General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 1-1-2025
Street Lighting LED upgrade CRP AREA B: E/W Juneau Ave. to E/W Oklahoma Ave, Lake Michigan to West City Limit
04/25/2025 03:30 PM UTC
OFFICIAL NOTICE 53-1-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 53-2-2025
GROUNDS-KEEPING SERVICES. The work shall include, but not be limited to, the furnishing of all labor, materials, supervision, equipment and services as may be necessary or requested to perform approximately twenty-six (26) landscape maintenance cycles per year (season) on property owned by the Milwaukee Water Works, hereinafter referred to as “MWW”. 1.0.2 The work shall consist of: landscape maintenance, clean-up service in the spring and fall, and specialized services.
04/28/2025 03:30 PM UTC
OFFICIAL NOTICE 18-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT, FIBERGLASS/POLYMER CONCRETE PULL BOXES, AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; ST211220209 – North 30th Street – West Atkinson Avenue to West Hampton Avenue ST211210219 – West Gertrude Drive – West Stark Street to West Grantosa Drive
04/29/2025 03:30 PM UTC
OFFICIAL NOTICE 25-1-2025
SANITARY, STORM, AND COMBINED SEWER MAIN RELAY & SANITARY SEWER MAIN LINING & MANHOLE REPAIR AND LINING N. 34th St. - W. Clybourn St. to 250’ S. of W. Clybourn St. N. 36th St. – W. Michigan St. to W. Wisconsin Ave. N. 59th St. – W. Vine St. to 460’+/- N. of W. Vine St. E. Brown St. – 140’+/- W. of N. Hubbard St. to N. Hubbard St. W. Michigan St. – N. 36th St. to 145’+/- E. of N. 39th St.
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 25-2-2025
2025 SANITARY SEWER MANHOLE INSPECTION
04/30/2025 03:30 PM UTC
OFFICIAL NOTICE 45-1-2025
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAYS, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, PAVEMENT GRINDING, REPAIR PAVEMENT JOINTS AND CRACKS, CRACKING AND SEATING CONCRETE PAVEMENT, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; TD08584031 – West Pierce Street - South 6th Street to South 9th Street West Virginia Street - South 6th Street to South 9th Street TD09484011 – South 5th Place - South Chase Avenue to West Burnham Street South 6th Street - West Hayes Avenue to South Chase Avenue West Maple Street - South 2nd Street to South 4th Street
05/06/2025 03:30 PM UTC
OFFICIAL NOTICE 35-1-2025
LS-38: LINCOLN ELECTRICAL UPGRADES PROJECT ELECTRICAL WORK TO REPLACE MEDIUM VOLTAGE SWITCHGEAR LINE-UP, AUTOMATION CONTROLS CABINET, AND RESTROOM RELOCATION AT THE MILWAUKEE WATER WORKS (MWW) LINCOLN STATION
05/13/2025 03:30 PM UTC
OFFICIAL NOTICE 56-1-2025
Election Operations Center & Southwest Shop – Boiler Replacement(s)
05/14/2025 03:30 PM UTC
9 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 95-1-2022
HYDRO-EXCAVATION SERVICES FOR THE MILWAUKEE WATER WORKS
08/16/2022 03:30 PM UTC
OFFICIAL NOTICE 91-1-2022
CONSTRUCTION OF CONCRETE TRAFFIC ISLANDS, PAVEMENT MARKINGS, SIGN INSTALLATION, CONSTRUCTION STAKING OF TRAFFIC ISLANDS, SEWER WORK, CUC, ETC.; Located at: TD4284013 – Midtown Center Reckless Driving Mitigation in the Area Bounded By: West Hampton Avenue, West Nash Street, West Appleton Avenue, to North 47th Street
08/12/2022 03:30 PM UTC
OFFICIAL NOTICE 99-1-2022
HVAC MECHANICAL MAINTENANCE AND REPAIR SERVICES Various Locations
08/11/2022 03:30 PM UTC
OFFICIAL NOTICE 88-1-2022
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, 6” CONCRETE BASE, PAVEMENT GRINDING, 31” VERTICAL FACE CONCRETE CURB AND GUTTER, DETECTABLE WARNING FIELD, 5” CONCRETE WALK, CONCRETE REMOVALS, CONSTRUCTION STAKING OF CURB RAMPS, PAVEMENT MARKING, SEWER WORK, SODDING, GRAVEL FILLING, WATER WORK, CUC, ETC.; Located at: TD4284012 – High Impact Paving/ADA Ramps Construction in the following locations: North 58th Street – West Parkway Drive to West Hampton Avenue North 61st Street – West Capitol Drive to West Congress Street North 63rd Street – West Melvina Street to West Capitol Drive North 65th Street – West Marion Street to West Congress Street North 67th Street – West Capitol Drive to West Marion Street West Fiebrantz Avenue – North 61st Street to North 64th Street West Fiebrantz Avenue – North 66th Street to North 68th Street West Hope Avenue – North 62nd Street to North 64th Street West Hope Avenue – North 66th Street to North 68th Street West Melvina Street – North 54th Boulevard to North 56th Street
08/10/2022 03:30 PM UTC
OFFICIAL NOTICE 20-1-2022
SANITARY AND STORM SEWER RELAY in: S. 14th St. – 750’+/- N. of W. Wilbur Ave. to W. Wilbur Ave. S. 16th St. – 490’+/- N. of W. Wilbur Ave. to W. Crawford Ave. S. 20th St. – W. Wilbur Ave. to W. Crawford Ave. S. 81st St. – 330’ N. of W. Ohio Ave. to W. Ohio Ave. S. 85th St. – W. Ohio Ave. to 100’+/- S. of W. Holt Ave. W. Morgan Ave. – S. 14th St. to S. 15th St.
