General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 29-1-2026
SOUTH 16TH STREET BRIDGE OVER KINNICKINNIC RIVER REPAIRS.
02/24/2026 04:30 PM UTC
OFFICIAL NOTICE 30-1-2026
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE CITY-OWNED LOT AREA 4. MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: NORTH AVENUE, NORTH 20TH ST, CAPITOL DRIVE, AND NORTH 13TH ST.
02/25/2026 04:30 PM UTC
OFFICIAL NOTICE 30-2-2026
MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE CITY-OWNED LOT AREA 10. MOWING AND SNOW AND ICE REMOVAL SERVICES ON PROPERTIES OWNED BY THE CITY OF MILWAUKEE BOUNDED BY THE FOLLOWING GEOGRAPHICAL AREA: INTERSTATE 94 AND SOUTH CITY LIMIT
02/25/2026 04:30 PM UTC
OFFICIAL NOTICE 2-1-2026
PROJECT NO. 1: SANITARY, STORM, AND COMBINED SEWER MAIN RELAY N. 6th St. – 250’ ± S. of W. Vienna Ave. to W. Vienna Ave. N. 23rd St. – 140’ N. of W. McKinley Ave. to 240’ N. of W. McKinley Ave. N. 39th St. – W. Fairmount Ave. to W. Lancaster Ave. N. 53rd St. – W. Center St. to W. Hadley St. W. McKinley Ave. – N. 23rd St. to N. 24th St.
02/26/2026 04:30 PM UTC
OFFICIAL NOTICE 26-1-2026
200 LEAD SERVICE LINE REPLACEMENTS
02/27/2026 04:30 PM UTC
OFFICIAL NOTICE 26-2-2026
200 LEAD SERVICE LINE REPLACEMENTS
02/27/2026 04:30 PM UTC
OFFICIAL NOTICE 33-6-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 6: North Forestry District: Area approximately bounded by W Hampton Av. to North City limits
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-5-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 5: North Forestry District: Area approximately bounded by W Center St. to W Hampton Av.
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-4-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 4: Central Forestry District: Area approximately bounded by W Congress St. to W Center St. & N Sherman Blvd. to Lake Michigan
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-3-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 3: Central Forestry District: Area approximately bounded by W Center St. to W I-94
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-2-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 2: South Forestry District: Area approximately bounded by W I-94 to W Oklahoma Av.
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 33-1-2026
Perform stump grinding, stump spoil removal, and site restoration work throughout the City of Milwaukee bounded by the following geographical areas. Project 1: South Forestry District: Area approximately bounded by W Oklahoma Av. to South City Limits
03/05/2026 04:30 PM UTC
OFFICIAL NOTICE 25-3-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 3: Area 3 - West City limits to east city limits, and approximately Villard Ave south to Capitol Dr.
03/06/2026 04:30 PM UTC
OFFICIAL NOTICE 25-2-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 2: Area 2 - Approximately west City Limits to the east City limits, and Mill Rd south to Villard Ave.
03/06/2026 04:30 PM UTC
OFFICIAL NOTICE 25-1-2026
Perform trunk injections of city-owned ash trees within the tree border and boulevards to mitigate the impact of Emerald Ash Borer. Work will be conducted in various locations throughout the City of Milwaukee bounded by the following geographical areas. Project 1: Approximately west City Limits to the east City limits, and County Line Rd south to Mill Rd.
