General Info

Business Logo

City of Milwaukee

841 N Broadway 5th FL, Milwaukee, WI 53202-3640
(414) 286-3309

The Milwaukee Department of Public Works has the greatest impact of any city department on daily life in Milwaukee.

We are responsible for the design, maintenance, and operation of streets, sidewalks, alleys, bridges, sewers, water mains, underground conduit, telecommunications services, traffic signals, and street lighting for the City of Milwaukee that covers more than 95 square miles; 221 city buildings, a fleet of over 1,500 vehicles, 476 acres of boulevards and green space, and 200,000 street trees.

Standard Documents

Name * Description
0 Documents

Upcoming Solicitations

Number Deadline
OFFICIAL NOTICE 45-1-2026
South 20th Street Culvert Rehabilitation
04/08/2026 03:30 PM UTC
OFFICIAL NOTICE 47-1-2026
The general work requested is: CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5”/VARIABLE THICKNESS CONCRETE BASE, 8” REINFORCED CONCRETE PAVEMENT, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, 5” CONCRETE WALKS, 8” CONCRETE DRIVEWAY, SIGN STRUCTURE, CONCRETE PLANTERS, CLAY PAVERS, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, INSTALLATION OF STREET LIGHTING FIXTURES, REMOVAL/RELOCATE EXISTING STREET LIGHTING FIXTURES, VARIOUS SIGNAGE INSTALLATIONS, VARIOUS LANDSCAPING PLANTINGS/INSTALLATIONS, GRAVEL FILLING, CONCRETE REMOVALS, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT MARKING, SEWER WORK, WATER WORK, CUC ADJUSTMENTS, ETC. Located at: TD07884203 – Lakefront Gateway, Phase III, Michigan St., Lincoln Memorial Dr.
04/09/2026 03:30 PM UTC
OFFICIAL NOTICE 36-1-2026
CONSTRUCTION STAKING ELECTRICAL INSTALLATION, REMOVAL OF EXISTING LIGHTING UNITS AND INSTALLATION OF NEW LIGHTING UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, CONDUIT, ELECTRICAL CABLE, INSTALLATION OF OTHER ELECTRICAL APPURTENANCES, ETC.; Located at: ST240260703 – Street Lighting Series Conversion NG5-6; W. Congress to W Villard, N. 35th St. to N. Sherman Blvd.
04/10/2026 03:30 PM UTC
OFFICIAL NOTICE 19-1-2026
The general work requested is: THE CONSTRUCTION OF; 7” CONCRETE PAVEMENT, 8” COLORED CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 5” CONCRETE WALK, DETECTABLE WARNING FIELDS , 7” CONCRETE DRIVEWAY, SEALING PAVEMENT JOINTS CONCRETE CURB AND GUTTER, CRUSHED GRAVEL BASE, ADJUSTMENT AND REPAIR OF MANHOLES, VALVE BOXES, AND INLETS, TREE CLEARING AND GRUBBING, PAVEMENT REMOVAL, PAVEMENT GRINDING, SAWCUTTING, EPOXY PAVEMENT MARKING, TOPSOIL, SOD AND OTHER SITE RESTORATION, ETC Located at: ST211210220 – N. Murray Ave. - E. Newport Ave. to E. Edgewood Ave. ST211210126 – N. 37th Pl. - W. McKinley Ave. to Vliet St. ST211250107 – N. Oakland Ave. - E. Locust St. to E. Linnwood Ave.
04/13/2026 03:30 PM UTC
OFFICIAL NOTICE 41-1-2026
WATER MAIN RELAYS Located at: W. Hampton Av. (WT410210626), N. 71st St. to N. 74th St. (25 working days); S. Alabama Av. (WT410220626), E. St. Francis Av. to W. Tripoli Av. (52 working days); E. Wilbur Av. (WT410220627), S. Brust Av. to S. Kansas Av. (9 working days); N. 79th St. (WT410220678), W. Capitol Dr. to W. Hope Av. (27 working days); N. 115th St. (WT410220712), W. Appleton Pl. to W. Greentree Rd. (8 working days); W. Appleton Pl. (WT410220713), N. 115th St. to W. Appleton Av. (16 working days). (Note: Contractor to furnish and install approximately 7,231 lin. ft. of 16”, 8” and 6” ductile iron pipe. City to furnish miscellaneous materials as shown on plans and proposal form.)
04/14/2026 03:30 PM UTC
OFFICIAL NOTICE 39-1-2026
EXPANSION JOINT REPLACEMENT AND CONCRETE REPAIR AT EAST AND WEST ABUTMENTS AT WEST BLUE MOUND ROAD BRIDGE OVER MENOMONEE RIVER.
04/22/2026 03:30 PM UTC
OFFICIAL NOTICE 34-1-2026
R-172 Pumps, Valves and Plumbing Improvements
05/04/2026 03:30 PM UTC
7 Solicitations