08/08/2022 03:30 PM UTC
Official Notice 98-1-2022
100 LEAD SERVICE LINE REPLACEMENTS
08/04/2022 03:30 PM UTC
OFFICIAL NOTICE 79-1-2022
CONSTRUCTION OF 7” CONCRETE ALLEY PAVEMENT, 7” CONCRETE PAVEMENT, 8” CONCRETE PAVEMENT, 9” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, PERMEABLE PAVERS, CONCRETE TRAFFIC ISLAND, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, VARIABLE THICKNESS CONCRETE WALK AND/OR CONCRETE DRIVEWAYS, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS PAVEMENT MARKINGS, VARIABLE THICKNESS CONCRETE BASE, CONCRETE AND OTHER REMOVALS, SEWER WORK, CUC WORK, WATER WORK, ETC.; Located at the following Alley(s) Bounded By (ABB) & Intersections: ST212140109 – ABB: West Becher Street, West Rogers Street, South 35th Street, to South 36th Street ST212210103 – ABB: West Hope Avenue, West Marion Street, North 62nd Street, to North 63rd Street ST212210104 – ABB: West Euclid Avenue, West Ohio Avenue, South 12th Street, to South 13th Street ST214220101 – ABB: West McKinley Avenue, West Vliet Street, North 20th Street to North 21st Street ST221210313 – West Side Academy – 2 Intersections: North 31st Street and West Brown street & North 32nd Street and West Lisbon Avenue (SRTS)
08/03/2022 03:30 PM UTC
OFFICIAL NOTICE 100-1-2022
FOUNDATION DRAIN DISCONNECTION PROJECT Located at: Area Bounded By:W. Harrison Ave. To W. Kinnickinnic River Pkwy. and S. 60th St. to S. 72nd St.
07/29/2022 03:30 PM UTC
OFFICIAL NOTICE 85-1-2022
CONSTRUCTION VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE PAVEMENT, 8” HIGH EARLY STRENGTH CONCRETE PAVEMENT, CONCRETE TRAFFIC ISLAND, CONCRETE TRAFFIC ISLAND STAKING, 7” CONCRETE DRIVEWAYS, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 7” CONCRETE WALK, CONCRETE REMOVALS, PAVEMENT MARKING, PAVEMENT MARKING REMOVALS, SEWER WORK, ETC.; Construct work at the following locations: RG1515236120 - North 35th Street - West Townsend Street to West Congress Street RG1515236121 - North 27th Street - West Center Street to West Atkinson Avenue RG1515236122 - South 35th Street - West Oklahoma Avenue to West Forest Home Avenue RG1515236123 - East Oklahoma Avenue - South Clement Avenue to South Howell Avenue RG1515236124 - North 60th Street - West Hampton Avenue to West Silver Spring Drive RG1515236141 - North 35th Street - West Highland Boulevard to West Cherry Street RG1515236142 - West Locust Street - North 40th Street to West Sherman Boulevard RG1515236160 - Butterfly Park- West Meinecke Avenue to North 37th to North 38th Street RG1515236161 - Riverside Park - East Newberry Boulevard to North Oakland Avenue
07/28/2022 03:30 PM UTC
OFFICIAL NOTICE 97-2022
REHABILITATION OF THE NORTH 35TH STREET BRIDGE OVER PIERCE STREET
07/27/2022 03:30 PM UTC
281 - 290 of 1443 Solicitations
1 2 25 26 27 29 31 32 33 144 145