03/06/2026 04:30 PM UTC
15 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 37-1-2024
Remote Bridge Upgrades at Multiple Locations
02/13/2024 04:30 PM UTC
OFFICIAL NOTICE 32-1-2024
2024 SANITARY BYPASS PUMP & SANITARY LIFT STATION INSPECTION AND BYPASS PUMP WET TESTING
02/02/2024 04:30 PM UTC
OFFICIAL NOTICE 31-1-2024
200 Lead Service Line Replacements prior to Paving
02/01/2024 04:30 PM UTC
OFFICIAL NOTICE 14-1-2024
Former Northridge Mall Fence Replacement Project
01/30/2024 04:30 PM UTC
OFFICIAL NOTICE 6-1-2024
WATER MAIN RELAYS & HYDRANT ALTERATIONS, at the following locations: North 52nd St. (WT410180623), W. Custer Av. to W. Silver Spring Dr. (24 working days); W. Sheridan Av. (WT410220615), N. 51st Blvd. to N. 57th St. (31 working days); N. 87th St. (WT410220630), W. Villard Av. to W. Lawn Av. (14 working days); N. 90th St. (WT410220631), W. Villard Av. to W. Rohr Av. (12 working days); N. 75th St. (WT410220661), 350’ S/O N. 75th Ct. to W. Talmadge Pl. (12 working days); N. 75th Ct. (WT410220662), N. 75th St. to 135’ W/O N. 75th St. (5 working days); N. Dousman St. (WT410230605), E. Meinecke Av. to E. Clarke St. (79 working days); E. Potter Av. (WT410230606), E. Russell Av. to S. Kinnickinnic Av. (64 working days); E. Falling Heath Pl. (WT410230618), S. Kinnickinnic Av. to S. Pennsylvania Av. (19 working days); E. Linus St. (WT410230698), S. Kinnickinnic Av. to S. Logan Av. (67 working days); E. Howard Av. (WT410230753), S. Lennox St. (3 working days); W. Forest Home Av. (WT410230754), 184’ SW/O W. Kelly Pl. (3 working days); E. Wells St. (WT410230755), N. Broadway to N. Van Buren St. (3 working days) (Note: Contractor to furnish and install approximately 11,030 lin. ft. of 16”, 12”, 8”, 6” and 4” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/29/2024 04:30 PM UTC
OFFICIAL NOTICE 5-1-2024
WATER MAIN RELAYS, at the following locations: N. 100th St. (WT410220600), W. Capitol Dr. to W. Grantosa Dr. (26 working days); W. Grantosa Dr. (WT410220614), 225’ E/O N. 100th St. to N. 100th St. (6 working days); N. Burbank Av (WT410220621), W. Casper St. to W Green Tree Rd. (10 working days); N. 84th St. (WT410220622), W. Mill Rd. to N. Burbank Av. (51 working days); W. Acacia St. (WT410220623), N. 77th St. to N. 80th St. (19 working days); N. 78th St. (WT410220624), W. Acacia St. to W. Casper St. (21 working days); W. Casper St. (WT410220625), N. 77th St. to N. 78th St. (7 working days); N. 100th St. (WT410220651), W. Nash St. to W. Lisbon Av. (44 working days); N. 98th St. (WT410220652), W. Metcalf Pl. to W. Lisbon Av. (8 working days); N. 85th St. (WT410220673), W. Capitol Dr. to W. Olive St. (26 working days); W. Olive St. (WT410220674), N. 85th St. to N. 88th St. (18 working days); N. 88th St. (WT410220675), N. Colgate Cr. to W. Marion St. (16 working days); N. 83rd St. (WT410220676), W. Capitol Dr. to W. Hope Av. (25 working days); W. Fiebrantz Av. (WT410220677), N. 82nd St. to N. 84th St. (11 working days); N. 20th St. (WT410230001), W. North Av. to N. Hopkins St. (10 working days); . (Note: Contractor to furnish and install approximately 14575 lin. ft. of 16”, 12”, 8”, 6”, 4” and 3” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
01/25/2024 04:30 PM UTC
OFFICIAL NOTICE 4-1-2024
200 Lead Service Line Replacements
01/25/2024 04:30 PM UTC
OFFICIAL NOTICE 92-1-2023
HT-22 HAWLEY TANK PAINTING EXTERIOR AND INTERIOR PAINTING OF THE 2MG ELEVATED, POTABLE WATER STORAGE TANK
01/24/2024 04:30 PM UTC
OFFICIAL NOTICE 94-1-2023
Remote Bridge Upgrades at Multiple Locations
01/23/2024 04:30 PM UTC
OFFICIAL NOTICE 8-1-2024
WORK ON THIS PROJECT SHALL INCLUDE, BUT NOT LIMITED TO: TRAFFIC CONTROL, INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, INSTALLATION OF STREET LIGHTING, LIGHT POLE REMOVALS, LIGHTING FIXTURE REMOVALS, INSTALLATION OF CONDUIT AND CABLE, ELECTRICAL APPURTENANCE REMOVALS, CONSTRUCTION STAKING, ETC.; Located at: Project I.D. No. - RG1515236326A Area Bounded By: West Oklahoma Avenue, West Morgan Avenue, South 6th Street to South 17th Street
01/19/2024 04:30 PM UTC
241 - 250 of 1532 Solicitations
1 2 21 22 23 25 27 28 29 153 154