Closed Solicitations

Number Deadline
OFFICIAL NOTICE 8-1-2024
WORK ON THIS PROJECT SHALL INCLUDE, BUT NOT LIMITED TO: TRAFFIC CONTROL, INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, INSTALLATION OF STREET LIGHTING, LIGHT POLE REMOVALS, LIGHTING FIXTURE REMOVALS, INSTALLATION OF CONDUIT AND CABLE, ELECTRICAL APPURTENANCE REMOVALS, CONSTRUCTION STAKING, ETC.; Located at: Project I.D. No. - RG1515236326A Area Bounded By: West Oklahoma Avenue, West Morgan Avenue, South 6th Street to South 17th Street
01/19/2024 04:30 PM UTC
OFFICIAL NOTICE 101-1-2023
WORK ON THIS PROJECT SHALL INCLUDE, BUT NOT LIMITED TO: TRAFFIC CONTROL, INSTALLATION OF VARIOUS STREET LIGTHING APPURTENANCE WORK, INSTALLATION OF STREET LIGHTING, LIGHT POLE REMOVALS, LIGHTING FIXTURE REMOVALS, INSTALLATION OF CONDUIT AND CABLE, ELECTRICAL APPURTENANCE REMOVALS, CONSTRUCTION STAKING, ETC.; Located at: RG1515236326 – West Wilbur Avenue from South 13th Street to South 23rd Street West Crawford Avenue from South 13th Street to South 20th Street West Tripoli Avenue from S. 20th Street to South 23rd Street
12/08/2023 04:30 PM UTC
OFFICIAL NOTICE 98-1-2023
COMBINED SEWER MAIN RELAY, AND COMBINED SEWER MAIN LINING & MANHOLE REPAIR AND LINING: Located At: E./W. Locust St. - N. Dr. Martin Luther King Jr. Dr. to 85' +/- E. of N. Richards St. (Various Locations)
12/07/2023 04:30 PM UTC
OFFICIAL NOTICE 96-1-2023
WORK ON THIS PROJECT SHALL INCLUDE, BUT NOT LIMITED TO, THE REMOVAL OF EXISTING LIGHTING FIXTURE UNITS AND INSTALLATION OF NEW LIGHING LED FIXTURE UNITS PER THE INSTALLATION AND SPECIAL PROVISION GUIDELINES, ETC.; Located at: RG1515236321 – Alley Lighting Improvements/Upgrades @ Various Locations (City Wide)
12/01/2023 04:30 PM UTC
OFFICIAL NOTICE 95-1-2023
Milwaukee City Hall Temporary Façade Stabilization Located at: 200 East Wells Street, Milwaukee, Wisconsin 53202
11/22/2023 04:30 PM UTC
OFFICIAL NOTICE 43-1-2023
HARBOR DISTRICT RIVERWALK
10/24/2023 03:30 PM UTC
OFFICIAL NOTICE 93-1-2023
Project Description HP-189 HOWARD FILTER REHABILITATION REHABILITATION WORK TO REMOVE AND REPLACE THE FILTER UNDERDRAINS FOR FILTER NO. 4, NO. 5, NO. 6 AND NO. 7 INCLUDING ASSOCIATED FILTER MEDIA AT THE MILWAUKEE WATER WORKS (MWW) HOWARD AVENUE WATER TREATMENT PLANT.
10/19/2023 03:30 PM UTC
OFFICIAL NOTICE 35-1-2023
CONSTRUCTION, 7” & 8” CONCRETE PAVEMENT, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, VARIABLE THICKNESS CONCRETE BASE, SEALING PAVEMENT JOINTS AND CRACKS, PAVEMENT GRINDING, 7” CONCRETE DRIVEWAY, CONCRETE CURB AND GUTTER, 5” CONCRETE WALK, INSTALLATION OF CONDUIT AND ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, PAVEMENT MARKING, SEWER WORK, WATER WORK, TREE CLEARING & GRUBBING, ETC.; Located at: ST211200112 – North 29th Street - West Lisbon Avenue to West North Avenue
10/17/2023 03:30 PM UTC
OFFICIAL NOTICE 91-1-2023
Provision of labor, Services and Materials for Snow and Ice Removal services for the Milwaukee Water Works’ facilities. Located at: Various facility locations of the Milwaukee Water Works as outlined in the specifications document
09/28/2023 03:30 PM UTC
OFFICIAL NOTICE 3-1-2023
CONSTRUCTION OF, VARIABLE THICKNESS ASPHALTIC CONCRETE PAVEMENT, 7” CONCRETE PAVEMENT, 6’ CONCRETE BASE, VARIABLE THICKNESS CONCRETE BASE, BASE PATCHING, PAVEMENT GRINDING, CONCRETE CURB AND GUTTER, CONSTRUCTION OF HANDICAP CONCRETE RAMPS PER ADA REQUIREMENTS, DETECTABLE WARNING FIELD, 5” CONCRETE WALK, SPEED HUMP SIGNAGE ASSEMBLY, INSTALLATION OF CONDUIT AND OTHER ELECTRICAL APPURTENANCE, GRAVEL FILLING, CONCRETE REMOVALS, INSTALL PAVEMENT MARKINGS, SEWER WORK, WATER WORK, ETC.; The Before Listed Work Executed at the Following Location: ST216220107 - East Edgewood Avenue - North Lake Drive to North Oakland Avenue (Portions of which are in the Village of Shorewood)
09/13/2023 03:30 PM UTC
271 - 280 of 1553 Solicitations
1 2 24 25 26 28 30 31 32 155 156