Lisbon Av. (8 working days); N. 85th St. (WT410220673), W. Capitol Dr. to W. Olive St. (26 working days); W. Olive St. (WT410220674), N. 85th St. to N. 88th St. (18 working days); N. 88th St. (WT410220675), N. Colgate Cr. to W. Marion St. (16 working days); N. 83rd St. (WT410220676), W. Capitol Dr. to W. Hope Av. (25 working days); W. Fiebrantz Av. (WT410220677), N. 82nd St. to N. 84th St. (11 working days); N. 20th St. (WT410230001), W. North Av. to N. Hopkins St. (10 working days); . (Note: Contractor to furnish and install approximately 14575 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/25/2024 04:30 PM UTC
OFFICIAL NOTICE 4-1-2024
200 Lead Service Line Replacements
01/25/2024 04:30 PM UTC
OFFICIAL NOTICE 92-1-2023
HT-22 HAWLEY TANK PAINTING EXTERIOR AND INTERIOR PAINTING OF THE 2MG ELEVATED, POTABLE WATER STORAGE TANK
01/24/2024 04:30 PM UTC
OFFICIAL NOTICE 94-1-2023
Remote Bridge Upgrades at Multiple Locations
01/23/2024 04:30 PM UTC
231 - 240 of 1523 Solicitations
1 2 20 21 22 24 26 27 28 152 153